National Repository of Grey Literature 34 records found  beginprevious25 - 34  jump to record: Search took 0.00 seconds. 
Arvin Meritor Factory Brno
Sergeeva, Anna ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Matějka, Libor (advisor)
This bachelor's thesis discusses a solution of the new-build factory Arvin Meritor in Brno, where the neglected area of the former junkyard (registered as a brownfield number 1904) in Maloměřicí between Borky and Slaměníková streets is used. Determinating the area the transverse substance has been formed perpendicular to the surrounding embankments for minimum usage of the land and the maximum variability of the completion in the future. The basic shape of the building comes from the reciprocal displacement of the production lines and their connection to the glass corridors shaping the main production part. This principle gives an interesting altitude difference, also allowing the possibility of adding further units such as auxiliary factory operations and the input unit. These features are layered in a way to make the solution as flexible and universal as possible. The "input unit" is the dominant feature of the whole building, for that, a glass facade is used to create sufficient lighting for the administration. There is a construction with red facade lamellae mounted in front of the glass facade, which is used for highlighting and shading. Copilit and sandwich panels are used on the longitudinal facade of the production part, while strip windows are pulled through the entire length and create a contact of workers with the environment. Other parts of the building used tin sandwich grey shade panels, while the roof used sawtooth skylights turned to the northeast with 45 degrees angle corresponds to the building. Finally, a suggestion of backbone traffic is also discussed in this thesis in details.
Project
Malý, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
Implementation rough superstructure hall in Poličce
Semerád, Vojtěch ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The bachelor thesis deal with technological steps od rough upper construction of a production hall to AGRICOL s.r.o. in Polička. The subject is the processing the procedure of assembly of the assembled ferroconcrete skeleton and its cladding. This thesis describes a technical report, technical report solved object, technological regulations, the organization plan and site facilities, timetable, draft report, inspection and test plans and the machinery safety and health protection at work. An additional part of the solution is the issue of the oversized transport, including solutions to the critical points of the route, budget, casing assembly procedure and selected engineering details.
Construction technology study stage
Nerada, Jakub ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis deal with the technological steps of building envelope. Technological specification is designed for wall and roof sheathing panels PUR panels th.100mm, insulated and uninsulated Borga system. The thesis includes the bill of quantities, budget, schedule, design of mechanical assemblies, occupational safety and health.
The steel construction of a volleyball hall
Kratochvílová, Veronika ; Šmak, Milan (referee) ; Štrba, Michal (advisor)
The diploma thesis deals with the study of sports hall designated for volleyball. The volleyball hall is steel construction with arched truss with span of 30 meters. Sport`s background, roofed by mono-pitch plus saddle roof, is part of south-easterly side of the hall. The hall is situated in moderate slope terrain in cadastre unit Zbraslav na Moravě. Designed hall has rectangular plan (48 x 30 m) to this belongs also the foyer and the clubroom. Clear height of the hall is 15 m. Object consists of columnal structural system with steel columns that support arched truss. Center to center spacing of main truss is 8 m. The object is set up on reinforced concrete foundation pad. Column foot is sticked in foundation pad and column head is pinned. Roof’s and wall’s bracings provide stability of the hall. Curtain walling and roof cover is made of sandwich panels Kingspan. Insolation and daylighting is guaranteed by plastic windows set in the wall.
Storage hall
Ščudla, Pavel ; Kalánek, Jiří (referee) ; Ostrý, Milan (advisor)
The master´s thesis on the topic Storage hall is processed in the form of project documentation for the realization of the new building. This building is projected on a plot 2828/108, 2828/106, 2828/105, 2828/104, 2828/222 and 2828/107 in the cadastral area Brno – Cernovice. This building is adjoined to the existing production hall and is divided into two parts. This parts are storage and administration. The administrative part has two floors and includes office space and hygienic facilities for own employees. The storage part is determined for storing of plastic products.
Multi-purpose sports building
Vrátný, Martin ; Barnat, Jan (referee) ; Pilgr, Milan (advisor)
This thesis describes the design of a multipurpose sports hall in Pribram. The sports hall is situated in the town of Pribram II. The aim of this work is to propose bearing structure with dimensions 49 x 28 halls has a background in the shape of L in the level of ± 0.000. Maximum height of the hall is 14 meters.Structure of the hall consists of arched trusses in 7 m grid supported by steel columns. This is a column support system. The building is based on the footings. Ensure stability bracing. Perimeter and roof cladding consists of sandwich panels.
Driving School and Auto Service in Uherský Brod
Juřeník, Oldřich ; Semrád, Antonín (referee) ; Štěpánek, Ladislav (advisor)
Building is designed to investor's business in a driving school and auto service of cars in Uherský Brod. It's consist of two related objects: SO01 and SO02. SO01 - two storey brick building of driving school and auto service. Construction system is Porotherm. Roof construction is single layer flat roof. SO02 - steel hall used for cars service. Object is sheathed of sandwich panels Kingspan.
Energy centre - selected parts of building technology project
Suchánek, Jiří ; Rychtecký, Martin (referee) ; Vlčková, Jitka Laura (advisor)
Master thesis Energy centre - selected parts of building technology project is solving problems connected with technological issues from the construction work supplier point of view. This thesis concerns such a parts as financial, timing and preparations are. Material used as a base was a master thesis of the student from Civil engineering department.
Technological phase sheathing of an industrial building company SONNENTOR
Trochta, Ondřej ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deal with the technological steps of building envelope. It specifies the technologicall regulations of 3 types of cladding. The first type are sandwich panels KINGSPAN, the second type is wood paneling on the sandwich panels and the third type is the stone cladding. This thesis describes technical report solved object, bill of quanttites, budget, time schedule, design of machinery, safety health and at work.

National Repository of Grey Literature : 34 records found   beginprevious25 - 34  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.