National Repository of Grey Literature 154 records found  beginprevious31 - 40nextend  jump to record: Search took 0.01 seconds. 
New town hall for the district Brno-North
Bemerová, Tamara ; Mutina, Petr (referee) ; Jura, Pavel (advisor)
The thesis proposes a town hall for the city part Brno-sever. The study is the urban design on the territory of the former barracks in Cerna Pole. City Hall building is the entrance to the building area.
New town hall for the district Brno-North
Havlíček, Jan ; Havlíček, Tomáš (referee) ; Nový, Vítězslav (advisor)
The purpouse of this thesis was finding the way to design new city hall of district Brno - Sever. It builds on a urban study from previous semesters. I have found the pattern for my concept in ancient public proto-democratic structures - agoras, phorums. By creating some sort of a district with various (not only city hall) programmes, we gain a diversified, living and vibrant public spaces, outdoors as well as indoors.
New town hall for the district Brno-North
Zatloukalová, Hana ; Pechman, Tomáš (referee) ; Sochor, Jan (advisor)
The project describes the design of a new town hall in the new proposed urban structure on the site of a dilapidated complex of military barracks in Brno in Cerna Pole. It derives the mass of the town hall from the proposed urban structure in an exposed corner of the area. Its volume solution reflects the openness and transparency of the town hall building, its structural and material solution speaks about social responsibility and the intention to "lead by example".
New town hall for the district Brno-North
Petrík, Marek ; Hanusová, Lenka (referee) ; Mikulášek, David (advisor)
The building is situated into new urban structure with a simple grid of regular blocks and streets in Cerna Pole, Brno Sever. It is designed as a solitaire which enters the park with a half of his platform. The house is sunk into the ground and his parter is interestingly and playfully communicating surrounding. House was created from a modified block as inversion of its mass. The house can be entered from both sides. From the north side and from the south side. Matter is 21m high and has a and spans 42 x 49.5 m. The key element of the plan and the communication is hinged open staircase in the hall.
Socio-cultural centre with townhall for the district Brno-Kohoutovice
Olivíková, Barbora ; Joura, Ivo (referee) ; Mikulášek, David (advisor)
The main goal of the proposal was to solve the problem of combining socio-cultural centre with town hall. To use flexibility and mix-use and connect all functions so they work together. The main idea about function of the building was how the people feels when they go to such a building as town hall. The goal was to propose the space which is transparent and remove the barriers between bureaucrats and public, so you can already see from outside what is happening inside. The concept was to design long building with the foyer along the side oriented towards the square. All is based on transparency which supports democracy and trust, removes weird feelings about solid walls and closed doors. The fasade is made from long thin wooden pieces with glass between, the appearence of the building is jumped and sloped and pointed shape which relates with the functions and break the stereotype of the estate urban structure.
Spica/ Brno, Nove sady 49°11'20.3"N 16°36'29.4"E
Jelínková, Anna ; Magnusek, Pavel (referee) ; Nový, Vítězslav (advisor)
The bachelor's thesis first deals with the design of "micro-urbanism" on the brownfield, which is located near the center of Brno. This design deals with the right strategy for the development of the site, in regards to the architectural study of the new city district and in regards to the connection to the currently open city block. The main topic of the bachelor's thesis is the design of a new building of the Brno-Central townhall. The aim of the project is to 100% use the potential of the currently unused site and to design a new town hall building for the 21st century. In the project is also counted with the utilization of the adjoining site, which is now used as a not very effective parking lot. This site is located next to the area of the freight part of the Brno station "Mala Amerika", which has a cultural and historical value. The purpose of the project is to revitalize the place both culturally and architecturally and to create an imaginary entrance to the new South quarter of Brno.
New town hall for the district Brno-North
Hotař, Pavel ; Šupler, Libor (referee) ; Jura, Pavel (advisor)
From the square dedicated to the town hall can get a unique view of the park Lužánecká Arboretum, Mendel University, and even a large part of the city of Brno. Around the southwestern edge of the square goes through the tram route, that there has also placed a stop. The tram strip is inserted into the green belt, which forms a filter of class gene. Peaks. Southeastern edge of the square adjacent to the street Provazníkova and is located on the trolley stop. Otherwise, the square bordered by commercial and office buildings. Town Hall is located in the northeastern part of the square so that overshadow the view from the street Krkoškova axis. When I draft Hall based on the assumption that it should be as simple and most transparent, so that by himself rewrote what is happening inside and out. That's why I chose it as its top square shape. In it, I put a little more illuminating atrium in the shape of a square. This solution, I then wrapped into a simple facade with a clear grid. That I then increased as needed to pick up the importance of the interior.
The new town hall of the city of Brno
Cinklová, Sára ; Obrtlík,, Jan (referee) ; Májek, Jan (advisor) ; Pěnčík, Jan (advisor)
The subject of this bachelor thesis is a design of the new Brno town hall. This project is based on the architectural study which was carried out within the course AG032 Ateliér architektonické tvorby II and is extended by the building permit documentation and the building implementation documentation. The area of interest is located in the Město-Brno district, between the Benešova and Koliště street. It is an office building with commercial units. It is a seven floor building with two underground floors. Underground floors are primarily used for parking. Part of the first floor is dedicated to rentable commercial units. The rest of the building is used as a municipality. The first two floors are accessible to the public. In the remaining floors are offices with limited public access. Individual departments are separated by floors or defined by the floor plan. The number of offices and their sizes are adjusted to the tectonic plan.
Špica/ Brno, Nové sady 49°11'20.3"N 16°36'29.4"E
Nesvadba, Filip ; Turcovský, Štefan (referee) ; Marek, Jiří (advisor)
The bachelor thesis deals with a concept of open city block and designs town hall for Brno – centre. Discussed area is situated on the corner of Hybešova street and Nové sady street. At present, there is number of smaller buildings and some hard surfaces used as parking place. The area is very close to the city centre and it is found under the Petrov hill with the Cathedral of Saints Peter and Paul that dominates the city’s landscape. From the city’s perspective, the locality is very attractive also thanks to its good public transport connection. The aim of this urbanistic concept is to create connection of the area with the city, as well as variation of functions of the new object and composite the object appropriately into the current structure. The town hall in its public significance proposes to become an important building for the locality but also for the whole city Brno.
The object of metropolitan significance on the street Benesova Brno
Kozák, Jan ; Nový, Vítězslav (referee) ; Hybská, Bohumila (advisor)
Design of a new metropolitan city hall located on the Brno ringstrasse concentrates all workplaces city government in one place, namely in the northern part of the embankment between Benešova and Koliště streets near the former customs building palace Moravia. The underlying assumption is the future transfer of the main station and the release of area for the park (today trackage) and other construction.

National Repository of Grey Literature : 154 records found   beginprevious31 - 40nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.