National Repository of Grey Literature 48 records found  beginprevious21 - 30nextend  jump to record: Search took 0.01 seconds. 
Leisure Center - Mojmire
Knichal, Filip ; Žalmanová, Petra (referee) ; Šindlar, Jiljí (advisor) ; Kacálek, Petr (advisor)
This bachelor thesis is based on my architectural study, which was made in the third year of the academic year 2018/2019. The main task for this study was to design a leisure center for children, youth and adults in the cadastral district of Mojmírovo náměstí, in Brno – Královo Pole. The aim of this thesis is to elaborate the study to the level of documentation for building permition and documentation for construction. The plot is located in a gap site between a 5 storey new residential building with a flat roof and a 2 storey historic building with a saddle roof. In the surroundings there are mostly 5 storey apartment buildings together with the original historical development of family houses. A design of the leisure center tries to respect the height levels of the surrounding buildings and their spatial zoning. The ground plan does not exceed the depth of the surrounding buildings and the surrounding buildings are not shielded. The structure is 4 storeys, without basement, oriented to the east and west side, based on the space of the gap site. It contains two independent functional units: a leisure center and a hall with commercial space. The proposed building with a garden can be used for leisure activities, cultural and social events, and it will also expand the insufficient capacity of the classrooms and the premises of the Košinova elementary school in the morning. In the afternoon, the building, including the garden, will serve as a public meeting point. The idea was to create a multifunctional building for the needs of the local community. The leisure center in this place has its merit, because it is located right on Mojmírovo náměstí in the center of the action and the large garden is connected to the elementary school Košinova. The idea of the study was in the maximum glazing of the facade, which will reflect various greenery on the square, so it will also be open to the community, thanks to its transparency. The structure of the building is monol
Concrete slab of a residential building
Benčíková, Mária ; Požár, Michal (referee) ; Perla, Jan (advisor)
The bachelor thesis deals with the design of the floor structure of a multi-storey apartment building on the floor with masonry walls. Particular emphasis is placed on the interruption of the thermal bridges at the balcony boards and the reduction of the impact sound propagation from the staircase to the surrounding structures. Verified deformation of the structure due to the integrity of the discharged ceramic partitions. RFEM 5.18 computational software is used to model the structure and solution of internal forces. Calculations are made according to ČSN EN 1992-1-1 and ČSN 73 1201.
Reinforced concrete structure of a cottage
Fuit, Daniel ; Zich, Miloš (referee) ; Strnad, Jiří (advisor)
The bachelor thesis deals with design of a monolithic bearing structure recreational object and the assessment of selected bearing parts of the structure. The object is placed in the hillside. All bearing parts of the structure are interconnected and thus form a rigid unit. Calculation of load effect was made in SCIA Engineer 18.1. Selected bearing parts of the structure were assessed for the ultimate limit state and the serviceability limit state using the MS Excel spreadsheet editor. The final output is the drawing documentation of the assessed bearing parts of the structure.
Architectural study of the sacred building and the Salesian community center in Brno - Líšeň
Jakubíková, Kateřina ; Boháč, Ivo (referee) ; Šindlar, Jiljí (advisor)
This final thesis deals with a design of an architectural study of a religious building and a community center for the Salesians in Brno-Líšen. Local Salesians have their Salesian center here adjacent to the discussed plot. They have been devoted to youth education for thirty years, following the example of their founder Don Bosco. However, they lack suitable spaces for conducting church services, meeting with worshippers, and other related activities. The architectural study deals with the design of The Church of the Holy Spirit with facilities for worshippers, which addresses the problem of a suitable spiritual place for church services. The complex is divided into three parts. The main feature of the design is the oval-shaped Holy Spirit church, which is intended to stand out and, at the same time, have a clean and positive impact on the surrounding slab blocks. Cleanliness and delicacy reflect into the interior of the church as well, where a white oval space and a monumental stained-glass window in the presbytery cast colorful reflections, creating an oasis for the soul and body. The oval-shaped church is composed of a central oval, in which the main space of the church for conducting church services for 400 worshippers is located, with a second oval that surrounds it and includes auxiliary functions for the church's operation, such as a sacristy, a room for parents with children, technical facilities, or a choir rehearsal room with the main organ in the second floor. The community center and the parish office form a single unit, symbolically linked by a courtyard. Together they form an L-shaped floor plan and their cubiform building contrasts with the oval dominance of the church. The community center directly adjoins the church from the north, providing hygienic facilities and a social hall for leisure activities such as religious education or meetings for worshippers. The parish office is a two-floor building, with technical facilities on the ground floor, a guest room with a bathroom, and a shared kitchen for the priest with an entrance to the courtyard, where they can spend time undisturbed. The second floor is purely private, housing the Salesians and their private chapel. The surrounding of the church is designed for both worshippers and the general public to rest, walk, and enjoy the green spaces with trees and benches for relaxation and enjoying the views of Brno and the distant Pálava. Visitors can walk the Stations of the Cross, which are part of the southern facade of the church in the form of stained-glass windows, or use the outdoor presbytery for church services and other events. Admirers of bells can be attracted by the hung bells on the southwest wall of the church, which will invite them to the church services.
New construction of an administrative building in the Brno - Slatina district, preparation for construction
Stehno, Pavel ; Brandtner, Michal (referee) ; Šlanhof, Jiří (advisor)
The diploma thesis deals with constructive-technological project of the administative building "O" in Brno, Slatina. This project deals with constructions of the building, construction site, process of realisation of monolitic constructions, budget and schedule of building.
Apartment building
Kanichová, Barbora ; Pulec, Vladimír (referee) ; Perla, Jan (advisor)
This diploma thesis deals with the project of the structure of ferroconcrete multistorey building. Selected parts of assessment are pint-supported slab over the 1st floor, inside column, external wall. Finite Element Method in software Dlubal RFEM 5.28.03 was selected for analysis. Another part of the thesis is the project of dimensions of foundations that are dealt with as deep foundations in accordance with the engineering-geological survey.
Apartment building
Machalíček, Šimon ; Klodner, Jan (referee) ; Perla, Jan (advisor)
The master´s thesis deals with a desing of apartment building structures. The basis of the thesis is assesment of selected structures (ceiling, walls, beam) by structural desing and subsequent proposal of necessary reinforcement of assessed structures. The outcome of the whole thesis are the drawings.
Production buildings, Production of aquariums in Brno
Drápela, Jan ; Maar, Radek (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
This bachelor thesis aims to design a new building for manufacturing aquariums with part for administration and public part in Horní Heršpice. This project is based on a study made on a subject named AG035. Horní Heršpice is Brno city district located in the south part of the city. The building plot is located on the street Sokolova. The building plot has an irregular rectangular shape without major restrictions. The building can be visually divided into two parts – lower one front with public part and administration and higher part with production hall. The front part is partially sunk below ground level which brings it closer to passing visitors and offers views from the aquarium. Compared to other buildings it is clad with yellow corrugated facade panels. The entrance hall opens to visitors and provides separate entrances to the exhibition space in one part and administrative space in the other part. The second building is significantly higher clad in bright color panels. From one side there is an embedded lower part with support areas with yellow cladding. The buildings gradually rise. Both buildings are connected with a glazed corridor. One of the primary tasks of the design is to create a well-organized and collision-free space. The building is divided into two different hight levels and has no cellar. A structural system of administrative part is a cast-in-place concrete structure, the production hall with support areas is from precast concrete frame.
Construction technological project of the production hall in Sudoměřice
Kolacia, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
Galéria Lučenec - selected parts of the construction technology plan
Jakobei, Michal ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The main purpose of this thesis is to describe in detail the processes of selected parts of the construction technology project for the construction of the department store Galéria Lučenec, based on the project documentation provided by the principal engineer. It is a large-scale new building with a cast-in-place reinforced concrete load-bearing structure with steel elements located in the center of Lučenec. The diploma thesis consists of the main parts such as the technical report of the construction technology project, a detailed coordination situation of the construction site, and a detailed time and financial plan of individual buildings. Within the main building, a study of the main technological stages of construction, elaboration of the project site equipment together with the associated design documentation and the technical report, design of the main construction machines and mechanisms, time schedule of the main building processes, and an item budget are described. Within the technological regulation and the control plan, the diploma thesis is focused on the cast-in-place structures of the superstructure. In the final part of the project, there are chapters devoted to topics such as occupational health and safety on the construction site, evaluation of LEED 2009 certification, the procedure for securing the construction pit, and the assessment of the main vertical lifting mechanisms.

National Repository of Grey Literature : 48 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.