National Repository of Grey Literature 273 records found  beginprevious125 - 134nextend  jump to record: Search took 0.04 seconds. 
Design of a New Hall Supply System
Ťopková, Lucie ; Horák, Petr (referee) ; Videcká, Zdeňka (advisor)
This bachelor thesis deals with a design of a new hall supply system of the company IMI Precision Engineering. The first part focuses on the theoretical basis of the topic. The second part, called analysis of the current state, defines supplying methods used in the company and describes the relocated production. This analysis is followed by the design part, which focuses on the design of the supply grid, regular transport of material between the old and the newly purchased hall and an internal MilkRun.
Analysis of material flow and level of inventory between production sections in time
Lanzendörfer, Tomáš ; Hloska, Jiří (referee) ; Hloušek, David (advisor)
The bachelor’s thesis deals with an analysis of material flow between manufacturing sectors connected by an intervening storage. The first part is focused on detailed analysis of logistics and inventory theory. The second part is focused on a simulation model creation. The simulations are realized in Tecnomatix Plant Simulation software, developed by the Siemens company. At the end of the thesis there is a conclusion of the analyses.
Study Logistic Concept in Manufacturing Company
Flídr, Jan ; Šimeček, Jan (referee) ; Jurová, Marie (advisor)
The thesis is focused on the implementation of kanban system in the company Daikin Device Czech Republic s.r.o. The theoretical part describes the principles of logistics, lean production and inventory management, including their basic tools and methods. In the practical part of the thesis, Daikin Device Czech Republic Ltd. is introduced, where the analysis of the current state of supply logistics in the production hall is performed. Based on the analysis is designed kanban system including the way of its implementation. Furthermore, the risks of kanban system implementation are analyzed. Finally, the economic and uneconomic benefits of the kanban system for the company are evaluated.
Proposal of Material Flow Changes with Respect to Production Process
Koláčková, Veronika ; MBA, Martin Mlčák, (referee) ; Jurová, Marie (advisor)
The diploma thesis deals with optimization of material flows in the company Pamet spol. s r. o. The thesis is divided into four parts. The first part describes the company business, its production program, customers, suppliers and competitors. The second part is theoretical, it contains an explanation of theoretical concepts that are taken into account wile writing this thesis. The third part analyzes the purchase, supplier evaluation and storing in the company. The final part brings suggestions how to solve the problems identified in the analytical part.
Project of silo for powdery materials
Kadyrgozhin, Yermek ; Malach, František (referee) ; Malášek, Jiří (advisor)
The principle of this thesis is to design of the silo for bulk materials. In the thesis is there an analysis of the choice of type and construction of the silo, design of main dimensions and strength calculation of the silo. Then there is described active and passive stress state of the silo and their influence on filling and emptying. The thesis deals the possibility of the formation of buckling vault (bridging) during emptying and ways to solve it. There are also described various possibilities of modifications and equipment of the silo in relation to the type of material.
Layout solution of a small workmanship within a given company
Bodnár, Daniel ; Dvořák, Milan (referee) ; Štroner, Marek (advisor)
Thesis is focused on machining workshop layout design for hot runner nozzle production. Production volume is 9,000 pcs/year. Theoretical part describes workflow and principles of technological design process. Based on capacity calculations, two variants of production plant layout were designed. The frist design has an area of 237 m2, the second one 211 m2. The two variants were evaluated in terms of technical and economical aspects.
Modification of material flow in production area
Řehák, Karel ; Hloska, Jiří (referee) ; Sedláček, Martin (advisor)
The content of this bachelor thesis is to create a simulation model of the production process and logistics chain in order to evaluate the impacts of proposed changes in the production process parameters. The simulation model is created by Plant Simulation software from Siemens PLM Software. An analysis of the discussed area i salso included in the thesis. With the help of the simulation model it is tested if the modification of the production pro-cess elements has a positive effect on the production characteristics of the given area.
Logistics Concept with a Focus on the Production Line
Jurásková, Anna ; Horák, Petr (referee) ; Jurová, Marie (advisor)
This bachelor thesis deals with the study of the production logistics concept in the selected company. At first I focus on the logistics concept of the whole company and then analyze the current material status of the production line. Based on the findings, I will make a draft for continuous material flow on the given line.
Logistics Concept with a Focus on Material Flow Management
Lojek, Jindřich ; Horák, Petr (referee) ; Jurová, Marie (advisor)
The bachelor thesis is focused on the material flow analysis in the company. Various methods of analysis are used in the analytical part, in order to determine whether the component is meant to be stored in the shelf or whether it will be picked at the request. The practical part will analyze the material flow of a specific production line. The appropriate changes in the material stock in the production area will be suggested based on the analysis. The quantity and the method of material ordering from the warehouse will be defined for the material stored in the shelf.
Proposal of Modification from Warehouse to Production Material Handing System in Selected Company
Orvanová, Katarína ; Kuba, Karel (referee) ; Bartošek, Vladimír (advisor)
The bachelor thesis is focused on the proposal to modify the system of material release from the storage to production in company DIEFFENBACHER-CZ, hydraulic presses, s.r.o (DCZ) The aim is to reduce the accumulation of logistics in production. Achieving the set aim will speed up production and increase capacity of output.

National Repository of Grey Literature : 273 records found   beginprevious125 - 134nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.