National Repository of Grey Literature 135 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Koks production hall - upper stage of construction
Vaculík, Zdeněk ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
Subject of this work is execution of the superstructure, especially solution of mounted frame included the lining together with the sheathing construction and building roof. The building will serve as assembly and storage hall for the Koks Production company. Reinforced concrete precast frame forms supporting structure. The building is split to two parts, single-storey hall and two-storey administration part. Construction-technological part from complete execution of the building rough superstructure has been selected as a bachelor’s thesis subject. The technological regulation for the assembly of reinforced concrete precast frame has been elaborated. The precast frame is formed by precast elements supplemented by the lining between the columns in the administration part. The solution of following subjects of building construction was taken into consideration too: • solution of suitable site machinery • workers health, safety, and preservation on the site • health protection • test and trial plan for the mounted reinforced concrete skeleton • time schedule and economic analysis for the superstructure • logistics and material storage on the site
Multifunctional center Hlinsko - preparation and realization construction.
Šusták, Miroslav ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
Diploma work Multifunction Centre Hlinsko - preparation and realization of the covers technological studies throughout the building. Diploma work proposes a temporal, financial and material resources. The work included construction budget, schedule of work, technical regulations for demolition, implementation and installation of reinforced concrete ceiling glulam beams. For each technological regulation is developed inspection and test plan. The work includes the project site equipment. Diploma work is based on the technical documents supplied by the designer. The work also includes specialty.
Proposal of Site Facilities
Lexová, Klára ; Plas, Roman (referee) ; Waldhans, Miloš (advisor)
The thesis deals with principles of designing building site facilities and application of these principles on a specific construction contract. It also deals with the cost of site facilities, and it compares the two used valuation methods.
The terraced houses in Svitavy - the construction technology project
Bajerová, Radka ; Klempa, Lukáš (referee) ; Motyčka, Vít (advisor)
The subjects of the thesis are chosen parts of the building technological project for the preparation and realization of the terraced family houses in Svitavy. The solution includes The study of the main technological stages realization, Time schedule and financial plan, The project of the site facilities including design of the main hoisting mechanism. The realization of ceiling construction is described in detail by The technological prescription. The solution also includes a proposal of local and utility roads repairs on the streets Gorkého and U Studeného potoka.
Pension PREMIER in Janov nad Nisou, implementation of finishing works
Pavlíková, Jana ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
In the bachelor thesis I have dealt with finishing work on the top, where I focused on making plaster Hasit and construction of sauna. Plasters are made manually from before-spraying, the core of plaster and final stucco plaster. The construction of sauna lies in the design of the squared timbers. Insulation - PU boards is located among them. The final surface is made use of floorboards, which are made from Scandinavian spruce. The object for which I work processed, is located in a secluded spot in the village called Janov nad Nisou. This is of the changes to the existing layout pension Premier and his extension. As part of my bachelor thesis I'm dealing with technological stage on both objects at the same time.
PPension - technological phase coarse upper construction
Řihák, Pavel ; Henek, Vladan (referee) ; Henková, Svatava (advisor)
The thesis is focused on construction srubového pension. It deals with issues of selected technological part of the project, which are: technical report biotic pests of wood, wood protection, technological process timber harvester, log walls, ceilings, roof, site facilities, the construction schedule, naazení machines, inspection and test plan, safety and health protection at work.
Implementation of lower structure of Komplex Moravia Thermal
Šťastná, Ludmila ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
Bachelor thesis deals with construction and technological project of gross superstructure object Wellness, which is part of Moravia Thermal Pasohlavky. The project was handled technical regulations for the implementation of monolithic construction and installation of wood trusses. The work also addresses the principles governing the organization of construction, dealing with the quality of the construction, economics and duration of construction.
Realization of roofing of industrial buildings in Ostrava
Mík, Petr ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
The subject of my the solution of technological stage of roofing a trade and to industrial hall in Ostrava. It solves implementation of flat roof of the manufacturing hall. The work includes budget and time frame, inspecting and test plan, technical report, technological regulation and other technical documentation in compliance with assignment.
Preparation of the Building Order
Pandulová, Iveta ; Čížek, Josef (referee) ; Waldhans, Miloš (advisor)
The purpose of my bachelors thesis is to help gain an understanding of specific principals, methods, and approaches in setting up construction contracts and applying these components into actual projects. The thesis is divided into two separate parts, the theoretical and the practical. The theoretical segment discusses the general issues which then proceed to be applied to a specific contract.
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.

National Repository of Grey Literature : 135 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.