National Repository of Grey Literature 114 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Campus TRIANGL Uherske Hradiste - construction technology project
Chamrádová, Klára ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The subject of this thesis is a construction technology project Areal triangle in the town of. The work includes a technical report on the structural and technological project technical report construction site along with drawings of building equipment, technological prescription for the implementation process of monolithic structures, being associated inspection and test plan, as well as draft mechanical assemblies, technical report broader transport relations, including drawings, itemized budget calculation according THU and the timetable for construction. It also dealt with contract work, instructions for use of the building and assess two variants of cranes in economic terms. Also at work are chapters dealing with safety at work and environmental protection. More specifically, the work deals with one of the main buildings, namely the object SO10 - Building A. The construction is a reinforced concrete monolith on five floors. The work is mainly focused on the shell construction.
Training Center Zašová - construction technological project
Janíček, Jakub ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The subject of work is building-technology project Training center in Zasova. The study includes a technical report on the construction technological project, technical report of the site equipment project including a drawings, design of the main building machines, technical report of transport relations, itemized budget, the detailed time plan of the construction, technology regulations to of the selected construction processes, inspection and testing plans, occupational safety, environment, contract for construction works, major lifting mechanisms evaluation from an economic perspective.
Warehouse in Šakvice - construction technological project
Knotek, Vít ; Valenta, Michal (referee) ; Biely, Boris (advisor)
Main goal of this thesis is effective design and comprehensible description of the assembly of reinforced concrete skeleton warehouse in Šakvice. In several chapters of this thesis is for preparing of this investor´s plan solved supplies prefabricated components. As well as their assembly into construction, equipment of construction site, used technologies, quality control and safety of performed works. There is great emphasis on the construction budget and its chronology. The aim was to use the rapid progress of construction of the supporting skeleton, taking into account the financial coast of the proposed technology.
Price of Construction and Possibilities of Supplier
Veselá, Michaela ; Vítková, Eva (referee) ; Puchýř, Bohumil (advisor)
The aim of this thesis is to describe the possibilities contractor in determining the price at possible changes during the process of construction supplies. You need to have a set price of construction work, which is a necessary part of the work contract. It is good to know the rights and obligations of the parties in the construction. In the practical part, the work deals with the possibility of fixing prices as well by the contractor under the contract for work.
Subcontract Management in a Construction Company
Horáková, Kateřina ; Pražáková, Jana (referee) ; Waldhans, Miloš (advisor)
This thesis describes a subcontract management in a construction company. The theoretical section explains the terms of project management and project organization. This is followed by a practical section explaining how a construction company and its system of processing selects a subcontractors. This part of the thesis describes the filling of a particular construction order. The last part is the evaluation of the construction company’s current system and the system’s eventual improvement.
Construction Order Management
Saňáková, Miroslava ; Jurkovič, Peter (referee) ; Waldhans, Miloš (advisor)
This diploma thesis solves problems of construction orders management. The key to successful business and stable position in a competitive market is the way of planning, managing and quality processing of construction orders. The aim of this diploma thesis is to describe and analyze the management of a construction order in a selected company, in my case ARCHATT, s.r.o. I also deal with this in this work, namely for the specific order Oprava Severního parkánu a hradeb of Prague Castle. The content of the work is a processed documentation of the supplier's preparation for this order and a detailed description of the entry of construction workers to this daily guarded building.
Architectural and technological project of reconstruction surgeries KPRCH University Hospital Brno
Hačka, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this work is to prepare the implementation of the reconstruction and extension of the Teaching hospital Brno Bohunice. Implementation of major technological stages is addressed in building technological study. Work includes selected legal procedures before the start of construction work, such as opening the envelopes and investor-supplier contract for the work. Further work solution contains selected technological processes of each sub-job phases, complemented by technological regulations, proposals for major construction machinery, selected inspection and test plans. As part of my work I will work with subcontractors to perform CFA piles, so I deal with on demand system for subcontractors, notice of award, issuing orders and delivery site for subcontractors. I believe that the subject of occupational health and safety on the jobsite is an important chapter construction and will therefore address the safety and health of people at work drawing up a plan OHS and OHS coordination meetings. Work will also be supplemented by information site equipment, time and financial plans and drawings of all the individual components specified in the Annexes. The content of my work is also a doctoral student competition entitled "Modern technologies and materials", where thoughts about the implementation superaseptických surgeries new technologies. This work will be the content of the text section of the attachments, always mentioned with the name of specialization.
University Campus Bohunice - Construction Technological Project
Moravec, Jan ; Čech, David (referee) ; Štěrba, Martin (advisor)
This diploma thesis addresses the „University Campus Bohunice - Architectural and technological project“. This thesis includes excavation, pile foundation, reinforced concrete foundation slab it also deals with in detail technological regulations on earthworks and deep-pile foundation. The thesis contains solutions to building equipment, schedule of selected stages of the construction situation with the solution of transport routes, designed mechanical assembly required for selected stages and control plan earthworks and deep-pile foundation. This diploma thesis addresses the „University Campus Bohunice - Architectural and technological project“. This project involves construction of two buildings. Building A32 with two basement floors and three floors and second building A 31 with one basement floor and three floors. This thesis includes excavation, pile foundation, reinforced concrete foundation slab, it also deals with technological regulations of earthworks and deep-pile foundation in detail. The thesis contains solutions to construction site equipment, schedule of selected stages of the construction, location of buildings and the solution of transport routes, mechanical equipment required for selected stages of project and control plan of earthworks and deep-pile foundation.
Construction and technological project of pharmacy in the area of University hospital Olomouc
Homolová, Sandra ; Štěrba, Martin (referee) ; Novotný, Michal (advisor)
The subject of my thesis is the technology of pharmacy building in the area of University Hospital Olomouc. I deal especially with foundation of the building on bored piles and cast-in-place concrete structures. The work includes engineering reports, time scheduling of the building, itemized budget, site equipment, health and safety plan, two technological prescriptions and two inspection and test plans. The last chapter is devoted to the contract for work.
Damage Caused to the Building work by contractor
Musil, Martin ; Ing.Milada Galatíková (referee) ; Marková, Leonora (advisor)
The aim of the thesis is describe how discounts are formulated in construction work. Different types of discounts are discussed from the point of view of the constructor. Mechanisms of providing discounts and calculations of total discounts are studied. Contract and signing over the construction work are analysed, because of their importance to prevent disagreement between customer and constructor.

National Repository of Grey Literature : 114 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.