National Repository of Grey Literature 307 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Preparation of the implementation of the relaxation center in Moravany
Juříková, Michaela ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The aim of the thesis is to develop a construction technology project for the implementation of a relaxation center in Moravany. The work includes the preparation of a technical report on the construction technology project, the coordination situation of the construction with wider relations of transport routes, the time and financial plan of the construction – object, the study of the implementation of the main technological stages of the construction object and the construction site equipment project. Furthermore, the work deals with the design of the main construction machines and mechanisms, the time schedule of the main construction objects, the plan for securing material resources and technological regulations. Technological regulations are focused on the implementation of a green roof and a ventilated facade. A quality control and test plan was developed for the implementation of the green roof. Last but not least, the work includes a calculation according to THU, an itemized budget of the main building objects, a scheme of the piloting process, an assembly scheme and an OHS plan.
Polygrafic production PROGRAF
Ptáčková, Eva ; Burianová, Lenka (referee) ; Kacálek, Petr (advisor)
The aim of this Diploma thesis is the elaboration of the project documentation of a construction part for realization of the new building of the production hall and administrative building in a city of Slavkov u Brna. According to the local zoning plan, both buildings are designed on a plot in the development part of the city. The selected plot is conveniently located due to good accessibility to the D1 motorway. The office building will consist of two above-ground floors. On the first floor there will be the management of the company and the head of the press, the economic and commercial department, hygienic facilities. On the second floor there wil be a graphic studio, a day room and a spacious terrace. The construction system of an office building will be a wall longitudinal. The ground plan of the object is rectangular. the roof is designed as a mono-pitched roof. The factory is a single-storey building. Inside the factory hall there will be a polygraphical technological equipment. The location of the machines is only indicative as well as their choice. The hall will have its own equipment equipped with air conditioning and heating. It is designed as a precast concrete frame. The system is designed longitudinal. The object is a rectangular ground plan with a saddle roof.
Facelift PDU
Zhakupbekova, Rakhil ; Kyselka,, Mojmír (referee) ; Nový, Alois (advisor)
The subject of the diploma thesis is the elaboration of an architectural study of the reconstruction of the pre-plant zone of the Facelift of the Dukovany power plant. The construction site is an area that belongs to the village of Dukovany and borders the village of Rouchovany. As a whole, this area is in poor technical and architectural condition. However, its location gives potential for new uses. The solved area belongs to the ČEZ nuclear power plant.
Office Centre
Ďureje, Andrej ; Šmak, Milan (referee) ; Pilgr, Milan (advisor)
The content of diploma thesis is designing, project development and static estimation of the supporting steel structure in two different variants of the atypical office building (business center). The object is located in densely built-up location in the Brno. The building is designed as a seven storey. The entrances to the above ground floors are designed from balconies, which are roofed and situated on the edge of the object. The footprint dimensions are 57,6 x 57,6 m. Variants are compared based on weight and size of the coating surfaces supporting construction of the object. Drawing documentation, static calculation of joints and details of the construction are processed for the best variant.
Technological Solution Green Roofing of the Office Building in Brno, Královo Pole
Hrazdira, David ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The bachelor thesis deals with the constructive and technological solution green roofing of the office building in Brno, Královo Pole. It solves implementation of the warm flat green roof. The work includes technical report, budget and time frame, technological regulation, inspecting and test plan and other technical documentation in compliance with assignment.
Hall for Metal Production with Administrative Building
Kaňok, Vojtěch ; Melcher, Jindřich (referee) ; Karmazínová, Marcela (advisor)
This diploma thesis deals with the design of a metalworking shed with its adjacent administrative center. Both objects are statically independent. The buildings are located in the town of Bučovice. The dimensions of the shed are 54,78x72,58 m. There is an overhead crane situated in the middle wing. The shed‘s height is +11,62 m. The administrative building has L-shaped plan. Its dimensions are 27,62x8,13 m (the wider part is 15,63 m). The design of the administrative object has two variants. Both variants have composite steel-concrete ceiling structure. The heights of the objects are +11,20 m (A variant) and +18,20 m (B variant). For the A variant, drawings were also drawn up with the design and assessment of structural details and anchoring.
Facelift PDU
Růžičková, Tereza ; Kyselka,, Mojmír (referee) ; Nový, Alois (advisor)
The theme of the diploma thesis is the solution of the pre-plant zone of the Dukovany nuclear power station. Creating a vision of how this space could develop further in the next 50 years and how it could work in a transitional phase during the construction of a new nuclear power plant unit. The subject of the thesis is the elaboration of an architectural study, which is based on an urban study. Urban study was processed within the framework of the pre-diploma thesis and solved mainly the overall problems of this area, the new transport connection, and the functional division of the whole area. The area was divided into three functional units, namely the transport zone, the administrative zone and the sports and education zone. At present, there are a lot of small structurally and functionally unsuitable buildings in this area. The diploma thesis deals with the design of new buildings with a clear functional use in the administrative zone, in the area in front of the main gatehouse. A new representative square was created, and three buildings are designed around it. The dominant feature of the whole area was a high-rise office building near the gatehouse. In front of the office building, towards the main road, the service building I was designed, which contains business and healthcare services. On the other side of the square was located the service building II, where there are technical services, such as workshops, warehouses and metrology. The last building solved within the diploma thesis is the building of sports and locker rooms of suppliers, which is designed behind the square near the greenery. New building copies mass of the only preserved building in this area, namely the building of the information centre. The designed building has a fitness centre and locker rooms of external workers of the power plant.
Corporate headquarters Dlabaja a.s.
Dlabaja, Adam ; Burianová, Lenka (referee) ; Petříček, Tomáš (advisor)
The project documentation, processed in the framework of the diploma thesis, solves the new building of the administrative building of the building company in the village Lukov u Moravských Budějovic. The building is made of traditional brick technology therm tl. 50 cm, without insulation, ceilings are reinforced concrete, flat roof, vegetation. Vegetation is also part of the facade of the building, which at the same time serves as a root cleaner. The philosophy of the whole design is to create a high-quality working environment for building company employees, a pleasant environment for customers and to best solve the environmental footprint of the building. The building is designed as a modern office building, with space for leisure activities of staff and their visits, taking into account the responsible approach to the development industrial site and the surrounding nature. The building efficiently manages potable, rain and wastewater, the envelope of the building, and the individual structures are designed to make the entire building as energy-consuming as possible, and do not pump irreparably by nature its natural resources in a larger quantity than necessary.
Inventure of the City Center ? Brno – Veveří – Žerotínovo náměstí
Holá, Martina ; Chládek, Pavel (referee) ; Hybská, Bohumila (advisor)
The main subject of the thesis is a revision of current area framing northwest part of Žerotín Square, that nowadays consists of so called White house (center for children health care and a seat of a medical school). The design is based on theoretical situation concerning the removal of White house and therefore it uses the newly existing place as a subject for new architectural solution. The solution emphasizes the completion of current block of buildings with large courtyard and corner between Žerotín Square and Veveří street, which is very important for traffic. The thesis is focusing on finding the right form, scale and functional content which would reflect the importance of the location, especially focusing on the Brno’s ring road that goes directly to Denisovy sady and accessibility of this city’s part. It also respects the design of the back side of the Red Church. The design uses the newly existing place as a location for new apartment building that reflects the scale of similar buildings in Marešov and other nearby streets and it also proposes administration building as an architectural solution for this location, which would be used as a seat for both municipal and national institutions.
Administrative center Hodonin - building and technological project
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.

National Repository of Grey Literature : 307 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.