|
Sports complex - construction and technological preparation
Petruška, Tomáš ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The diploma thesis solves the construction technology project of sports complex. The aim of the thesis is rational proposal of construction and resources. The thesis contains plant building site, technological instruction, budget, time schedule, control and trial plan, design and assessment of lifting mechanism and machinery used over construction, contract for work and safety report. Part of the thesis is specialization in sports surfaces.
|
|
Nursery school and multifunctional building Želivec - preparation and realization
Král, David ; Jiří,, Šlanhof (referee) ; Mohapl, Martin (advisor)
The masters thesis with the name Nursery school and multifunctional building Želivec solves preparation and realization of building. The aim of masters thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
|
|
Selected Parts of Building -Technological Project of Biogas Station in Heralec
Píštěk, Kamil ; Šlanhof, Jiří (referee) ; Mohapl, Martin (advisor)
The master thesis with the name Selected Parts of Building -Technological Project of Biogas Station in Heralec solves preparation and realization of building. The aim of master thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
|
| |
|
Preparation of realization apartment building in Dvůr Králové nad Labem
Možíš, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
|
| |
|
Viennese apartment house -building technology project
Staněk, Martin ; Nečasová, Barbora (referee) ; Henková, Svatava (advisor)
This thesis is focused on selected parts of building technological project apartment house Videnska in Brno concretly for lap C1 and C2. The project contained technical report, coordinating situation with distinguished trafic routes, object time plan and financial plan, study of main technological lap, technical report of building equipment and drawing of building equipment for differents lap, the design of mechanical arrangement of machine, the work schedule for construction, plan for securing material resources for monolithic ceiling, technological prescript and control trail plan for monolithic cailing, budget and design of lifting mechanisms
|
| |
|
Technological stage of the substructure of a residential building in Trutnov
Bonaventura, Pavel ; Bříza, Lukáš (referee) ; Kantová, Radka (advisor)
The bachelor's thesis aimed to prepare the stage of implementation of the rough lower construction of the apartment building which is located in Trutnov. The block of flats is based on a grade construction made of concrete strips footing and construction blocks of pernament formwork. Technological regulations have been created for the stage of realization of the rough lower construction, the equipment of the construction site have been suggested, appropriate machine set has been chosen, shipping relations for material and machine supplies have been considered, OHS (occupational safety and health), control and trial plan have been applied as well as a schedule and budget were created.
|
| |