National Repository of Grey Literature 8 records found  Search took 0.01 seconds. 
Realization of technological steps gross supreme office building
Havlík, Ondřej ; Kučírek, Jaroslav (referee) ; Kantová, Radka (advisor)
This Bachelor thesis describes the construction and technological processing of a fourth-floor building superstructure of the Plemenáři Brno building on Optátova 37, Brno. Discussing the building's detailed construction specifications built in stages with POROTHERM system and subsequently describing the technological application of the wooden roof trusses and large panelization of the sheet metal roofing. The full content of the Bachelor thesis includes the construction technological specification, construction equipment, planning involved to excavate the ground for technological stage brickwork, budgets, scheduling, the inspection plan and recommendations for compliance, and the roofing construction plan.
Static analysis of the collapse of the supporting wall of the castle Špilberk
Malý, David ; Gratza, Roman (referee) ; Kytýr, Jiří (advisor)
The study deals with already collapsed part of retaining wall at the Špilberk Castle. The goal is to analyze malfunction and collapse of the retaining wall and make a calculation according to the corresponding standards. Numerical patterns of the wall structure were solved by the ANSYS program systém.
Apartment building
Zakharov, Anatolii ; Kozubíková, Ivana (referee) ; Matějka, Libor (advisor)
This bachelor thesis processes project documentation for an apartment building with nearly zero energy consumption at the level for the realization of building. The foundation building located in Brno, in the city district of Řečkovice and Mokrá hora, has four above-ground floors and one underground floor. It is set in a slightly sloping plot on Tereza Novaková Street. In the vicinity of the future new building there is a development of family and apartment buildings. The main intention was to design comfortable, spacious and modern housing with low energy costs. Also an important goal was the use of empty land in the built-up area with the most efficient built-up. The layout of the apartments is suitable mainly for families with children. One apartment on the ground floor is designed as a barrier - free with regard to Immobile groups of residents. Access to the building is wheelchair accessible, the building has an elevator, the House meets the requirements for wheelchair use. In the basement of the building there are garage primarily for residents of the House. The elementary materials used for construction are brick and concrete, from which the supporting structures of the object are made. Roof of the building above 3rd floor it is designed as an operating and vegetation, roof space above 4rd floor it serves for technical maintenance of the House. The bachelor thesis is prepared in accordance with the current legislation of the Czech Republic as amended on the date of submission of the bachelor thesis.
Multifunctional building Malá Amerika
Jašková, Tereza ; Muroň, Ivo (referee) ; Ležatka, Lukáš (advisor)
This bachelor work follows up on an architectural atelier project made in the winter semester of the third year of the bachelor program. The goal of this project is a plan of a new multifunctional building in the city part of Brno-Střed. The site is located on the corner of Nové Sady, Nádražní and Hybešova. There are Malá Amerika and Titanium buildings nearby. The new building respects the urban concept, and the new structures match the height of the already present buildings. The multifunctional building consists of three aboveground parts each of which has its own public services. The corner building serves as a shopping mall with administrative offices. The building next to the Titanium is used for its showrooms and administrative part and the last and lowest building houses a café with a multifunctional space and a library. The whole site is conjoined by its underground parking lot which is accessible through entrances on the north-west and north-east sides. The shape of the building copies the intersection and creates an imaginary rampart, which also creates a square between the structures of Malá Amerika and the multifunctional building. The stalls of these structures are made from concrete arches reminiscent of a historical viaduct, which used to be situated here. The upper floors are covered with cladding made from bricks. The building worked on has an atrium which provides more daylight to otherwise very deep floor layouts. The main goal was to create a pleasant and habitable space in this part of the city.
Realization of technological steps gross supreme office building
Havlík, Ondřej ; Kučírek, Jaroslav (referee) ; Kantová, Radka (advisor)
This Bachelor thesis describes the construction and technological processing of a fourth-floor building superstructure of the Plemenáři Brno building on Optátova 37, Brno. Discussing the building's detailed construction specifications built in stages with POROTHERM system and subsequently describing the technological application of the wooden roof trusses and large panelization of the sheet metal roofing. The full content of the Bachelor thesis includes the construction technological specification, construction equipment, planning involved to excavate the ground for technological stage brickwork, budgets, scheduling, the inspection plan and recommendations for compliance, and the roofing construction plan.
Static analysis of the collapse of the supporting wall of the castle Špilberk
Malý, David ; Gratza, Roman (referee) ; Kytýr, Jiří (advisor)
The study deals with already collapsed part of retaining wall at the Špilberk Castle. The goal is to analyze malfunction and collapse of the retaining wall and make a calculation according to the corresponding standards. Numerical patterns of the wall structure were solved by the ANSYS program systém.
Cyclic loading of Adobe walls and its anti seismic strengthening reinforcement
Wünsche, Martin ; Hračov, Stanislav ; Pospíšil, Stanislav ; Urushadze, Shota
The damage of adobe masonry walls is one of the most widespread harming injuries and cause of loss of serviceability and seismic capacity for a building. The retrofitting approach is constrained by conservation requirements of minimum interventions which should not severely change the structural behavior and the structural appearance, and should prefer solutions without a necessity of total structural disassembling. This contribution an overview about the research that led to applications of the steel wire ropes and geo-nets onto adobe brick walls provides
Cyclic loading of masonry walls and its anti seismic reinforcing
Wünsche, Martin ; Hračov, Stanislav ; Pospíšil, Stanislav ; Urushadze, Shota
The damage of structural masonry walls is one of the most widespread harming injuries and cause of loss of serviceability and seismic capacity for a building. Therefore a research into possibilities which would improve these characteristics have been carried out within the 7th EC Framework programme project NIKER. The retrofitting approach is constrained by conservation requirements of minimum interventions which should not severely change the structural behavior and the structural appearance, and should prefer solutions without a necessity of total structural disassembling. This artikle provides an overview about the research that led to applications of the steel wire ropes and geo-nets ontoadobe brick walls.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.