National Repository of Grey Literature 181 records found  beginprevious31 - 40nextend  jump to record: Search took 0.00 seconds. 
Determined and Specification of Auxiliary Work in Construction Supplies and Work
Levstek (Bradáčová), Šárka ; Kosová, Jaroslava (referee) ; Šmahel, Milan (advisor)
The thesis deals with extra work and unrealized work that originate at construction projects and further on during realizing the construction, both at new constructions, and at reconstructions and other construction activities. It mainly focuses on their origination and optimizing their amount in individual construction phases, from preparing the project through entering into an agreement with the supplier, to carrying out the project itself. The theoretical part outlines used basic concepts according to valid laws and regulations, and introduces individual construction phases including defining extra work and unrealized work. The practical part shows a real-world example of the negative influence of such work on the investor-supplier relationships and the analysis of failures by individual participants. The result of the thesis is processing a suggestion for reducing the frequent failures caused by the extra work and unrealized work, and a consistent evidence for better argumentation and invoicing between the investor and the supplier. The main aim is to prevent conflicts between the parties that arise because of admitting the extra work and unrealized work.
Upper structure construction technology phase for lesure time building
Kočí, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is to solve selected parts of the building-technological study of the gross top-structure for the object of the Centre for leisure-time activities in Jihlava. The bachelor's thesis is a technical report of a solved object, a technological study of the implementation of the main technological stages for the given building, a timetable for the construction of the technological stages of the rough construction, the basic concept of the construction site, the situation of the building site equipment, the technical report of the building site, Dimensions of gross overhead construction, technological regulation after masonry and prefabricated ceiling construction, occupational safety and health protection, design of machine assemblies. A control test plan for masonry and prefabricated ceiling constructions.
Implementation of the roofing phase of a residential building in Nové Sady
Balko, Dávid ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The bachelor thesis deals with realization of a roofing construction of a apartment block in Nové Sady. This thesis deals with the version of a warm flat roof. For the given version is handled the consideration of transportation itinerary, itemized budget with bill of quantities, technological prescription, technological documentation of building site equipment, time schedule, machine assembly, control and test plan, safety and health precautions, the cost comparison of flat roof area, drawing of flat roof.
Production hall MONTGAS - realization of the gross substructure
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the gross substructure of the new production hall of the company MONTGAS a.s. in Hodonín on the street U Kyjovky. Part of this technological phase is the realization of earthworks, driven gravel FRANKI piles, driven reinforced concrete FRANKI piles, cast-in-place reinforced concrete foundation pads, sills and strip foundations, soil slab, base layers and reinforced concrete floors of the building including steel fibre reinforced concrete slab and cast-in-place reinforced concrete structure of the paint shop inside the production hall. It also includes damp proof layer and insulation of foundation structures. The content of this work is the technology of earthworks and all piles in the form of technological regulation. Construction costs are calculated in an itemized budget from student version of the BUILDpowerS software with a bill of quantities. The schedule is drawn up in the form of a schedule from student version of the CONTEC software. Plans are in place to ensure both quality and safety during construction.
Construction Technology study of building a house of the eko panels
Habarta, Tomáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is the description of the construction and technological study of building a family house from Ekopanel. It is an ecological diffusion free material in the form of panels, which are pressed at high temperature and pressure. Part of this technology study is time and financial plan of construction, basic concept of building operation, bill of quantities specified objects, technological regulation for the implementation anhydrite monolithic floors, precautionary measures of the construction site, listing of machinery and tools which are used, inspection and test plan and comparison of wooden buildings with brick building.
Analysis of errors in construction budgets
Kadaníková, Nela ; Tuscher, Martin (referee) ; Biolek, Vojtěch (advisor)
The master’s thesis describes the problematics of construction budget errors. Based on the research and the survey among investors, designers and contractors, methodology changes are designed for a specific company in order to decrease its impact on stakeholders’ expenses, construction time and quality of the building.
Implementation of lower structure multipurpose building
Helán, Tomáš ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
Purpose of this bachelor's thesis is to compile structuraly - technological project of the field experimental station conctructed by Mendel university in Brno. Thesis concentrates on technological phase of foundations, which involves prescriptions for executing ground works, setting up a building and isolation against soil humidity. Prescriptions are complementet with suggestion of constellation of machines, time plan, rules of workplace safety, control and quality plan and solution for organisation of construction. Conclusion of this bachelor’s thesis is financial comparation of two different structuraly – technological solutions of the object. That would be using monolitical foundational lines and systematical shuttering or using lines made of adapting pieces of secret shuttering.
Technological study of prefabricated hall construction in Boskovice
Navrátil, Martin ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The work addresses realization of technological stage load-bearing construction of the mounted hall in Boskovice. Technological phase includes the instalation of steel construction and montage panels walls and roofs of hall. The work contains also a construction site.
Technological Solutions of GUVEX Company’s Cladding Annexe in Lanškroun
Strnadová, Lenka ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
This bachelor thesis deals with the technological solution of cladding annex of an administrative nature and warehouse space. This is specifically about using lightweight cladding. The paper includes technological regulation, schedule, bill of quantities, budget, organization of construction principles and ensuring the quality requirements.
Realization of coarse superstructure of villahouse Slivenecká in Prague
Petřík, Michael ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
This thesisseals with realization of coarse superstructure of villahouse Slivenecká in Prague. technological phase solving realization walling and monolitic phase vertical and horizontal construction.Work includes technical report, site equipment,statement of estimate, technological regulation, site facilities, scheduling, machinery proposal, controlling and testing plan, safety, blueprint floors.

National Repository of Grey Literature : 181 records found   beginprevious31 - 40nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.