National Repository of Grey Literature 111 records found  beginprevious31 - 40nextend  jump to record: Search took 0.01 seconds. 
Production of aquariums Brno Pavlica
Chrobák, Milan ; Kotek, arch Jakub (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
This bachelors final project is based on an atelier project of the sixth semester of the bachelors study program of architecture of civil engineering. This project is based on the original design. The task was to design an object suitable for production and show of large-sized interior aquarias made by company PAVLICA Akvária, originaly located in Uherský Ostroh, and its administration. The plot, where the object has to be located, is labeled as brownfield no. 0811. This area is situated in Horní Heršpice, Brno. Designed object respects the surrounding terrain and copies it with its staging volume. The building is reflecting personal and profesional approach of the company to every contract. The building is two-storey. On its ground floor, there is situated showroom for presetation of company and for event happenings. On the second floor, there is administration offices, staff facilities, support areas, production itself including stock.
Construction-technological project of production hall with extension in Polička
Holubář, Zdeněk ; Průcha, Aleš (referee) ; Vlčková, Jitka Laura (advisor)
This diploma thesis is dealing with a construction-technological project of a production hall in Polička. The main subject of the thesis is a technological report, a realization study of the main technological phases, a coordination situation of the construction with broader relations to transport routes, a project of the office building site equipment, a suggested list of the main construction vehicles, a time plan for the main building object, technological prescriptions for a prefabricated skeleton and bored piles and documents related to this.
PROKES WINERY
Tallmayer, Dominik ; Myslín,, Jiří (referee) ; Dýr, Petr (advisor) ; Čupr, Karel (advisor)
This Bachelor thesis is based on formerly elaborated study in the subject AG32, which has been further elaborated to the level of documentation for a building permit and documentation for a construction execution. The topic of the thesis was to design a production hall, accommodation, administration, wine sales and a detached house. The new Prokeš winery is to be situated in the town of Velké Němčice, north-west from the centre of town in Městečko street. The parcel of land is bounded from the south by a road, from the north by a field, from the east it is adjacent to a field path and from the west to old garages. The land is owned by Mr Kamil Prokeš, it is an irregular shape with an area of 2,536.06 m. More than 1/3 of the land is crossed by the VN 22 kV air line. Functional content of the construction is a wine production, guests accommodation, administration, wine sales and housing for the winery owners. The main idea of the design was to build a construction, which would meet all the operation requirements as well as the owner requirements. The winery consists of 3 objects that are mutually connected into one unit, however, the individual plants are not disturbed by the others in terms of sound, vibrations, movements of winery workers and visitors. The winery is situated perpendicularly to Městečko street. This road is used as an access and supply road. The objects are designed in a way which accommodates the operation and function.
Production of branded clothing in Brno
Pavlas, Antonín ; Obrtlík,, Jan (referee) ; Májek, Jan (advisor) ; Utíkalová, Ivana (advisor)
The bachelor’s thesis aimed to create the necessary levels of project documentation – Documentation for building permission and Documentation for construction. The content of the project is a new construction of the production of branded clothing in Brno by the company Glami, which will serve primarily as the production and export of finished pieces ready for sale. The building is located in Brno-Bohunice district between Kamenice, Kejbaly and Vinohrady streets and the plat is listed as one of the Brno brownfields under number 0101. The solution should také into account changes to the Urban Plan of the City of Brno in 2021 and the surrounding buildings. One of the first goals was for the construction to complement and complete the surrounding road structure. The basic masses were situated so as to respect the road lines and thus match the surrounding roads. The building is divided into three masses separated by their functions, but interconnected for easy operation. The aim was to create a functioning building with optically separated but interconnected operations.
Construction Technology implementation of stage floor in the production hall
Hrabovský, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the production hall. The building is single-staged production hall in one part connected to current object. Technological regulation solves the implementation of waterproof isolation, concrete bearing place and wire reinforced concrete. The bachelor thesis includes technical report, situation of construction in wide relations with road infrastructure, technological regulation, technical report for constructional equipment, time schedule, control and test plan, protection of health and safety, comparison variants of industrial floors, itemized budget and constructional equipment for technological implementation of stage industrial floor.
Construction technology project of production hall in Uherske Hradiste
Radmil, Aleš ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is the solution of selected components of construction-technology project construction of the II. stage production hall of the company Schlote Automotive Czech Ltd. This work includes financial, temporal, technical and technological aspects of the construction process. For selected component is created technologic direction and inspection plan.
Woman´s Clothing Factory
Kovářová, Hana ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The women´s clothing factory is situated in the city part Brno-Židenice in the area of one so called „brownfields“. Currently there are rusty storages and old garages standing in the building ground. The site is bordered by several streets – it is Rokytova street, Komprdova street and Údolíček street – and the fourth side is closed by boundaries of a cemetery. The area can be entered from the north-west street Údolíček. According to the ground plan, its location is temporary, so we changed it a little to better match the needs of the company. The entrance for pedestrians is situated at the north-west too. And there are also parking places and other necessary manipulation space situated on the grounds. The clothing factory is aimed at production of Giorgio Armani´s women confection so the architectural solution is based on the basic philosophy of the company. Their models are famous for their simple design with a patterned fabric that make them special. So the basic mass of the object is a simple block, which is sensitively placed at the surrounding landscape and which is made special by the parts of ovals that are embedded or comming out of the basic mass. These parts of ovals create both – resting and functional spaces. The strong horizontal character is broken by a cylindrical body stucked into the basic shape that surmounts the block by one floor. A big part of the production hall is glassed-in so we can get enough light into the interier and the employees can be in touch with the surrounding. There is a facade net strunged in front of the glass facade. The net limits overheating and also plays the role of the unifying element. The building integrates a producion hall, storages, sanitary rooms, administrative space, canteen with affilated spaces and energy traffic necessary for running the factory. The wing cell is a steel skeleton combined with reinforced concrete circumferential wall and tie brick walls.
Steel- load-carrying structure of production hall
Kábrt, Michal ; Melcher, Jindřich (referee) ; Karmazínová, Marcela (advisor)
The aim of the bachelor thesis was to make a structural design of steel-load-carrying structure of two-bay production hall with rectangular plan with total width 36m, i.e. with the same width both of the bay 2x18m, and total length ca. 72m. Eaves level of the building is 7,5m. There is one trolley crane with load capacity 5t and span 17,1m in the hall. The building will be roofed by saddle roof with slope 5% (2.86°) and ridge in the middle of the width. Modular distance of main frames is 6m. The production hall is situated on the outskirts of industrial part of town Červený Kostelec. RFEM was used for calculation internal forces on individual structural elements. Designing of elements and joints was made according to valid eurocodes.
Office building with production hall
Břečka, Jan ; Balázs, Ivan (referee) ; Horáček, Martin (advisor)
The aim of this diploma´s thesis is to design steel-concrete structure of the office building and steel structure of production hall situated in Moravské Budějovice. The dimensions of the office building are 48,0 x 60,0 meters and height is 17,0 meters. The main constructional material is S 255 steel and C30/37 concrete. The load bearing structure of the hall consists of the columns, primary and secondary beams. The axial distance of columns is 6 meters (5 meters). The dimensions of the production hall are 24,0 x 60,0 meters and height is 12,0 meters. Inside the production hall is craneway. An analysis of two solutions of the supporting structure was performed. The first variant is consists of rigid frames. Truss girder in the second variant is an alternative solution. Both variants were compared and the amount of steel was found. The selected option was developed in greater details with static calculation, drawings and material report. The static analysis of the main load bearing parts of the structure is processed. The calcuation were made in accordance with the European design codes.
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.

National Repository of Grey Literature : 111 records found   beginprevious31 - 40nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.