National Repository of Grey Literature 98 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Design of the RC slabs of the flat house
Reinoha, David ; Požár, Michal (referee) ; Klusáček, Ladislav (advisor)
The topic of the bachelor thesis is a new two-storey production building with an administrative part on the second floor and a production space on the ground floor The bachelor thesis deals with the static assessment of selected main bearing elements of the whole building in details for building permit. The main vertical supporting structure here is peripheral ceramic masonry, which is bounded by iron-concrete wreaths at the level of each of the two floors. The building is roofed with wooden nailed roof trusses placed on an in to wall-anchored wooden beam. The main supporting horizontal structure forming the ceiling between the first and second above-ground floors is made up of prefabricated Spiroll ceiling panels, which are placed on the stiffening wreath 1NP. The foundation structures are made of a monolithic concrete waist and consequently of a prefabricated lost formwork.
Implementation of the Subtructure of an Apartment Building
Teplý, Tomáš ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The subject of this bachelor's thesis is the constructional-technological solution of the substructure of an apartment building in Zlin. It is an object with five floors and a basement with garages. The building is based on drilled piles. The bachelor's thesis includes a construction plan with a site equipment, technological procedure of earthworks and drilled piles. A set of machines, a quality control, a budget and a time schedule have been processed for this technological phase. During the building process it is cared about work safety and environment protection.
Technological stage of the substructure of an apartment building in Zlín
Žůrková, Dominika ; Řihák, Pavel (referee) ; Kantová, Radka (advisor)
The subject of my bachelor's thesis is the solution of the technological stage of the substructure of an apartment building in Zlín. The building has four floors above ground and one underground floor. The house is based on a foundation slab, which is connected to the perimeter walls, these structures form a white tank system. The thesis includes a technical report, the construction situation with broader relations to transport routes, bill of quantities, technological regulations for earthworks and foundations, design of mechanical assembly, time schedule, machine system design, inspection and test plan, occupational health and safety, white tank system solution, schemes for excavation work and concreting.
Realization of rough substructure of multifunctional building in Přerov
Minarovič, Kamil ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
In this bachelor's work is the goal of the realization of lower gross construction of polyfunctional house in Přerov. The content of this bachelor thesis is the solution of the summary of the technical report, technological regulation for excavations and foundation construction, site facilities, transport wider relationships, design of mechanical assembly, inspection and test plans for excavations, monolithic foundations and piles further also itemized budget for a rough lower construction and time schedule. The substrate was drawing documentation for the implementation of this construction.
Residential house Brno - Žabovřesky, construction-technological solution of rough substructure
Kvíčalová, Monika ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The aim of this thesis is the construction and technological solution of rough substructure new building of residential house Brno – Žabovřesky. Part of the thesis is technical report of building, technological regulations of selected works, inspection and test plans, catalog of construction machinery, technical report of building equipment, shedule of health and safety, environmetal prostection, transport links, line schedule, budget and drawing of excavation work.
Implementation of the gross substructure building residential house in Jicin
Habartová, Lucie ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The content of the bachelors thesis is the construction technological project of the residential house in Jicin. The bachelors thesis includes technological regulation for earthworks and substructure. Technological regulations are supplemented by draft of the suitable machinery, inspectional and trial plans, equipment of construction site, time schedule and work safety.
Solution of construction-technological phase of lower stucture of the aparement building in Brno
Prokop, Petr ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The subject of this bachelor thesis is the solution of the technological stage of the rough substructure of an apartment building in Brno. As part of this work, the construction site plan with composition of site equipment was designed as well as technical report of the construction site, technological regulation for groundwork and deep foundation, technological regulation for construction of foundation, machine assembly design, wider traffic routes plan, quality control and testing plan of groundwork, budget.
Technological stage coarse substructure "Vinařství"
Staněk, Martin ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
The subject of this bachelor thesis is technological stage of gross substructure of winery. Part of this work is a technical report of building equipment, technological instruction for selected works, the draft of the mechanical assembly, inspection and test plans, schedule of health and safety, bill of quantities, itemized budget, the situation of the building site and the schedule.
Petrol station at D5, technological phase substructure
Čeňková, Lydie ; Krejčí, Vlastimil (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the construction of buildings lower highway service areas, primarily pumping station and its accessories. Basis of the work are technological regulations for the implementation earthworks, installation of underground steel tanks fuel, the work of the foundation and system design site. The work also includes an itemized budget, time schedule, schedule, safety and quality inspection work performed and draft mechanical assembly for the stage.
The large family home-working stage lower and upper rough construction
Rozehnalová, Andrea ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
In this thesis is dealt with structurally lower technological phase and superstructure construction of a large family house in Brumov - Bylnice. The work is divided into multiple stages. In the first stage we classify excavationof the foundation pit and foundation trenches. Other stages deal with the casting of reinforced concrete strips and plates, pools walls, one on the 1st floor masonry bearing walls and concreting theceiling. The construction of these parts are processed technological procedures, inspection and test plans, their time complexity, design of appropriate mechanical assemblies and also is taken into account healthand safety in the workplace.

National Repository of Grey Literature : 98 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.