National Repository of Grey Literature 5 records found  Search took 0.01 seconds. 
Music Club Brno
Muzikář, Vladimír ; Fišer, Jiří (referee) ; Odvárka, Antonín (advisor) ; Štěpánek, Ladislav (advisor)
Based studio study AG35 is processed by the thesis that the study elaborates in grades documentation for building permits and documentation for the execution of the project. The central theme is Music Club in Brno, for which it was entered plot near the Grain Market Square slope below Špilberk. Near the plot is solved square Obilný trh, park Špilberk, Brno University Hospital and building Ombudsman. The land is sloping, which significantly influenced the design. My main idea was to create a project that would include both a monumental building that will meet and represent the function and at the same time that they are in the best compliance with the terrain of the land. Create a public space where people will resort to relax, or walk to the park we were commonplace. Roofs are walkable, offering views of the surrounding area, larger building houses a cafe and music club itself, in a small building with a test, a recording studio and a ballroom. Both buildings are connected to the underground parking. The very architecture of the buildings plays with the principles of the libre and minimalist style.
Music Club Brno
Pappová, Martina ; Fišer, Jiří (referee) ; Odvárka, Antonín (advisor) ; Matějka, Libor (advisor)
The bachelor thesis expands the architectural project created in the framework of the subject AG35 in the spring semester on a level of a Building permit documentation and a Documentation for execution of the project. The theme of the task is a new building of a concert hall with the defined land on the Údolní street in Brno, in front of the park Obilní trh. Surrounding historical buildings from the 19th century strictly follows the street line. But that line was broken at the defined land by the impact of a bomb in World War II. On a neighbouring plot, the created space was filled by a building of regional ombudsman, which doesn’t follow the street line anymore. So its continuing isn’t required on the defined land neither. Sloping terrain influenced whole concept, which consist in implanting the building into terrain, so that followed surrounding terrain and connect park Obilní trh with park Špilberk through walk-on roof surface with vegetation and a newly build park in front of the concert hall. The building is divided into two parts from exterior. The first one is a polygon and it is mostly under terrain. A small surface of façade above a terrain is largely created by glass curtain wall supplemented by white stucco. Here is located a main entrance and a foyer, a main concert hall, a café, rehearsal rooms, an exercise studio, an atelier, changing rooms and technical facilities of whole building. While the second rectangular part, in which is situated small concert hall on the second floor, is as if levitating block overlapping over a volume of the first floor and it is garnished by structural panels from glass fiber reinforced concrete. The cladding goes to the ground in the southeast corner of the block and there are panels with inscription “hudební klub” or specific name of the concert hall instead of the structural panels.
Gap options (třída Kapitána Jaroše, Brno, CZ)
Koudelka, Tomáš ; Křivánek, Martin (referee) ; Ponešová, Barbora (advisor)
The subject of my work was to investigate the possibilities of filling the gap on Kapitána Jaroše Avenue, which has been undeveloped for a long time, mainly because of the number of networks that lead through it to the courtyard. At the same time, the gap is in the state of a temporary parking lot for the Municipal Theatre, and despite the fact that it is not at all pedestrian-friendly, a considerable number of people pass through it, either to the theatre or between Lidická Street and Kapitána Jaroše Avenue. With my proposal I am trying to place the building in the gap in such a way that there is as little need as possible to relocate the networks. At the same time, I am trying to preserve the maximum permeability of the gap for pedestrians and to create a space suitable for passing and spending time. By locating the rehearsal spaces, I am responding to the concentration of art and music in the area and the lack of rehearsal space in the surrounding institutions (Brno Conservatory and Jaroslav Kvapil Primary School of Art)
Music Club Brno
Muzikář, Vladimír ; Fišer, Jiří (referee) ; Odvárka, Antonín (advisor) ; Štěpánek, Ladislav (advisor)
Based studio study AG35 is processed by the thesis that the study elaborates in grades documentation for building permits and documentation for the execution of the project. The central theme is Music Club in Brno, for which it was entered plot near the Grain Market Square slope below Špilberk. Near the plot is solved square Obilný trh, park Špilberk, Brno University Hospital and building Ombudsman. The land is sloping, which significantly influenced the design. My main idea was to create a project that would include both a monumental building that will meet and represent the function and at the same time that they are in the best compliance with the terrain of the land. Create a public space where people will resort to relax, or walk to the park we were commonplace. Roofs are walkable, offering views of the surrounding area, larger building houses a cafe and music club itself, in a small building with a test, a recording studio and a ballroom. Both buildings are connected to the underground parking. The very architecture of the buildings plays with the principles of the libre and minimalist style.
Music Club Brno
Pappová, Martina ; Fišer, Jiří (referee) ; Odvárka, Antonín (advisor) ; Matějka, Libor (advisor)
The bachelor thesis expands the architectural project created in the framework of the subject AG35 in the spring semester on a level of a Building permit documentation and a Documentation for execution of the project. The theme of the task is a new building of a concert hall with the defined land on the Údolní street in Brno, in front of the park Obilní trh. Surrounding historical buildings from the 19th century strictly follows the street line. But that line was broken at the defined land by the impact of a bomb in World War II. On a neighbouring plot, the created space was filled by a building of regional ombudsman, which doesn’t follow the street line anymore. So its continuing isn’t required on the defined land neither. Sloping terrain influenced whole concept, which consist in implanting the building into terrain, so that followed surrounding terrain and connect park Obilní trh with park Špilberk through walk-on roof surface with vegetation and a newly build park in front of the concert hall. The building is divided into two parts from exterior. The first one is a polygon and it is mostly under terrain. A small surface of façade above a terrain is largely created by glass curtain wall supplemented by white stucco. Here is located a main entrance and a foyer, a main concert hall, a café, rehearsal rooms, an exercise studio, an atelier, changing rooms and technical facilities of whole building. While the second rectangular part, in which is situated small concert hall on the second floor, is as if levitating block overlapping over a volume of the first floor and it is garnished by structural panels from glass fiber reinforced concrete. The cladding goes to the ground in the southeast corner of the block and there are panels with inscription “hudební klub” or specific name of the concert hall instead of the structural panels.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.