Construction technological project of objects harvest lines
Bahulíková, Pavla ; Horňák, Michal (referee) ; Vlčková, Jitka Laura (advisor)
The topic of this thesis is a collection of objects of the postharvest line in the village Horní Moštěnice by the town Přerov. The thesis resolves the time schedule along with the financial plan. In the drawing of the constructional plant is being solved the establishment of the whole construction. Further is it the technical report, site engineering study and a noise study. The thesis is focused on the storage bins, for which is being developed a detailed time schedule, a budget, a drawing of the machine configuration, a technological standard for the assembly of the storage bins, the principles for the construction management, technical management of the constructional plant, control and test plan, safety and health at work protection and the construction site noise.
Construction technology study of the construction of the bearing structure of manufacturing plant in Jihlava
Pokorný, Jan ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
Company engaged in modernization of locomotive vehicles progressively modernizing their industrial estate. A big investment become realization of new industrial hall for vehicle coating, simultaneously with a reconstruction of neighbouring production hall and a new connection to the water main, gas main and a new transformer station. The bachelor thesis includes technological regulations of bored piles and for assembly upper prefabricated reinforced concrete construction of coating hall. Technological regulations are supplemented by draft of the suitable machinery, equipment of construction site and inspectional and trial plans, work safety, time schedule and comparison of two variants of the cranes and all will be feasible in terms of construction rate and financing.
Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory
Štěpánek, Michal ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Implementation of Registred Office of Company POLNA corp. s.r.o. in Třinec
Špilínek, Richard ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
This master´s thesis deals with construction-technological project of administrative-production and storage complex in Třinec - Oldřichovice. It´s a new building of the main building, consisting of a two-storey administrative building and a one-storey storage hall, which is complemented by other sub-objects. The master´s thesis solves the realization of the building as a complex whole and in more detail focuses on vertical and horizontal supporting structures, made of steel elements and steel-concrete ceiling structure. An integral part of the project include studies of the realization of the main technological stages of the main building, technological regulations, complemented by assembly schemes, solution of transport routes and proposal of machine assemblies, site equipment design, time schedules, budgets, inspection and test plans and proposal of security measures for selected risks. The work is further supplemented by a specialized area that prepares the design and execution of intra-areal reinforced communications.
Residential house Ševětín - technological phase coarse upper construction
Marek, Miroslav ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This bachelor´s thesis is focused on building technology upper stage of construction site of a residential building in Ševětín. It deals with technical Reports, technological methods of construction, the report also contains technical Reporst of building equipment, schedule, design of mechanical assembly, inspection and test plan, safety, and finally comparing different ways of walling.
Implementation rough upper construction pension in Celadna
Mikulka, Lukáš ; Kovářová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
This bachelor’s thesis is focused on building technology of the upper part of rough construcion of the pension in Čeladná. Thesis includes technological regulations for walling of the supporting structures and floor structures. Technological regulations are supplemented by design of the mechanical assembly, equipment of construction site, technical report, inspection and test plans, time schedule, work safety and itemized budget.
Preparation of realization apartment building in Dvůr Králové nad Labem
Možíš, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
Architectural and technological project Residence Na Plachtě
Kvapil, Michal ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
Writing of this master thesis was stimulated by my participation on compulsory practice and the level of its interest. The master thesis includes the description and technical documentation for the construction of the reinforced concrete building foundations. The aim of this thesis is to solve the method and potential problems of the concreting. As for the concreting machinery, I suggested to use the machines (mixer truck and mobile concrete pump) from the nearby concrete plant to reduce the total transportation costs. I’ve made an analysis of machine renting fees and price of fresh concrete between local distributors. The main contribution of the master thesis is acquaintance with the construction of the apartment building and with a practical side of preparations before the construction begins.
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.