National Repository of Grey Literature 23 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Extension and construction modifications of the F2 production hall in Hodonice - construction technology project
Laga, Radim ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the development of a complex construction technology project for the realization of three additions to the existing production hall. The work aims at the optimal choice of intertwining the temporal, spatial and technological structure of the construction process in such a way that the work is completed on time, at a pre-agreed price and in the required quality.
New construction of block of apartments A1, at Slavkov u Brna - Preparation of the realization construction
Stuchlík, Jaroslav ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This Thesis deals with the organization of realization of the residential building A1 Slavkov u Brna. Thesis solves mainly technological process of realization of the main object. The thesis aims to develop a time schedule of execution, usage of mechanisms timetable, material resources, technological regulations, inspection and test plans. The annex also solved graphically construction site facility set up and its modifications during execution depending on different type of works. This Thesis is based on realization project provided by the realization company and with consent of project designer.
Administrative center Hodonin - building and technological project
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
Selected parts of the Construction-technology Project for construction of Administration and Flat Buildings complex Sochorova
Dvořák, Marian ; Navrátil, Karel (referee) ; Motyčka, Vít (advisor)
Masters thesis is engaged of chosen parts of technological-buildig project of administrativ and housing complex of Sochorova in Brno, Žabovřesky. Contains technological-buildig study of first phase with brief description of advancement of construction with grafical scripts of particular steps, timetable and pecuniarytable of objects AB3, AB4, diagrams with various possibilities of using operatives. Thesis continous with calculation of entire first phase and item budged of object AB3(draft construction), statement of masurement, technical report of construction-technological AB3, plan of situaction of the building, technological manual of reiforced concrete ceiling of AB3 including plan of planking parts PERI, timetable, design of construction site equipment with technical report, proposal of machineries and crane, plane of inspections for chosen items, ecology and report about safety and health protecting on construction site.
Preparation realization multipurpose building Brno - Klíčova
Sviták, Roman ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
Apartment buildings in Pardubice - Project planning and management
Skřivánek, Jan ; Sedlák,, Petr (referee) ; Motyčka, Vít (advisor)
The final thesis contains selected parts of construction technological project, this project are defined by a apartment building complex in Pardubice, Dubinská. This thesis deals with first two buildings with four flours and a basement. Coordination site plan, time and financial schedule including machinery setting, a study of main technological phases, construction site facility project, main technological machinery design, technological standard and time schedule, technological regulation for basement monolithic constructions, inspection and trial schedule with drawing of facing to it are regarded as parts of construction technological project.
1. Reconstruction of the vocational school Dubňany. Construction Technology Preparation
Dohnálek, Marek ; Hrůza,, Jaroslav (referee) ; Kovářová, Barbora (advisor)
The subject of this technological preparation of construction is to find out scope of work needed for reconstruction of former miners school in Dubňany.In Czech Republic exits plenty of these abandoned places and this master thesis should serve as an example of reconstruction of some theirs parts.Within this project I would like to valorize the experience gained from excursion to foreign countries, where the passive and low-energetic buildings are common.Missing project documentation of some part of this facility was replaced by 3D modelling based on my own laser measurement.The main object SO 01 has been already rebuilt into passive apartment building but without building-technological study and proper project documentation.Due to missing foundations and confidential internal documentation of the construction company is impossible to compare the real material, human and financial resources with those mentioned within this thesis. The master thesis contains technical report for the building-technological project, coordination of the transport routes, chronological and financial plan, realisation of the main technological steps, equipment of the construction project , draft of machinery, time schedule of the main project, plan of getting the needful resources, technological regulations, control and probationary plans, disposal of asbestos reports, owning contract, two roof decks comparison from the point of view of thermal technology and specialization from the building field.
Design center HANÁK NÁBYTEK a.s., Popůvky u Kojetína - project planning and management of construction
Izsová, Radka ; Liška, Pavel (referee) ; Šlanhof, Jiří (advisor)
This thesis addresses the Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - This is a new object had the basement and a second floor. The thesis includes - Technical report on the construction technology of the project , which are described in each chapter building equipment, coordination of building relationships with the wider transport routes , the study of the main technological stages, the design of the main building machines and mechanisms. There is a solution on time and financial plan object , the schedule object SO03 - Rapid technological and construction timetable and plan for securing material resources SO03 object . This thesis addresses the technological specification for excavation work with the control and test plan then is solved problems of chemical anchoring pillars object SO203 , which are included tensile tests on chemical anchors.
Building and technological project of a residential house in Brno
Podškubka, Martin ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this Diploma thesis is building and technological project of a residential house in Brno, which contain the implementation of the underground car park and residential building, which has three above-ground floors. Attention is focused mainly on the technological processes of bottom building. Text section contains the technical report on the structural and technological project, study implementation of major technological stages of building, technical report of construction site equipment, technological regulations, inspection and test plan, study of noise, plan health and safety at work, the design of the main building machines and mechanisms including transport routes. The attachment section contain time and financial plan construction-object, time deployment of machines, plan of material resources, time schedule, technology standard, budget, drawings of construction site equipment, verification of tower crane construction and schema of processes concreting.
Construction technology project for a hotel in Giant Mountains
Pozler, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.

National Repository of Grey Literature : 23 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.