|
Inclined belt conveyor
Hájek, Ondřej ; Špička, Jiří (referee) ; Malášek, Jiří (advisor)
The purpose of this bachelor´s thesis is design constuction of conveyor for transporting corn in distance of dune 26 meters and diference of height 6 meters. Scope of this work is functional compatation, main size, design of the drive and tension facilities of conveyor. Work include among others evaluation possibillities slant and design of change construction of conveyor. Components of work is strength check of the driving shaft. Attainment of this work is real posibility construction of conveyor, by task.
|
| |
|
Formula SAE Drivetrain
Tovaryš, Miroslav ; Beran, Martin (referee) ; Blaťák, Ondřej (advisor)
The diploma thesis deals with the design process of Formula SAE drivetrain. Different design possibilities were described and after that were the suitable designs chosen to be used in the team car. Then were the design parameters determined. The design of the differential gear mounting was created and it’s stress analysis was done.
|
| |
| |
|
Formula SAE Drivetrain
Tovaryš, Miroslav ; Beran, Martin (referee) ; Blaťák, Ondřej (advisor)
The diploma thesis deals with the design process of Formula SAE drivetrain. Different design possibilities were described and after that were the suitable designs chosen to be used in the team car. Then were the design parameters determined. The design of the differential gear mounting was created and it’s stress analysis was done.
|
| |
|
Inclined belt conveyor
Hájek, Ondřej ; Špička, Jiří (referee) ; Malášek, Jiří (advisor)
The purpose of this bachelor´s thesis is design constuction of conveyor for transporting corn in distance of dune 26 meters and diference of height 6 meters. Scope of this work is functional compatation, main size, design of the drive and tension facilities of conveyor. Work include among others evaluation possibillities slant and design of change construction of conveyor. Components of work is strength check of the driving shaft. Attainment of this work is real posibility construction of conveyor, by task.
|