National Repository of Grey Literature 20 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Fly ash of class C for ceramic technology
Keršnerová, Lucie ; Šveda,, Mikuláš (referee) ; Rovnaníková, Pavla (referee) ; Všianský,, Dalibor (referee) ; Sokolář, Radomír (advisor)
This thesis is focused on the possibilities of the utilization of the fludized fly ash in ceramic technology, especially in the field of brick manufacturing and ceramic tiles. There were used fly ashes from thermal power plants in Hodonín, Ledvice and Tisová. Fluidized fly ash can be used for manufacturing of building materials. There hasn’t been done extensive research in this area. One of the problem is sulphur dioxide leakage during burning. The work describes the behaviour of fluidized ash during firing. The attention is focused on air pollution of sulphur dioxide. The production of SO2 is controlled so that the aim of the work is to find a way how to avoid leaking. It was proved that addition of sodium ions causes the formation of minerals hauyne and nosean during firing. Also is described the behaviour of the fly ash-soil mixtures. The anhydrite decomposition temperature is lower than in pure fly ash. In the end is fluidized ash applied for the production of dry pressed ceramic tiles. This ash can be used in ceramic technology. However, despite the interesting results there are number of problems that need to be solved.
Nursing home - finishing job
Lysáková, Vanda ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the bachelor thesis is the processing technological phase of the finishing works in the house with nursing service. In the parking area are copared three variants of floor composition. Three variants of floor composition are assessed in thermis of financial, security, execution speed and service.
Confectionery workshop in Trutnov. Solution phase of technological internal finishing processes
Dolejška, Lukáš ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The bachelor thesis deals with the preparation and organization of technological stages interior and finishing processes in the confectionery workshop in Trutnov. The basis of this work is the budget of technological phase and timetable. It focuses its attention on the technological regulations dealing with masonry inner partitions, plaster and ceramic tiles. This part is followed by the design of building machinery, proposal building site, quality control work, and safety of work and minimization of environmental impact.
Project planning and management of construction residential houses in the file Štětí
Sládek, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
The subject of this thesis is the preparation and organization of construction of residential buildings in Štětí. In the technological regulations deal with all the layers of flooring from the ceiling construction in residential buildings. The objects are hard floors. For floor coverings will be used PVC roofing, ceramic tiles and concrete coating. It will be used for machining of concrete. Next, I will discuss technological instruction, timing, valuation of all technological stages, construction site equipment, health and safety at work. Also here describe the proper allocation of construction processes into sub-processes to technological stage of completion of work most effectively achieve the objective.
Construction technology study of the implementation phase of floors in senior home
Hesková, Veronika ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
This theses deals with the structural engineering study of the floor building in the retirement house in Luhačovice. The work includes a technical report, a building situa-tion with boarder relations of transport routes, a bill of quantities, a technological regulation for the wear layer, a sources balance, a solution of the production organi-zation, a time schedule, a machinery assembly proposal, a qualitative requirements and its finding, safety at work, a budget for the technological part and a new proposal for the floor construction on the balcony.
Construction of the hall with the administration, Velká Bíteš - solution of the stage floors
Kladivo, Jiří ; Mohapl, Martin (referee) ; Novotný, Michal (advisor)
For my bachelor thesis I´ve chosen a topic concerning the stages of floors in a building which is composed of two parts. The first part is a storage hall and the second is two – floor administrative building. This building is situated to the south of Velká Bíteš. This thesis contains technological instructions and a checking and testing plan for these two buildings, which is used for the construction of the floors. Others parts of my bachelor thesis are: omnibus technical report, the facilities of the building site, suggestion of machine composition, healt and safety at work, the situation of wider relations, itemized budget and the time schedule.
Construction Technology implementation stage of floors in the gymnasium building
Hánová, Kristýna ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
This bachelor thesis deals with construction - technologic phase of floors implementation in the building of the Austrian gymnasium, which is located in Prague. The main part of this thesis is technological regulation for wear layers and floor carrier layer of anhydrite. Furthermore, the thesis addresses the situation of wider relations, principles of construction organization, proposal of construction assembly, control and testing plan, safety and health protection during the work, and the budget of items with timeline.
City Office of Nový Bydžovv
Vaníček, Martin ; Tichomirov,, Vladimír (referee) ; Novotný, Miloslav (advisor)
Diploma thesis is about design and making of execution project for office city building which is located in Nový Bydžov. The building is located in the late brownfield area of Dufek´s wood manufacture, which is on the south part of Nový Bydžov. The building has four above ground floors and one below ground floor. The building shape is rectangular of dimensions 53,02 x 17,62 m. On the south, west and east is the façade from height of second floor slightly cantilevered. On the east part the edge of cantilevered façade duplicate slopping edge of the bottom land and it creates wonderful but economical shape. The height of the building from the ground is 14,5 m. The shape of roof is flat, covered with the mPVC foil and gravel mound. Façade which covering the first ground floor is made of polystyrene with thin layer of plaster which creates building plinth. Top cantilevered façade is made of ceramic tiles of dimensions 1200 x 600 mm which are suspended behind the air layer. The ceramic tiles are light brown color. In the bottom part are glazed areas of rectangular and square shapes to create the open feeling in the ground floor. In the rear part is designed coffee bar with nice outside wooden terrace. Windows in the top cantilevered part of the façade are the circular shape and extend the architectural impression of the building. All windows are in the same color of dark blue. The steel parts of the building are also dark blue color. In the bellow ground floor are designed underground parking lot with the maximum capacity 29 cars and technical equipment. In the first floor above ground are designed reception, big lecture hall, exhibition hall, coffee bar with terrace and toilets. In the second floor above the ground are offices, computer room and HVAC equipment. In the third above floor are offices, conference hall, and IT equipment. In the fourth floor above the ground are also offices, maintenance room and storage of furniture.
Hotel
Řehoř, David ; Bartolšic, Vít (referee) ; Matějka, Libor (advisor)
The objective of this thesis is to draw up the design documentation for the construction of a hotel. The hotel is situated on the edge of the golf resort Kaskáda near to Jinačovice. It’s a brick building with two above – ground floors and one underground. There is the staircase in the building that creates protected escape route. The perimeter wall is designed of ceramic bricks Porotherm T Profi. They are filled – in by mineral wool. The hotel is divided into three dilatational parts. There are 35 guest rooms in the hotel; two of them are barrier – free, in total 63 beds. In the ground floor there are entrance, reception, restaurant, bar, kitchen with the background. In the basement there are technical equipment, a fitness room, a wellness, changing rooms, washrooms and a bar. The roof of the hotel is flat. There is the terrace accessible from the apartments in the second floor above the restaurant.
City Office of Nový Bydžovv
Vaníček, Martin ; Tichomirov,, Vladimír (referee) ; Novotný, Miloslav (advisor)
Diploma thesis is about design and making of execution project for office city building which is located in Nový Bydžov. The building is located in the late brownfield area of Dufek´s wood manufacture, which is on the south part of Nový Bydžov. The building has four above ground floors and one below ground floor. The building shape is rectangular of dimensions 53,02 x 17,62 m. On the south, west and east is the façade from height of second floor slightly cantilevered. On the east part the edge of cantilevered façade duplicate slopping edge of the bottom land and it creates wonderful but economical shape. The height of the building from the ground is 14,5 m. The shape of roof is flat, covered with the mPVC foil and gravel mound. Façade which covering the first ground floor is made of polystyrene with thin layer of plaster which creates building plinth. Top cantilevered façade is made of ceramic tiles of dimensions 1200 x 600 mm which are suspended behind the air layer. The ceramic tiles are light brown color. In the bottom part are glazed areas of rectangular and square shapes to create the open feeling in the ground floor. In the rear part is designed coffee bar with nice outside wooden terrace. Windows in the top cantilevered part of the façade are the circular shape and extend the architectural impression of the building. All windows are in the same color of dark blue. The steel parts of the building are also dark blue color. In the bellow ground floor are designed underground parking lot with the maximum capacity 29 cars and technical equipment. In the first floor above ground are designed reception, big lecture hall, exhibition hall, coffee bar with terrace and toilets. In the second floor above the ground are offices, computer room and HVAC equipment. In the third above floor are offices, conference hall, and IT equipment. In the fourth floor above the ground are also offices, maintenance room and storage of furniture.

National Repository of Grey Literature : 20 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.