Design of steel-concrete composite structure of road box girder bridge on by-road of Bludov
Kuba, Michal ; Marván, David (referee) ; Nečesal, Petr (advisor)
The aim of this work is design and assessment of the box-girder road bridge on by-road of Bludov. Bridge is designed as composite steel concrete bridge with 5 spans with distances between supports of 31,25 m; 40,0 m; 60,0 m; 60,0 m and 40,35 m. Main bearing structure is designed as open steel box-girder with reinforced concrete deck. Box girder is braced with longitudinal and transversal bracings. Main structure is separated for each traffic direction. The bridge crosses river Morava and railway in 2nd and 3rd span, respectively. The category of road I/44 is S 21,5/100. The height of steel box girder is designed as 2,5 m. Bridge will be built by incremental launching method, with in-situ casted concrete deck afterwards. The bridge is designed according to current standards. Supporting elements are designed from steel of class S 355 and concrete of class C35/45.
Steel construction of the road bridge
Kloda, Petr ; Barnat, Jan (referee) ; Štrba, Michal (advisor)
The aim of the master thesis was a design of the steel-concrete composite road bridge for a main road in Ostrava. The part of the design was a variant design of the bridge which has theoretical spans equal to 44 m + 55 m + 44 m. Total span of the bridge is then 143 m. Two variants of the bearing steel structure are compared in the preliminary structural design, in the first one a twin-girder is designed and in the second one a box-girder bridge is assessed. The width of the bridge is 14 m and a launching of the bridge without temporary supports is chosen as the assembly method. The design of the bridge structure was carried out according to the valid standard ČSN EN. The final thesis contains variant design, structural design report, where a bill of quantities is stated, engineering report and drawings.
Bridge No. 203 on the highway D1, Považská Bystrica
Mudrík, Marián ; Štrba, Michal (referee) ; Karmazínová, Marcela (advisor)
The diploma thesis deals with alternative design of bridge on highway D1 near Považská Bystrica. Bridge is designed as composite steel-concrete bridge with 6 spans in length 35,7m + 42m + 42m + 42m + 42m + 35,7m. Overall length of superstructure of the bridge is 241m. Construction material used in design is steel S355, concrete C35/45 and reinforcing steel bars are grade B500B. Calculation of superstructure of two variants was performed in preliminary design. First variant is twin-girder structure system and box-girder structure system is second variant. Selected twin-girder bridge was developed in more complex structural design report. Direct erection in place with temporary piers was selected as assembly method of steel structure. Slab concreting will be done by mobile formwork. The design and calculation of the bridge structure was carried out according to valid European design codes. The diploma thesis includes engineering report, structural design report of variants, structural design report of final variant, bill of quantities of assembly parts and drawing documentation.
Bridge No. 203 on the highway D1, Považská Bystrica
Mudrík, Marián ; Štrba, Michal (referee) ; Karmazínová, Marcela (advisor)
The diploma thesis deals with alternative design of bridge on highway D1 near Považská Bystrica. Bridge is designed as composite steel-concrete bridge with 6 spans in length 35,7m + 42m + 42m + 42m + 42m + 35,7m. Overall length of superstructure of the bridge is 241m. Construction material used in design is steel S355, concrete C35/45 and reinforcing steel bars are grade B500B. Calculation of superstructure of two variants was performed in preliminary design. First variant is twin-girder structure system and box-girder structure system is second variant. Selected twin-girder bridge was developed in more complex structural design report. Direct erection in place with temporary piers was selected as assembly method of steel structure. Slab concreting will be done by mobile formwork. The design and calculation of the bridge structure was carried out according to valid European design codes. The diploma thesis includes engineering report, structural design report of variants, structural design report of final variant, bill of quantities of assembly parts and drawing documentation.
Steel construction of the road bridge
Kloda, Petr ; Barnat, Jan (referee) ; Štrba, Michal (advisor)
The aim of the master thesis was a design of the steel-concrete composite road bridge for a main road in Ostrava. The part of the design was a variant design of the bridge which has theoretical spans equal to 44 m + 55 m + 44 m. Total span of the bridge is then 143 m. Two variants of the bearing steel structure are compared in the preliminary structural design, in the first one a twin-girder is designed and in the second one a box-girder bridge is assessed. The width of the bridge is 14 m and a launching of the bridge without temporary supports is chosen as the assembly method. The design of the bridge structure was carried out according to the valid standard ČSN EN. The final thesis contains variant design, structural design report, where a bill of quantities is stated, engineering report and drawings.
Design of steel-concrete composite structure of road box girder bridge on by-road of Bludov
Kuba, Michal ; Marván, David (referee) ; Nečesal, Petr (advisor)
The aim of this work is design and assessment of the box-girder road bridge on by-road of Bludov. Bridge is designed as composite steel concrete bridge with 5 spans with distances between supports of 31,25 m; 40,0 m; 60,0 m; 60,0 m and 40,35 m. Main bearing structure is designed as open steel box-girder with reinforced concrete deck. Box girder is braced with longitudinal and transversal bracings. Main structure is separated for each traffic direction. The bridge crosses river Morava and railway in 2nd and 3rd span, respectively. The category of road I/44 is S 21,5/100. The height of steel box girder is designed as 2,5 m. Bridge will be built by incremental launching method, with in-situ casted concrete deck afterwards. The bridge is designed according to current standards. Supporting elements are designed from steel of class S 355 and concrete of class C35/45.