Implementation of Roofing of Bohumín - Pudlov substation
Gazda, Jakub ; Doubek, Rostislav (referee) ; Nečasová, Barbora (advisor)
Substation, apartment building, roofing, roof, semi-hip roof, gable roof, roof hatch, truss, timber, roofing, technical report, construction site equipment, technological regulation, machine assembly, inspection and test plan, time schedule, itemized budget, scheme, drawings
Preparation of the implementation of the gross substructure of the multifunctional building SW - TRADE
Mikeštík, Lukáš ; Vlčková, Jitka Laura (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the planning of the implementation of the rough substructure of the SW-TRADE multifunctional building. The work focuses on the technological regulation for the entire rough substructure, for which an inspection and test plan, a time schedule, and an itemized budget will be created. It also contains the coordination situation of the construction in the context of wider transport relations, the design of machine assemblies, the organizational principles of construction with a drawing of the construction site equipment, and an emphasis on safety and health protection at work. For this phase, details regarding the construction of the white tub and gabion perimeter wall, and the balance of resources, specifically workers, are also worked out.
Spielberk Office Centre Brno – rough substructure of Towers buildings
Roba, Adam ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The content of my bachelor's thesis "Spielberg Office Center Brno - Rough substructure of the Towers buildings" is a general construction-technological solution of the substructure. This work includes a technical report, technological regulation, budget, off-site transport, construction site equipment, time planning, design of machine assembly control and test plan, work safety and environmental protection.
Preparation of the implemantation of the rough superstructure of the office building Ypsilon
Plutzer, Zoltán ; Šlanhof, Jiří (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor thesis is to solve the technological stage of the rough top construction for the construction of an office building in the town of Šamorín. The construction system of the office building is a wall system, made of Porotherm blocks. The ceiling structures consist of monolithic reinforced concrete slabs. The content of the work is the preparation of a technological prescription for vertical and horizontal load-bearing structures, a technical report of the construction-technological project, a construction timetable for the specified technological stage, a site situation with broader transport relations, a construction organisation including a drawing of the site equipment, a budget for the rough top construction and an inspection and testing plan. Furthermore, the work deals with traffic routes to the site, occupational health and safety, the design of the machine assembly and a comparison of the design options for the horizontal structure.
Realization of the lower construction of a multifunctional building in Prague
Tkachenka, Vadzim ; Sukopová, Dagmar (referee) ; Mohapl, Martin (advisor)
The bachelor thesis deals with the realization of the rough substructure stage of a multifunctional building in Prague 7. The building is based on large-diameter piles and foundation slab, the underground walls are monolithic. The work includes a technological regulation and a detailed inspection and testing plan for drilled piles. In addition, a technical report for the building, the solution of the wider traffic relations, site facilities, the design of the machine assembly for the entire stage and safety requirements are also prepared. The work also includes a time schedule, staff balance and itemised budget with bill of quantities for the entire stage, which are prepared in the relevant software. In the last step, a seminar paper on parking systems is prepared where information on types and mechanisms of parking lifts are provided. The thesis focuses on effective methods of dealing with various aspects of the organization of the construction process, with emphasis on safety, quality and economy of project implementation.
Preparation of the implementation of the gross substructure of the service building, Bystřice nad Pernštejnem
Schneider, Jiří ; Kurková, Dita (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the preparation of the implementation of the rough substructure of the operational building in Bystřice nad Pernštejnem. The work deals with technological regulations for foundation structures, including insulation against moisture, for which an itemized budget, inspection and test plan, and time schedule will be drawn up. In addition, this work contains the equipment of the construction site, the coordination situation with wider transport relations, the design of the machine assembly, the principles of construction organization and safety and health protection at work. In addition, details regarding the rough substructure or insulation against moisture and assessment of construction machinery are worked out for the work.
Preparation of realization of the monolithic skeleton VilaPark Olomouc
Vítů, Ondřej ; Bříza, Lukáš (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the technological stage of the rough construction of the E4 residential building, which is being built as part of the staged construction of VilaPark Tabulový Vrch Olomouc. The building is designed as a reinforced concrete wall system with a total of three above-ground floors. The building has a regular shape, the load-bearing walls are made of monolithic reinforced concrete. The ceilings are slabs, also made of monolithic reinforced concrete. As part of the resolved stage, a technological prescription for monolithic constructions, a time schedule, and an itemized budget are processed. The organization of construction, transport relations, the design of the machine assembly, the control and test plan and safety and health protection at work are also dealt with.
Realization of rough upper construction of a residential building in the Tatranská Lomnice
Šifrová, Sláva ; Štěrba, Martin (referee) ; Novotný, Michal (advisor)
The object of this work is to address the technological stages gross surface works focusing on vertical structures masonry apartment building in the Tatranska Lomnica. The work is handled by the technical design of the building management, technological prescription bricklaying, compare several variants of material, design of machine assembly, situation constructions, technical management equipment, inspection and test plan, job security, time and financial plans.
Construction technological project of administration building in Zlín-Luková
Vyoral, Martin ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
In this thesis is solved by building technological project of an office building in Zlin Januška Compressors - Lukov focusing on selected technological stage. Namely, the implementation of large wooden roof trusses and performing thermal insulation composite system. For these technological steps are processing all documents that are necessary for their implementation. It's technical report on construction technology project, time and financial plan of the building, study the implementation of major technological stages of the main building structure, design of the main building mechanisms, the project site equipment with appropriate drawings and calculations of the costs of site, technical regulations implementing the activities related to monitoring and test plans.
Mixed-use Building in Uherský Brod - Execution of Superstructure
Seménka, Petr ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The content of this bachelor's thesis is a building-technological project of the new building of a polyfunctional building in Uherský Brod. The work includes technical reports, solutions for transport routes, technological rules for making vertical constructions from Porotherm, MaxPlus and reinforced concrete. A control and test plan and design of the plant site including with technical report and a design of the machine assembly are also elaborated on the technological regulations. Furthermore, work safety and timetable and a budget for both variants are developed.