National Repository of Grey Literature 71 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Preparation of the implementation of the gross substructure of the service building, Bystřice nad Pernštejnem
Schneider, Jiří ; Kurková, Dita (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the preparation of the implementation of the rough substructure of the operational building in Bystřice nad Pernštejnem. The work deals with technological regulations for foundation structures, including insulation against moisture, for which an itemized budget, inspection and test plan, and time schedule will be drawn up. In addition, this work contains the equipment of the construction site, the coordination situation with wider transport relations, the design of the machine assembly, the principles of construction organization and safety and health protection at work. In addition, details regarding the rough substructure or insulation against moisture and assessment of construction machinery are worked out for the work.
Completion of Essens company building in Brno - Líšeň, Gross Substructure
Zhorný, Jan ; Kantová, Radka (referee) ; Průcha, Aleš (advisor)
The content of the bachelor's thesis is the preparation of the realization of the gross substructure of the completion of Essens company building in Brno - Líšeň. The work is focused on the processing of the technical report of the construction site equipment, solving traffic relations and subsequent drawings. Furthermore, the content of the work includes the design of a suitable machine assembly, itemized budget, and time schedule of the stage of the gross substructure. Great emphasis is placed on the elaboration of detailed technological prescription for the implementation of piles and subsequently on the implementation of the white tank system. This chapter is followed by the processing of the inspection-check plan. The last part is an analysis of the issue of safety and health protection at work, definition of occupational risks and proposed measures for their elimination.
Implementation of the Subtructure of an Apartment Building
Teplý, Tomáš ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The subject of this bachelor's thesis is the constructional-technological solution of the substructure of an apartment building in Zlin. It is an object with five floors and a basement with garages. The building is based on drilled piles. The bachelor's thesis includes a construction plan with a site equipment, technological procedure of earthworks and drilled piles. A set of machines, a quality control, a budget and a time schedule have been processed for this technological phase. During the building process it is cared about work safety and environment protection.
Building Construction Project for Industrial and Administrative Building ATX
Šrámek, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also including working drawings.
Technological stage of the substructure of an apartment building in Zlín
Žůrková, Dominika ; Řihák, Pavel (referee) ; Kantová, Radka (advisor)
The subject of my bachelor's thesis is the solution of the technological stage of the substructure of an apartment building in Zlín. The building has four floors above ground and one underground floor. The house is based on a foundation slab, which is connected to the perimeter walls, these structures form a white tank system. The thesis includes a technical report, the construction situation with broader relations to transport routes, bill of quantities, technological regulations for earthworks and foundations, design of mechanical assembly, time schedule, machine system design, inspection and test plan, occupational health and safety, white tank system solution, schemes for excavation work and concreting.
Selected Parts of the Construction Technology Project for an Apartment Building in Kroměříž
Vyoralová, Tereza ; Hrdlička, Michal (referee) ; Mohapl, Martin (advisor)
In my master’s thesis, I deal with the preparation and implementation of selected parts of the construction technology project of an apartment building in Kroměříž. It is a non-basement building with 5 above-ground floors. The content of my master’s thesis is the preparation of a technical report for a construction and engineering project, a coordination situation with the solution of closer traffic relations, an assessment of the route of the tower crane, the object's time and financial plan, calculation according to THU, a study of the implementation of the main technological stages of the construction object, a construction site equipment project, which contains a technical report of the construction site equipment for rough construction and finishing works, as well as drawings for the given stages, a design of the main construction machines and mechanisms, a time schedule, an itemized budget for selected parts of SO 01.4, a technological regulation for the ETICS insulation system, a technological regulation for the installation of windows. Control and test plans were drawn up for both technological regulations. Furthermore, in my diploma thesis, there are catchment systems of flat roofs and the blow-door test.
Preparation of the construction of the rough construction of reinforced concrete prefabricated halls in Brno
Loukota, Michal ; Boháček, Adam (referee) ; Kantová, Radka (advisor)
The subject of this bachelor's thesis is the realization of prefabricated reinforced concrete hall in brno. It deals with construction-technological execution of the substructure and assembled skeleton. Its content is a technical report of the construction site equipment including the drawing, the solution of transport relations for the transport of materials and machines, technological regulations for earthworks and the assembly of reinforced concrete skeleton, machine assembly, time schedule of implementation and itemized budget for the given technological stage. The work also deals with the quality of the work and safety of work. Furthermore, several schemes of execution of individual structures and alternative foundation of substructure for prefabricated halls are elaborated.
Apartment complex Netroufalky, building F - building technology project
Čermák, Jan ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for an apartment building in the Campus residential complex II, situated in Brno – Bohunice. Specifically, an apartment building (object F, designated SO 204) was selected, on which monolithic structures of the substructure will be solved. The content of the work is a technical report to the construction technology project, evaluation of transport routes, elaboration of technological regulations for selected technological stages, time schedule for the selected stage and partial detailed section of a typical floor. Furthermore, the construction site equipment with drawing and text part, control and test plan, itemized budget with bill of quantities, design of machine assemblies and work safety solutions are elaborated.
Extension of the seat of the Office for the Protection of Competition - substructure
Kunovský, Jan ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
The subject of the bachelor thesis is to elaborate a construction technology project for the substructure of the Extension of the seat of the Office for the protection of Competition in Brno. The content of the thesis is the technical report of the building with focus on the selected technological stage, project of the construction site, design of transport routes, usage of the construction machines, alternative technical solutions, design of technological procedures, control and inspection plan, construction budget and construction schedule.
Solution of construction-technological phase of substructure of the hotel building in Brno
Staněk, Martin ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The construction of the carcass substructure of the recreation center in Brno-Kníničky is addressed in this bachelor's thesis. It is a three-storey building in which the foundations are made of waterproof concrete structure. The text part of the thesis contains a technological regulation, quality control inspection and test plan, machinery set, technical report of construction site equipment, technical report for the technological project and occupational health and safety plan. The appendix part deals with the construction site plan, the schemes of construction machines tracking, budget as well as gantt's schedule.

National Repository of Grey Literature : 71 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.