|
Multifunctional building - gross substructure
Březina, Vojtěch ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
The object of the bachelor thesis is a coarse substructure of the multifunctional building. This is extension of a three floor to the existing polyfunctional house, witch is located on Masaryk Square in Pelhřimov. The bachelor thesis mainly deals with the stages in which there are processed technical regulations: earthwork, foundation of the building, new building waterproofing and additional waterproofing of existing multifunctional building. The bachelor thesis also addresses building equipment, scheduling, construction situation, itemized budget, proposal of mechanical assembly, inspection and test plan and safety and health protection during the work.
|
|
The implementation phase of gross upper structure of a residential building
Brůžek, Zdeněk ; Čech, David (referee) ; Venkrbec, Václav (advisor)
The bachelor's thesis deals with the solution of selected technological study for construction of residential building. The main content of this work is the technological realization of the main technological stages with a detailed focus on gross upper structure. For the gross stage of the upper structure are developed technological processes for the implementation of masonry construction and installation of ceiling construction, time and financial plan, mechanization plan and design of site equipment.
|
| |
|
Production hall development center LISS - technological foundation stage
Maléřová, Tereza ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
This bachelor's thesis addresses the technological stage of the groundwork of the production hall and development centre LISS. The construction is based on bored piles of a wide diameter. Chosen constructions and technological equipment are based on shallow foundations. The main chapters of this thesis are technological regulations for groundwork, wide diameter bored pile and shallow monolithic foundations. Following chapters are about quality assurance and control, design of appropriate building machines and small machinery, time schedule and budget. It also deals with work safety and health protection and organisation of construction including draft of site equipment.
|
| |
|
Technological phase of the cover ground object
Fatura, Josef ; Čech, David (referee) ; Henková, Svatava (advisor)
Thesis resolves civil technological stage of the roofing of the administrative buildings and warehouse halls in the Grand River. It deals with the structure, roof insulation, nekrokevní, klempířskými and povlakovou-covering elements. The work contains technology rules, a statement of the Bill, the timetable, drawings and other technological documentation stage.
|
| |
|
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.
|
| |
|
Central bank - advantages and risks of its independence
Čech, David ; Janáček, Kamil (advisor) ; Potužák, Pavel (referee)
This work is about central bank independence and about advantages and risks resulted from this position. The beginnig of the work is about history of central banking in the world and in our republic. The next capture is dedicated to the question of necessity of central banks and it uses especially the work of F.A.Hayek. It also describes his suggestion to implement the competition between private issuers of money. The last and the largest chapter is about central bank independence. After the definition of independence, there is a part concerned types of independence, mainly the legal and the actual one. The level of independence can be usually measured by few indexes. The way how to calculate them is also in the text of this work. Final part of the work is aimed on advantages and risks resulting from the independent status of central bank. The main advantage is represented by elimination of time inconsistency problem, on the other hand the main risk is the absence of responsibility of central bank for her policy.
|