National Repository of Grey Literature 915 records found  beginprevious906 - 915  jump to record: Search took 0.01 seconds. 
Technological construction phase of the upper housing facility
Karel, Jaroslav ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
Subject of this bachelor´s thesis is the upper gross production technology of housing facility in Náchod. In this work are addressed technical report site facilities, machine set design, occupational safety, timetable, technological provision, monitoring and test plan and enviromental protection.
Technological Solutions of GUVEX Company’s Cladding Annexe in Lanškroun
Strnadová, Lenka ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
This bachelor thesis deals with the technological solution of cladding annex of an administrative nature and warehouse space. This is specifically about using lightweight cladding. The paper includes technological regulation, schedule, bill of quantities, budget, organization of construction principles and ensuring the quality requirements.
Residential building Šemberova, Brno - The solution phase realization of the envelope
Novák, Martin ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This Bachelor's thesis deals with the execution of the envelope residential building Šemberova. It concerns realization of the ventilated façade. In this Bachelor's thesis, the building technological project contains primarily a model of the building site accessories, the technological process, the time schedule, the financial heftiness, the machines formation, the check and the test plan, the occupational safety, for these technological phases.
The terrace house Omice - gross bottom construction
Němec, Lukáš ; Klempa, Lukáš (referee) ; Biely, Boris (advisor)
This bachelor thesis is focused on the technological stage of the lower gross building terraced house in Omice. Part of the thesis is technical report the work site facilities, technical regulations, inspection and test plans, reports the machine design, plan of safety and protection of health and environmental, budget and timetable.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Realization of technological steps gross upper building construction of ski facilities in Kouty nad Desnou
Jandová, Renáta ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis concerns two technological phases of roughly build upper building of ski areal in Kouty nad Desnou. The building serves as a dinning and bowling centre. In particular there are three restaurants. The object is located in the centre of the village, under the ski slope. It will be used all over the year ass entertaining centre. The building has one floor bellow and two above the ground. The construction is made like monolithic core structure with Porotherm brick blocks. The individual technological phases focus on the vertical supporting constructions in second floor and monolithic ferroconcrete roof above second floor. In pursuance of second task, the thesis compares financial and time point of view of two technologies of making vertical supporting walls.
Solving the phase of floors of an apartment house in Brno
Meluzínová, Lucie ; Čech, Josef (referee) ; Hrazdil, Václav (advisor)
Subject of this thesis is the phase of floors in apartment house in Brno. This thesis contains technical reports, statement measurement, technological specification, site equipment, scheduling, mechanical assembly design, monitoring and test plans, budgeting, safety work and environmental protection.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.
Construction and Technological Solutions Structural System of the Building for Fitness, Rehabilitation and Accomodation in Štíty
Revús, Adam ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
The Bachelor´s thesis pursues the decisive issues of supporting structure of the building for fitness, rehabilitation and accommodation in Štíty. The thesis seeks to find the building – technological optimum for main construction works. The thesis includes technical report of the object, technological prescription, equipment construction, machinery , budget, timetable,inspection and test plan, work safety.
PROJECT DESIGN INTRODUCTION OF CRM IN THE COMPANY
Zemánek, Jakub ; Oškrdal, Václav (advisor) ; Zálešák, Jiří (referee)
This master´s thesis describes the design of the project concerning the introduction of CRM system in the company using project management methodologies. The company, to which the project will be applied, excels in industrial automatization.

National Repository of Grey Literature : 915 records found   beginprevious906 - 915  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.