National Repository of Grey Literature 348 records found  beginprevious31 - 40nextend  jump to record: Search took 0.01 seconds. 
Construction-technological project for the construction of a central charging station in Púchov
Stopka, Peter ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
This diploma thesis focuses on the construction of a construction technological project for the construction of the Central Charging Station in Púchov. The building is located in the industrial area of Púchov and in the area of Continental Matador Rubber. In the thesis is elaborated technical report for building technological project, co-ordination situation of construction with wider transport routes, time and financial object plan, study of the realization of the main technological stages, construction site design, design of main building machines and mechanisms, time schedule of main building, securing material resources for the monolithic part of the building. In the thesis are made, technological rules for drilled pilots and ceiling structure above the first overground floor. Technological regulations follow control and test plans. Other assignments that have been made in this work, such as the occupational safety and health plan, the design and comparison of cranes and the item budget.
Realization of the lower building of a dwelling house in Děrná
Bulawa, Tomáš ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is to process a building construction project of the lower building of dwelling house in Děrné. The building is designed as a three- floor object with flat roof and the object will be located on the sloping terrain. The foundations of object will be stepped. The thesis focused on the preparation of the construction proces of the carcass lower building and on its organization. The content of this work is to proces technological regulations. These regulations are processed accompanying and summarized technical report, solution of broader logistic relations, proposal of the mechanical set, proposal of the construction site equipment, control and test plan, health and safety at work, the itemized budget with bill of quantities and the time-schedule plan. Part of the work is graphical illustration of construction site equipment and the movements of dozer and backhoe loader.
Preparation for the implementation of administrative buildings Palmovka Park
Boucník, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.
Construction Technology Project assembled halls in Olomouc
Gajdoš, Nikola ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
In my diploma thesis I document the construction of administrative, commercial and warehouse building in Olomouc. In particular, I deal with selected parts of the construction and technological preparation of the facility. I deal more closely with the technological regulations for the assembly of reinforced concrete skeleton and sheeting. My diploma thesis includes building site design, set of machinery, control and test plans, budget, schedules, personnel and machine deployment, variation of sheet metal finishing and drawing on the budget.
Technological phase of the upper structure of the polyfunctional building in Žilina
Papučík, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is the processing of the construction technological stage of the superstructure of the polyfunctional building in Žilina. The bachelor's thesis is a technical report of a building-technological project, a time schedule for the construction of a given technological stage, a situation of a construction site, a construction organization for a given technological phase, a solution of transport routes to a construction site, a gross building budget, a technical regulation for masonry and monolithic ceiling constructions, occupational safety and health, design of machine assembly, control test plan for masonry and prefabricated ceiling constructions, comparison of cranes.
Construction-technological project of Integrated Rescue System Station
Šmíd, Radim ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
Realization of rough construction on hall in Brno
Příkazský, Michal ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
The subject of this bachelor’s thesis is the realization of rough construction of hall in Brno. The aim of the construction technological project is the processing of machinery itemized budget, a time plan, a proposal of machine set, inspection and test plan, a proposal of workflow, transport links and site equipment.
Residential house Hliniště, construction-technological solution of rough substructure
Divácký, Petr ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis is focused on the construction and technological solution of the rough substructure of the Hliniště apartment building in Velké Meziříčí. The house is composed of two separate building structures, built next to each other and set in the south sloping terrain. The construction is based on foundation feet and passports that carry the load from a top structure made of a prefabricated skeleton filled with ceramic masonry. The last 5th floor is realized as a residential attic, covered with a wooden roof with a saddle roof and sheet metal, profiled cover. The main chapters of this work are the technological regulations for the execution of earthworks and foundation structures, which are also processed by control and testing plans. In addition, the machine assemblies are designed for these activities, their schematic travel along the construction site, the excavation drawing, the building site layout, the budget item, the timetable and other attachments.
Manufacturing facility in Písek u Jablunkova - realization of rough top structure
Labaj, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the rough top structure of the manufacturing facility for the company Olzanka s.r.o. This work deals with the walling of the building, realization of the semi-mounted ceiling structure and roof truss with tin roofing. For these processes, technological regulations were drafted, machine assemblies were designed, an item budget was drawn up together with a bill of quantities. In addition, an OHS regulation, a control and test plan for the walling process, a time schedule, traffic relations and site equipment drawings were developed.
Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou
Kurková, Dita ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.

National Repository of Grey Literature : 348 records found   beginprevious31 - 40nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.