|
Life cycle cost of passive house
Javořík, Erik ; Prak, Michal (referee) ; Tichá, Alena (advisor)
The diploma thesis analyzes the overall life cycle costs of a passive family house. In the theoretical part the thesis deals with the definitions of concepts needed to understand the given issue and to determine the costs in individual parts. In the practical part the knowledge and procedures to two passive family houses are applied.
|
| |
| |
|
Economic Evaluation of Project Carried out on Municipal Level
Kaňa, Jan ; Holá, Michaela (referee) ; Hromádka, Vít (advisor)
This bachelor thesis described an economic evaluation of a public investment project which was implemented at the municipal level. The theoretical part focused on induction to the problem by explanation of basic concepts, presentation of various possible methods for evaluation of public projects, and overview of possible ways to finance the project at the municipal level. The practical part evolved a case study which examined an economic evaluation of ‘sokolovna‘ reconstruction in a village ‘Kobylí‘, followed by determination of requirements to gain critical variables efficiency and critical input values from the investor's point of view.
|
|
Economic evaluation of wood buildings
Gregorová, Lucie ; Aigel, Petr (referee) ; Výskala, Miloslav (advisor)
The aim of the bachelor thesis is comparing timber frame construction and masonry building in the first and second part of building life cycle. The selected factors of these parts are costs and time-consuming of structure, comparing the masses of structures, their thermal insulation properties and their fire resistance. In the end, there is a comparison of costs of construction and construction lead-time for timber structure and masonry building.
|
|
The cost estimating of the construction works assembled in variant structures
Pecen, Martin ; Hanák, Michal (referee) ; Tichá, Alena (advisor)
This diploma thesis focuses mainly on designing projects using BIM technology, specifically on the field of budgeting. In the theoretical part the current 2D project documentation and the current price system is described. Furthermore, the thesis deals with information modeling and its implementation into common building practice. At the end, it is described how to use current pricing system for budgeting in the BIM environment.
|
|
Cost Analysis of a building
Polanský, Dan ; Výskala, Miloslav (referee) ; Aigel, Petr (advisor)
The diploma thesis purpose is to choose optimal structure of the modernisation of slab block flat roof, according to building life cycle coast minimalisation. Based on the theoretical knowledge, the design of the stack was made in different phases and based on the building life cycle cost, considering the decreasing value of money over time. The selection of the optimal solution followed, taking account the specific conditions of the given scope of realization and the specific object. The choice is justified by the related analysis of key items.
|
| |
|
Cost analysis of engineering structures
Klec, Martin ; Kudrna, Jan (referee) ; Výskala, Miloslav (advisor)
The thesis titled "Cost analysis of engineering structures" presents a comparison of the life cycle costs of linear structures with an asphalt surface against the life cycle cost of linear structures with a concrete surface. The thesis deals with prices, costs, calculations and budgets in its theoretical part. The following chapters present history and current status, road constructions, life cycle of the construction and differences between concrete and asphalt covering. Practical part of the thesis is divided into three parts. In each sub-section, there is a practical example of comparing the costs of the life cycle of linear structure with the asphalt surface against the costs of the life cycle of linear structure with the concrete surface. Everything is expressed in graphs.
|
|
Lifecycle of selected building
Smečková, Veronika ; Aubusová,, Alena (referee) ; Tichá, Alena (advisor)
In this thesis, the main objective is to determine the price of selected construction project during its life cycle and assess operational costs. As a selected object is a family town house built in 1982 as a building type okal. The theoretical part is devoted to professional concepts and detailed information regarding the lifecycle, durability, budget, and wear-related issues. The practical part includes an itemized budget and the actual award of a selected object by using the software on valuation. The resulting values of individual valuation methods are then compared and graphically displayed. Furthermore I judge the actual operating costs incurred during the period.
|