National Repository of Grey Literature 54 records found  beginprevious25 - 34nextend  jump to record: Search took 0.01 seconds. 
construction and technology project of reconstruction fo the textile factory
Lorencová, Andrea ; Řihák, Pavel (referee) ; Novotný, Michal (advisor)
The master thesis contains a construction and technology project of reconstruction of the textile factory nearby Jihlava. The technical report provides all the basic information about the construction to this project. Assembly of steel structure and demolition works are detailed processing in the technological regulations. Other documents are processed for these selected technological regulations which are needed for their implementation – ie. control and test plans, drawings of building equipment, draft of machinery and plans of health and safety and fire prevention. Time and financial plans are also component of this project. Another annex of this thesis is budget for a major building and selected structural details.
Roofing of winter stadium Krnov - construction technological project
Kolářová, Jana ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
This Master´s thesis deals with the realization of roofing winter stadium in Krnov. Selected points of construction technology project are technical report, financial plan and schedule, project site facilities and design of the main construction machinery. Detail work solves rough superstructure. This part contains the technological prescription of specifications supporting the roof structure, transportation of oversized glued arched trusses, inspection and test plan, risks and precaution, a detailed schedule and itemized budget. The work also includes a draft contract for work.
Apartment building on Tišnov - construction technology project
Zemánek, Petr ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The diploma thesis is devoted to the construction technology project of the foundation construction part of the Tišnov - Mlýnská Apartment Building (SO 01). The diploma deals in detail with the special foundation and monolithic construction of the building. The work contains a technical report, route solutions, a study of the main technological stages, machinery solution, technological regulations, the quality control plan. In the attachment, the time schedule, workforce plan, design of machinery and materials as well as drawings of the construction site equipment.
Construction technological project of the annex of the school gymnasium in the town of Hrob
Smrčka, Adam ; Jílek, Jan (referee) ; Mohapl, Martin (advisor)
This diploma thesis deals with the construction technological project of the annex of the school gymnasium in the town of Hrob in the Ústí region. The work contains a technical report of the construction technological project, a coordination situation of the building with the solution of wider relations of transport routes to the construction site, time and financial construction plan for construction objects and a study of the implementation of the main technological stages. For the main construction object, an itemized budget for the shell construction, a graph of the need of workers and machines, and a detailed time schedule were also worked out. The work also includes a construction site equipment project, including drawing documentation for the stages of earthworks and shell construction, and the design of the main construction machinery. As part of the technological regulation, the work deals with the assembly of the prefabricated reinforced concrete skeleton of the gymnasium, including a detailed quality control and test plan for this process. Last, but not least, the work contains a safety and health protection plan for working on the construction site, a noise study, a calculation of the entire building according to THU, a schema of the assembly of the skeleton by a mobile crane including its assessment and a schema of the reach of the truck concrete pump.
Selected Parts of the Construction Technology Project of the Eden Apartment Building in Poprad
Macho, Andrej ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The subject of this final thesis is to process selected parts of the construction technological project for the apartment house Eden in Poprad. The thesis deals with the implementation of the rough construction of the building. The content of this thesis is a engineering report, site plan with estate road layout, time schedule and financial plan for the whole object, feasibility study of the main technological stages of the building, construction site equipment project with drawings of three main technological stages, design of major construction machinery and mechanisms, time schedule of the rough construction of the main building, balance of workers and main machines, item budget, technological regulation for the realization of monolithic floor slab, control and test plan for the realization of monolithic reinforced concrete structures. As another assignment, I process selected points of LEED certification, noise study and health and safety plan.
Construction Project for implementation of administrative building of BBP
Janeček, Milan ; Rotrekl, Ivo (referee) ; Kantová, Radka (advisor)
The content of my diploma thesis is a construction technology project of an administrative building in Brno. The work emphasizes the feasibility of the object. I prepared an implementation study with a detailed solution of the construction process in terms of time and financial plan. Technological regulations, control and testing plans and occupational health and safety are proposed. Drawings are pre-pared for the performed construction
Construction-technological project of the revitalization of the tipping plant in Vítkovice
Labaj, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
This diploma thesis deals with the proposal of a construction technological project of the tipping Plant in Vítkovice. The work consists of a technological report, transport routes proposal, study of the realization of the main technological stages, time and financial plan of all main objects, construction site project, design of main construction machines and mechanisms. The project also includes itemized budget of the main building structure together with a detailed timetable, financial plan and schedule deployment of construction machinery and workers. The content of this thesis also includes a technological project for the implementation of semi-assembled ceiling structures with a plan for securing material resources and a technological project for the execution of remediation works of concrete structural elements, for which an inspection and test plan with the description of inspection was prepared. The health and safety plan was also created from the perspective of the health and safety coordinator.
Construction technology project of the apartment building in Velká Bíteš
Sotolář, Václav ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of this final thesis is the construction technology project of an apartment building in Velká Bíteš. The thesis contains a technical reports, construction technology study, coordination situation, time schedule and financial plan of the building in the structure of individual construction object, time schedule of the main building, solution of transport routes, technological regulation for the ventilated facade, control and test plan of the ventilated facade. Furthermore, a design of the construction site equipment is prepared, including a technical report, Occupational Health and Safety on the construction site for the superstructure construction phase, budget for the superstructure construction phase and a comparison of variants of the ceiling structure. Finally, a comparison of lifting mechanisms, LEED certification and assessment of photovoltaic facades is processed.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Implementation of the bottom construction of the hotel in Strbske pleso
Macho, Andrej ; Doubek, Rostislav (referee) ; Novotný, Michal (advisor)
The subject of this bachelor thesis is to process a building construction project of the lower building of hotel Ovruč in Štrbské Pleso village, Vysoké Tatry. It is focused on realization of soilcrete and foundation structures. This thesis consists of accompanying and summarized technical reports, sitting of the building with regards to transport routes, technological regulations, organisation principles and equipment of building yard, the itemized budget and time schedule, proposition of construction machines configurations, inspection and testing plan, health and safety at work. All relevant technical drawings are included as well.

National Repository of Grey Literature : 54 records found   beginprevious25 - 34nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.