National Repository of Grey Literature 37 records found  beginprevious21 - 30next  jump to record: Search took 0.01 seconds. 
Integral frame bridge
Dobeš, Marek ; Šopík,, Leonard (referee) ; Koláček, Jan (advisor)
The aim of this diploma thesis is the design and assessment of a single span inclined integrated frame bridge structure over rail tracks. Three preliminary studies have been designed and then a best variant was selected for more detailed analysis. A reinforced concrete slab with steel girders with a span of 28.39 meters was developed. The model was developed using the MIDAS/Civil program and the limit state assessment was carried out using the MS Excel program. The procedure and dimensioning of the calculation is carried out according to valid standards and regulations.
Bridge No. 203 on the highway D1, Považská Bystrica
Mudrík, Marián ; Štrba, Michal (referee) ; Karmazínová, Marcela (advisor)
The diploma thesis deals with alternative design of bridge on highway D1 near Považská Bystrica. Bridge is designed as composite steel-concrete bridge with 6 spans in length 35,7m + 42m + 42m + 42m + 42m + 35,7m. Overall length of superstructure of the bridge is 241m. Construction material used in design is steel S355, concrete C35/45 and reinforcing steel bars are grade B500B. Calculation of superstructure of two variants was performed in preliminary design. First variant is twin-girder structure system and box-girder structure system is second variant. Selected twin-girder bridge was developed in more complex structural design report. Direct erection in place with temporary piers was selected as assembly method of steel structure. Slab concreting will be done by mobile formwork. The design and calculation of the bridge structure was carried out according to valid European design codes. The diploma thesis includes engineering report, structural design report of variants, structural design report of final variant, bill of quantities of assembly parts and drawing documentation.
Multi-span highway bridge
Doležal, Lukáš ; Novák, Richard (referee) ; Koláček, Jan (advisor)
The subject of diploma thesis is designing multi-span highway bridge over Řepovský potok valley, dirt roads and biocorridor. Three variants of bridge were designed and one of them – box girder 10 span bridge, has been chosen. Bridge deck is made from cast in place post tension prestressed beam. Load-bearing structure is concreting step by step on fixed and moving support. Total length of bridge is 560 m. The analysis of structure was projected on several computational models. They have been made in software Midas Civil and SCIA Engineer 18.1. The assessments of ultimate limit state and serviceability limit state were made in all steps of building in longitudinal and cross direction. In the analysis in longitudinal direction is included the time dependent analysis. Structural design was made in software MS Excel according to valid standards. Finally, drawing documentation and visualization were made.
Prestressed highway bridge
Blaha, Martin ; Diviš, Dalibor (referee) ; Panáček, Josef (advisor)
The diploma thesis deals with the design of a continuous prestressed bridge structure transferring the D56 motorway on the Frýdek-Místek bypass. The bridge bridges the local watercourse of the river Olešná, Příborská street and road II / 473. Three studies were proposed, from which a variant of a two-beam continuous prestressed monolithic slab was selected and elaborated. The static model and calculation of its internal forces took place in the program SCIA Engineer 20.0. The calculation is performed according to valid standards, limit states, which also includes the effects of construction. The work also contains detailed drawing documentation.
Design of the road bridge in Brno
Kutálek, Jiří ; Čihák, Petr (referee) ; Klusáček, Ladislav (advisor)
The subject of the diploma thesis is a design of a highway bridge across the Svratka river in Brno. Among three options, the arch bridge with a trapezoidal bridge deck from prestressed concrete was chosen. The load effect is calculated with the assistance of Scia Engineer software. The design and the assessment of the structure are made for the ultimate limit state and serviceability limit state. Static assessment is done by hand calculation according to CSN EN 1992-2. The thesis includes drawings and visualizations of the bridge structure.
BRIDGE ON D1 (LIETAVSKÁ LÚČKA - VIŠŇOVÉ) OVER VALLEY AT km 4.313
Hudyma, Nazar ; Dvořák, Tomáš (referee) ; Zich, Miloš (advisor)
The subject of this Master's thesis is the design of a road bridge on the D1 in the section Lietavská Lúčka - Višňové in the Žilina Region, Žilina District, Slovak Republic. The bridge is used to cross the valley in KM 4,313 and the road in KM 4,410. Three variants of bridging were proposed, but further in the work an assessment is made on one of the variants. The total length of the superstructure is 354.00 m, the theoretical total span of the structure is 352.00 m. The bridge has 4 spans and is constructed by free cantilever method .The locations of the supports were limited by unsuitable geological conditions at the construction site (active shear area in Quaternary sediments), especially in span No. 3 (span lenght 104.00 m) and span No. 4 (span lenght 75.00 m). The monolithic part of the bridge structure will be concreted by free cantilever method with the largest length of the cantilever 52.00 m. The outermost parts of fields No. 1 and No. 4 will be cast-in-place using fixed scaffolding.
Slab road bridge
Blaha, Martin ; Koláček, Jan (referee) ; Panáček, Josef (advisor)
Bachelor thesis deals with a design of a prestressed bridge structure that transfers the D35 motorway between village Velký Újezd and town Lipník nad Bečvou. The bridge is bridged by the local Kyjánka stream. Three studies were designed from which a variant of a rectangular prestressed monolithic slab was selected and elaboraterd. The static model and its internal forces were calculated in SCIA Engineer 18.1. The calculation is made according to valid standards.
Housing+
Doubrava, Šimon ; Jurkovič, Peter (referee) ; Galeová, Nicol (advisor)
A group of lots is located in a gap between a crossroad at Tomkovo square and the only natural solitaire nearby, Husovice hill. A newly-built highway bridge which is a part of outer Brno bypass unloads the street line of a big part of traffic load. Corner buildings, which stand between the bridge and the site serves as a noise barrier and together with the bridge, which moves the noise and vibrations to the upper levels change the site in a peaceful place. Calm character, the possibility to grab hold of the conection between Tomkovo square and Husovice hill and convenient commodity-monetary relations were three main reasons why the site was chosen for a proposal of dwelling complex.
Bridge on a highway
Knotek, Jan ; Nečas, Radim (referee) ; Panáček, Josef (advisor)
Subject of this bachelor’s thesis is design of new slab bridge construction over the II/464 road between the villages Příbor and Bílovec. The bridge converts highway D47. Thesis includes three studies. Pre-stressed rectangular cross-section slab with elliptical exterior trim, pre-stressed plate- grinder construction and construction of prefabricated beams and monolithic slab. For next assessment was chosen option no.1. Load effects calculation is solved in SCIA engineer 16.1. Design and assessment of the structure are made according to valid standards and regulations.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.

National Repository of Grey Literature : 37 records found   beginprevious21 - 30next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.