National Repository of Grey Literature 76 records found  beginprevious21 - 30nextend  jump to record: Search took 0.00 seconds. 
Technological stage of the substructure of the Faculty of the Environment in Prague
Hudcová, Natálie ; Kantová, Radka (referee) ; Doubek, Rostislav (advisor)
This bachelor thesis is an assessment of the technological planning of a Czech agricultural university in Prague, Faculty of the Environment substructure. Thesis focuses on the mechanisation as well as process of the construction. The building consists of three underground and four aboveground floors. Altogether seven floors are built upon a concrete slab foundation, supported by piles. The content includes technical report, general layout, vicinity plan, ground works schedule, the process of construction sheet piles and soldier beams with anchors. Technological schedule include the machinery schedule together with technological tests schedules, followed by the site facilities plan, moving on to bill of quantities, budget time schedule, H&S quide and a construction noise pollution report.
Production hall MONTGAS - realization of the gross substructure
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the gross substructure of the new production hall of the company MONTGAS a.s. in Hodonín on the street U Kyjovky. Part of this technological phase is the realization of earthworks, driven gravel FRANKI piles, driven reinforced concrete FRANKI piles, cast-in-place reinforced concrete foundation pads, sills and strip foundations, soil slab, base layers and reinforced concrete floors of the building including steel fibre reinforced concrete slab and cast-in-place reinforced concrete structure of the paint shop inside the production hall. It also includes damp proof layer and insulation of foundation structures. The content of this work is the technology of earthworks and all piles in the form of technological regulation. Construction costs are calculated in an itemized budget from student version of the BUILDpowerS software with a bill of quantities. The schedule is drawn up in the form of a schedule from student version of the CONTEC software. Plans are in place to ensure both quality and safety during construction.
Pavlov Winery - rough substructure
Ševčík, Daniel ; Bříza, Lukáš (referee) ; Biely, Boris (advisor)
This bachelor thesis is about technological stage of the rough substructure design of winery in village Pavlov. Content of this thesis includes engineering report of technological project, construction site equipment used machinery, transport routes and technological regulations for groundwork. This thesis also contains construction time schledule and itemized budget.
Preparation for the implementation of the lower building of the pension in Opava
Žůrková, Amálie ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The bachelor's thesis deals with the implementation of a substructure of a guest house in Opava. This building, founded in complex foundation conditions, is composed of five floors without a basement. The house is based on piles, which support the foundation strips. Part of the rough substructure is also an installation channel, made in the form of a watertight concrete structure. This work contains a technical report, the situation of the construction with wider relations of transport routes, a detailed statement of acreage, technological regulation for earthworks and foundation, drawing and report of construction site equipment, time schedule, machine design, control and trial plan, safety and health at work, schematic procedures of earthworks and foundations, as well as item budget.
Architectural and technological project of a residential building in Brno
Malaník, Jan ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
The thesis contains analysis earthworks, foundations, carcass substructure of residential house on the street Kopečná 9 in Brno. The work also includes gradual changes in site equipment, detailed schedule of work for selected works, rough schedule of the whole building, construction budget, site equipment budget and details of construction. Specialization in the work addresses the specific use of roads and traffic signs.
Solution of the construction-technological phase of the substructure of the fire station building in Brno
Motyčka, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The bachelor's thesis deals with the technological phase of the substructure of the fire station. It is a four-storey building without a basement, which is located on a sloped ground near the Brno dam. The individual floors are designed as receding with dominant terraces on the side of the dam. The building is designed as a reinforced concrete monolithic skeleton with a system of waterproof concrete foundations supplemented by external waterproofing of PVC foil. The building is based on the base plate. The work contains a technical report of the object, a closer and broader situation of transport relations, a detailed statement of acreage, technological regulation for the implementation of the waterproof concrete foundation, drawing and report of construction site equipment, schedule, machine design, control and test plan, safety and health at work, then a variant assessment of construction machinery.
Technological stage of the substructure of a residential building in Trutnov
Bonaventura, Pavel ; Bříza, Lukáš (referee) ; Kantová, Radka (advisor)
The bachelor's thesis aimed to prepare the stage of implementation of the rough lower construction of the apartment building which is located in Trutnov. The block of flats is based on a grade construction made of concrete strips footing and construction blocks of pernament formwork. Technological regulations have been created for the stage of realization of the rough lower construction, the equipment of the construction site have been suggested, appropriate machine set has been chosen, shipping relations for material and machine supplies have been considered, OHS (occupational safety and health), control and trial plan have been applied as well as a schedule and budget were created.
Apartment Building in Komarov - rough substructure
Kaláb, Ondřej ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of the bachelor thesis is construction - technological solutions rough substructure of residential house on the street Kovářská in Brno - Komarov. The main parts of work is proposal workflow, mechanical assemblies, itemized budget, the construction schedule, building equipment, inspection and test plan, transport relations of the construction site. One of the main part is the foundation of the construction technology using "white bath", together with settlement development near of the Brno city center.
Multifunctional building Mlýnská - gross substructure
Krkošková, Adéla ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
The content of this bachelor thesis is preparation of realization of gross substructure of multifunctional building Mlýnská in built-up area of Brno city. The work deals with the technical report on the structural and technological project construction, technical report construction site equipment and solution broader transport relations, including drawings. It also includes design mechanical assembly, time schedule, item budget and calculation of building. One of the main topic is technological prescription for the implementation process of the monolithic structures using white tank principle and related inspection and check plan. Traffic solution is important part of this work also.
Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město
Seménka, Petr ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.