National Repository of Grey Literature 149 records found  beginprevious128 - 137nextend  jump to record: Search took 0.01 seconds. 
Selected Parts of the Construction Technological Project of Apartment Block in Hejčín, Olomouc
Onderka, David ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The aim of the diploma thesis is selected parts of the construction project of the apartment block in Hejčín, Olomouc. It deals in detail with the most optimal design of the machine assembly, the assessment of the lifting mechanism, the equipment of the building site, the timetable and, last but not least, the itemized budget of the structural work of the apartment block. The work is based on the technical documentation from the borrowed project documentation.
Constructive technological project of warehouse
Říha, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The aim of the diploma thesis is to elaborate parts of the frozen food warehouse construction project in Dašice in the area of MD logistics as, resulting in the elaboration of a technical report on the building technology project, the coordination situation of the building with the broader relations of the transport routes, the time and financial plan of the construction in the plane of the buildings, implementation of the main technological stages of the main building, drawing of the building site equipment, design of the main building machines, detailed time schedule of the main building, budget line, technological regulation for implementation of foundation structures consisting of drilled pilot and supporting walls, quality control and test plan for the given stage , drawings of the earthworks equipment and the construction of the hall.
Construction and technological project of polyfunctional building Sokolská 5 in Olomouc
Slováček, Ondřej ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The subject of this diploma thesis is the elaboration of the building project of Polyfunkční dům Sokolská 5. In the course of the diploma thesis is elaborated a summary technical report, report of building site and drawings for individual stages. The implementation of the waterproofing of the base structure and the reinforced concrete monolithic skeleton are subject to technological regulations and control and test plans. In this work the object time and financial plan, the use of machines and mechanisms and health and safety at work are also solved. For the main building objects, an item budget and a detailed schedule are prepared. Part of this work is also the calculation of the heat transfer through the envelope of the building.
Constructive technological project of a business incubator
Sviták, Marek ; Jakubíček, Jiří (referee) ; Diaz, Yvetta (advisor)
The content of the diploma thesis is the processing of a constructive technological project of a business incubator. The objective of this constructive technological project is to approach the construction process in the framework of the study of the implementation of the main technological stages, which closely follows the project of the site construction equipment with suitable layout of its construction, as well as the design of suitable machinery mechanisms for realization of the main building. Part of the project is also to determine the timeliness of work, financial and material management, and technological regulations for implement selected activities, taking into account the quality control and planning of their implementation. The whole construction process is completed in the final part of the diploma thesis on the solution of the occupational health and safety issues.
LD Seating production hall - construction technology project
Jůzl, Martin ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is a building-technological project on the production and assembly hall LD Seating in Boskovice u Brna. The solution is influenced by the existing hall in the area of the investor, where there will be a future new building. Based on this fact, the appropriate measures are chosen. The project puts emphasis on the off-road transport and the technological process of assembly of the prefabricated reinforced concrete hall, which will be solved from the financial and time point of view. The workflow will be affected by machine assembly, site facilities, and wider transport relationships. The project also solves the concept of the whole issue as a whole. All building objects are taken into account. Based on this, an object schedule and budget are developed.
PFM Flexi storage hall - construction technology project
Chroustovský, David ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
Preparation for the implementation of administrative buildings Palmovka Park
Boucník, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.
Community elderly home in Tršice - Structural Work
Kmeť, Peter ; Patloka, Jiří (referee) ; Biely, Boris (advisor)
The aim of my bachelor thesis is the construction and technological solution of the rough building of the Seniors Community House in Tršice. The communal house consists of twelve residential units, common and social rooms. Part of the work is technical report, building site, transport, technology prescription, control and test plan, risk plan, environmental protection, item budget and timetable. The project documentation from the VAteler design studio was used to process this work.
Residential house Hliniště, construction-technological solution of rough substructure
Divácký, Petr ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis is focused on the construction and technological solution of the rough substructure of the Hliniště apartment building in Velké Meziříčí. The house is composed of two separate building structures, built next to each other and set in the south sloping terrain. The construction is based on foundation feet and passports that carry the load from a top structure made of a prefabricated skeleton filled with ceramic masonry. The last 5th floor is realized as a residential attic, covered with a wooden roof with a saddle roof and sheet metal, profiled cover. The main chapters of this work are the technological regulations for the execution of earthworks and foundation structures, which are also processed by control and testing plans. In addition, the machine assemblies are designed for these activities, their schematic travel along the construction site, the excavation drawing, the building site layout, the budget item, the timetable and other attachments.
Essens Administrative Center in Brno - Líšeň, Structural Upper Construction
Martincová, Michaela ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with the technological stage of the rough top of the administrative building of essens in brno-líšni. It focuses on the assembly of the supporting structure from the prefabricated parts and the implementation of monolithic supporting structures inside the building. The work includes the technical report, the situation of wider transport routes, the statement of the design, the time schedule, the design of the machine assembly, the two technological regulations, the organization of the construction, the budget item, the control and test plans and the work safety.

National Repository of Grey Literature : 149 records found   beginprevious128 - 137nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.