National Repository of Grey Literature 151 records found  beginprevious118 - 127nextend  jump to record: Search took 0.00 seconds. 
Preparation for realization of reinforced concrete storage hall in Polička
Zelinková, Marta ; Kratochvílová, Erika (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
Construction Technology Project of University of Tomáš Baťa in Zlín
Krištof, Marek ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of my diploma thesis is selected parts of the construction technology project of Tomas Bata University in Zlín. The content of the work is mainly elaborated technological regulation for making the monolithic ceiling shell of the main aula of the building, processing of the control and test plan and drawings of the ceiling shell. Next, I worked on the design of suitable transport routes to the construction site, the processing of the studies of the implementation of the main technological stages, the design and the processing of the drawings of the construction site, which varies in time depending on the progress of the technological stages, the design and assessment of the lifting mechanisms and machines, time and financial plan, the timetable for the rough construction and the main technological stages, budget of the rough construction, health and safety at work.
Preparation and organization of ELIT warehouse building in Brno
Boháček, Adam ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is the design of realization of the Elit storage hall in Brno based on the provided project documentation. Part of the thesis is a technical report for a building technology project, a study of the realization of the main technological stages of the building, the situation of the building with wider transport route links, the project of the building site including the technical report of the construction site equipment, the design of the main building machines and mechanisms. Further part of this work are a chapters on the implementation of the supporting structure of the halls, which are the Technological Regulation for the assembly of the prefabricated reinforced concrete skeleton, The Plan for securing the material resources for the assembly of the prefabricated reinforced concrete skeleton and The Assessment of the usability of the mobile cranes for mounting the prefabricated reinforced concrete skeleton. Part of this work is also a variant solution for the implementation of the Densitop MT industrial floor including a price comparison comparison with the original design. From the time and financial point of view, the object time and financial plan is elaborated, followed by the detailed schedule of the main building construction and the itemized budget of the main building, including the bill of quantities. Due to the high demands on the quality and safety of the construction, the chapters of the Quality Control and Testing Plan for Reinforcing the Prefabricated Reinforced Skeleton and the Plan for Safety and Health at Work on the building site are also included.
Preparation of a warehouse building in Kuřim
Přikryl, Jan ; Rotrekl, Ivo (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is preparation of the realization of a warehouse situated in Kuřim. The work contains technological regulations for the construction of the reinforced concrete skeleton and the realization of the industrial floor, the design of the main machines and mechanisms including the time deployment, the detailed time schedule of the main building object SO 101.3 Hall B, time schedule and financial plan of the building – the objects one. Due to the scale of the work, documents relating to safety and quality control are also processed. Further, the technical report of the site equipment, including drawings, is processed. In the chapter, which provides space for other assignments, the OSH plan is elaborated, the budget of object SO 101.3 Hall B, Safety measures for the installation of reinforced concrete skeleton. The last point of the diploma thesis deals with specialization in the field of realization of inland communication.
Realization of the construction of a block of flats in Jundrov
Vons, Matěj ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The bachelor thesis deals with the realization of the upper gross construction of the apartment house in Jundrov. The content of the thesis is the technological regulations for vertical and horizontal constructions, a project of precast concrete ceiling panels and a detailed schedul. Because of its demands on quality of building construction and safety during building itself there are included parts dealing with this issue in the thesis. The thesis also contains a technical report of the construction site including its technical drawing. The part that deals with different assignment is drawn up for example item budget. The basis for the processing was the partial project documentation.
Implementation of the rough substructure of the emergency building of the Faculty Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this bachelor thesis is a solution of the rough substructure of the emergency building of the Faculty Hospital Brno. The thesis deals with the technological regulation for foundation constructions, with other topics including an inspection-check plan, a time schedule and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of the construction and occupational safety and health risks. Finally this thesis contains several schemes for the implementation of individual structures and the energy performance of buildings.
Technological phase of the upper structure of the polyfunctional building in Žilina
Papučík, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is the processing of the construction technological stage of the superstructure of the polyfunctional building in Žilina. The bachelor's thesis is a technical report of a building-technological project, a time schedule for the construction of a given technological stage, a situation of a construction site, a construction organization for a given technological phase, a solution of transport routes to a construction site, a gross building budget, a technical regulation for masonry and monolithic ceiling constructions, occupational safety and health, design of machine assembly, control test plan for masonry and prefabricated ceiling constructions, comparison of cranes.
Implementation of the gross overhead construction of the storage hall in Hradec Králové
Štěpánek, Michal ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The bachelor thesis is aimed at the construction and technological solution of the rough top structure of the storage hall in Hradec Králové. Bachelor thesis contains technological background for the execution of rough construction. This work aims to solve problems with the procedures for the implementation of masonry and prefabricated structures. I focused on the part of the hall that will serve for administration and I devised the implementation procedure and the time consuming. As the project documentation did not have anything to do with the ceiling 1.NP, I had to solve the project site first and then I did the implementation technology. I also compared the two lifting devices in terms of economic and time requirements. Another objective was to solve the transport of individual building materials on site. The proposed solution is based on my personal experience with the implementation and consultation of leading experts in the field. The aim of this work is to propose an optimal course of implementation of the storage hall.
Resort Johanka - realization of rough upper construction
Lisý, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor´s thesis deals with built-in realization with attic accommodation for guests of Resort Johanka´s premises. A new ceiling construction and roofing execution is realized. The thesis contains technology of execution of single constructions in the form of a technological regulation. Building expenses are stated in item budget with a bill of quantities. The duration of particular procedures are shown in the construction schedule. From the security and quality realization point of view plans regarding these aspects are processed.
Implementation of Superstructure of Sports Centre in Polná
Mikulášek, Jiří ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The subject of the thesis is the implementation of superstructure of the multipurpose sports center in Polná. The content of the thesis is the technical report, the solution of the transport routes, the technological specification for the installation of wooden trusses and the flat roof covering, the solution of the site facilities, the design of the machine assembly, the control and test plan for the activities contained in the technological specifications, the item budget, the time schedule, the balance of resources and the safety at work.

National Repository of Grey Literature : 151 records found   beginprevious118 - 127nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.