National Repository of Grey Literature 108 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Commercial building with flats
Kubát, Pavel ; Gintar, Jan (referee) ; Kacálek, Petr (advisor)
This thesis solves the new building of commercial building with flats in vacant space in Prague street in Hořovice. This building is with the cellar in a part of object and it has four floors. Commercial building has rectangular ground plan and it is covered with flat roof. The facade will be furnished with contact thermally insulated system with improved plaster and cladding tape. The object is proposed to be made with brick from block. Ceiling is made from iron-concrete ceiling panels. In the basement there are cellar boxes for the each apartments, store room and boiler room. In the ground floor there are four shops which are directly approachable from the outside. Every shops have own store room, office and restroom. There are also situated pram room for apartments and two stores for household rubbish. The first floor is constructed for offices where two companies can be located. In the second floor there are six apartments. Two of them can be adapted for the person with reduced mobility. The third floor is identical with the second floor.
Above-standard family house in Krelov - constructionally technological project
Ježowiczová, Barbora ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
Subject of this work is pursuance technology of above-standard family house. This diploma thesis contains construction and technology report, technological prescriptions for important parts of buildings, technology report of plant building site, concepts of mechanical assembly, inspection and test plan, technology report of health and safety on the construction site. Budget, calculation and time planning, a drawing of the facilities of the construction site, description of transport relations is included in addendum. Work also contains part about use of Calcium silicate masonry and its comparation.
Residential house Ševětín - technological phase coarse upper construction
Marek, Miroslav ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This bachelor´s thesis is focused on building technology upper stage of construction site of a residential building in Ševětín. It deals with technical Reports, technological methods of construction, the report also contains technical Reporst of building equipment, schedule, design of mechanical assembly, inspection and test plan, safety, and finally comparing different ways of walling.
The terraced houses in Svitavy - the construction technology project
Bajerová, Radka ; Klempa, Lukáš (referee) ; Motyčka, Vít (advisor)
The subjects of the thesis are chosen parts of the building technological project for the preparation and realization of the terraced family houses in Svitavy. The solution includes The study of the main technological stages realization, Time schedule and financial plan, The project of the site facilities including design of the main hoisting mechanism. The realization of ceiling construction is described in detail by The technological prescription. The solution also includes a proposal of local and utility roads repairs on the streets Gorkého and U Studeného potoka.
Multifunctional building - Houbalova - construction technology project
Ševčík, Jan ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The subject of this thesis is the solution of building technology project poly-functional complex with a focus on execution of construction. Gross building is designed reinforced concrete skeleton combined with masonry. Technology will be developed Code for reinforced concrete monolithic frame and masonry. On the techno-logical stage it will be processed inspection and test plan and the balance of the major sources for the implementation of reinforced concrete structures 1.NP. The thesis is a proposal for construction site, which is complemented by a social facilities and offices. For an overall view of the construction of a multifunctional complex is processed time and financial plan, which will be further elaborated for building construction B. Availability of supply is verified by the design of routes. Like other task will be processed proposal formwork system for con-struction 1.NP Building B.
Technological phase of the upper structure of the nursery building in Habry
Štípa, David ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the bachelor thesis is a technological solution of rough upper structure of a kindergarden in Habry. The main aim of the thesis is the brick support construction and the ceiling contruction. The thesis also includes a site layout with broader relations to traffic routes, budget for the technological procedure, technical report, technical report for site equipment, technological directive for the construction of ceiling and support brick structure, Inspection and check plan, time schedule, concept of machinery setup and safety and protection of health during work.
A mountain hotel - technological phase of the upper structure
Franc, Filip ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of this bachelor's thesis is a consturction of a Mountain hotel, in detail structural work of upper construction with brick support structure and ceiling panels SPIROLL being the main focus of this thesis. The thesis also includes a technical report, site lay-out with broader relations to traffic routes, acreage list, technological directive for brick support structure, technological directive for ceiling panels SPIROLL. Technical report of building site equipment, time schedule, draft of a machine setup. Inspection-check plan, safety and protection of health during work are also included.
Manufacturing facility in Písek u Jablunkova - realization of rough top structure
Labaj, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the rough top structure of the manufacturing facility for the company Olzanka s.r.o. This work deals with the walling of the building, realization of the semi-mounted ceiling structure and roof truss with tin roofing. For these processes, technological regulations were drafted, machine assemblies were designed, an item budget was drawn up together with a bill of quantities. In addition, an OHS regulation, a control and test plan for the walling process, a time schedule, traffic relations and site equipment drawings were developed.
Execution of Superstructure - Rezidence Sukovy sady
Nývlt, Josef ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The aim of the presented bachelor thesis is to describe realization of selected stage of the construction - technology project with a focuse on technological processes of the superstructure of an apartment building in Hradec Králové – Residence Sukovy sady. The thesis is divided into several thematic chapters when the first chapters are devoted to the introduction of the construction project as well as of the new building via the accompanying and summary technical report. The realization of the selected construction phase is described in more detail in the technical report of the construction site, in the technological regulations for the implementation of load-bearing structures from the systems Porotherm, Heluz, Ytong and Porfix. Also, proposal and verification of suitable transport routes, especially for construction supply, is presented. Moreover, the design of machinery set, quality control plan for vertical structures, time schedule and budgets for selected variants of masonry systems are included. The text part of the thesis is supplemented with an appendix part which contains scheme of work zones for selected technological process etc.
Preparation for realization of an apartment house in Lanškroun
Křivohlávková, Lucie ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The content of the diploma thesis is a building-technological project of the new building of residential building Lanškroun. The thesis contains technological regulations for a rough bottom structure and a rough top structure. Technological regulation are complemented by design of machine assembly, site facilities and control and test plans. Work safety, construction risk assessment, time schedule of main object, object time and financial plan and budget of main building are also solved. An important part is the economic comparison of tower crane and mobile crane and green facade.

National Repository of Grey Literature : 108 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.