National Repository of Grey Literature 221 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Construction-technological project of Ayurvedic pavilion in Počátky
Lisý, Ondřej ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The diploma thesis deals with realization of an Ayurvedic pavilion in the premises of Saint Katerina Resort. The proposed new compound is designed to extend the leisure services of the Saint Katerina Resort in Počátky. The feasibility study of the main technological stages of the project is solved in this diploma thesis. The construction of the object is described in the technical report. Both a detailed itemized budget of the construction and a detailed timetable to show the duration of each process is elaborated for the construction technology project. Futhermore, the design of site construction equipment, design of machine assembly, time deployment of machines and staff balance is elaborated. The project includes a technological regulation of the realization of the skeleton supporting frame structure and both control and test schedule. The work safety for the assembly of the wooden building supporting frame is composed.
Building-Technological study of ENVI Centre
Doruška, Jan ; Valenta, Michal (referee) ; Diaz, Yvetta (advisor)
Bachelor thesis contains selected parts of the building and technological studies for building an educational center in ENVI Vysoke Pole. That the processing of documentation is primarily a technological study of the implementation of the main technological stages for the specified object, time and financial plan construction, the basic concept of building operation, itemized budget with bills of quantities, technological regulation for the implementation of the double-skinned walls, security measures for the implementation of monolithic reinforced concrete ceiling and control test plan.
Technological study of construction boarding house in Třeboň
Hanzlovská, Nikola ; Fila, Lukáš (referee) ; Diaz, Yvetta (advisor)
The object of this work is to study technology in Trebon pension street Chelčického. That the processing of documentation will be mainly on technological studies major technological implementation stages for the specified object, time and financial plan of the building, the basic concept of building operation, technological Code for anhydrite floors on which control is executed test plan and health and safety at work, where is analyzed first general protection during construction and then directly to the technological regulation. The document contains more technical report on the construction technology studies.
Construction technological project of storage and manufacturing facility - Nihošovice
Hanzlovská, Nikola ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The subject of this thesis is the construction and technological project of warehouse and production facility - Nihošovice . The thesis is mainly focused on the study of the main technological parts and technological specifications for the implementation of the mounted frame, which solves loadbearing system of the building. For the technological specifications is processed control plan , health and safety . The thesis project consists of building equipment, technical reports , time and financial plan of the SO A1 , the proposal of machines and mechanisms, coordinating site plan and block plan of traffic routes , plan for securing material resources , time and financial plan object .
Residential house in Čáslav, gross superstructure
Němec, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This thesis investigates the solution of selected technological project of the construction of gross superstructure residential building in the former barracks Prokopa Holeho. Their work includes the technical report solved object, technological specification, bill of quantities, schedule and budget, addressing broader transport relations, organization development, design of mechanical assemblies, including drawings and technical news site facilities, safety, environmental protection, inspection and test plans.
GROSS MONOLITHIC SUPER STRUCTURE - BLOCK OF FLATS KAMECHY, THIRD STAGE, SECTOR 38, BUILDING A
Hoffmann, Ondřej ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The subject of this thesis is the solution of the gross monolithic superstructure especially designs of technological process for the realization of the structure of the building. The technical regulations will be prepared draft reports formwork, describes the individual work and procedures during construction and guidelines for compliance with safety on the construction site. The thesis also includes proposal for building equipment, machinery, preparation of schedules, etc.
The technological stage superstructure of the object of theatre in Ždírec nad Doubravou
Sokol, David ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The content of this work is the construction of the theater in Ždírec nad Doubravou, concrete implementation of carcass superstructure. This tesis contains construction, technology report, solving traffic routes, bill of quantities, technological prescription, technological report of site equipment, schedule, machinery, inspection and test plans, technological report of health and safety on the construction site.
The Extension of the Business Incubator - South, Rough Superstructure
Sankot, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of thic bachelor thesis is processing of a technological solution of the rough top construction of the Business Incubator in Brno. It is a new four-storey, non-cellular building for administrative and office activities. The subject of this thesis is processing of a technological regulation for the prefabricated reinforced concrete skeleton. The next parts of the thesis, focused on the phase of the rough top construction, are: technical report, situation with wider relations of the transport routes, plan of the construction organization with the drawing of the building site facilities (equipment), itemized budget with the statement of acreages, schedule of work, inspection and test schedule, design of the mechanical (machine) assembly and the safety of work of the (solved) technological phase.
Newly-built multipurpose building in Boskovice, execution of superstructure.
Sojka, Petr ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The theme of my bachelor thesis is processing technology of rough superstructure of new multi-building owned by Lamex. This is partly double-deck building consisting of storage, administrative and retail space. The subject of my work is processing technology prescription for construction of precast concrete frame and construction of steel fibre reinforced concrete floor. The other parts of this thesis, which with focused on rough superstructure are technical report, construction plan, budget with statement of merit, time schedule, wokers‘ balance, site equipment, safety of workers.
Koks production hall - upper stage of construction
Vaculík, Zdeněk ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
Subject of this work is execution of the superstructure, especially solution of mounted frame included the lining together with the sheathing construction and building roof. The building will serve as assembly and storage hall for the Koks Production company. Reinforced concrete precast frame forms supporting structure. The building is split to two parts, single-storey hall and two-storey administration part. Construction-technological part from complete execution of the building rough superstructure has been selected as a bachelor’s thesis subject. The technological regulation for the assembly of reinforced concrete precast frame has been elaborated. The precast frame is formed by precast elements supplemented by the lining between the columns in the administration part. The solution of following subjects of building construction was taken into consideration too: • solution of suitable site machinery • workers health, safety, and preservation on the site • health protection • test and trial plan for the mounted reinforced concrete skeleton • time schedule and economic analysis for the superstructure • logistics and material storage on the site

National Repository of Grey Literature : 221 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.