Implementation of Roofing of Bohumín - Pudlov substation
Gazda, Jakub ; Doubek, Rostislav (referee) ; Nečasová, Barbora (advisor)
Substation, apartment building, roofing, roof, semi-hip roof, gable roof, roof hatch, truss, timber, roofing, technical report, construction site equipment, technological regulation, machine assembly, inspection and test plan, time schedule, itemized budget, scheme, drawings
Preparation of the implementation of the gross substructure of the multifunctional building SW - TRADE
Mikeštík, Lukáš ; Vlčková, Jitka Laura (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the planning of the implementation of the rough substructure of the SW-TRADE multifunctional building. The work focuses on the technological regulation for the entire rough substructure, for which an inspection and test plan, a time schedule, and an itemized budget will be created. It also contains the coordination situation of the construction in the context of wider transport relations, the design of machine assemblies, the organizational principles of construction with a drawing of the construction site equipment, and an emphasis on safety and health protection at work. For this phase, details regarding the construction of the white tub and gabion perimeter wall, and the balance of resources, specifically workers, are also worked out.
The technological stage of the rough substructure of OÚ Ostrá
Kholodniak, Marko ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The bachelor's thesis is focused on the implementation and reconstruction of the lower gross structure of the municipal office in Ostrá. The original building has one underground floor, one above ground floor and a non-residential floor. The building is based in a flat manner on the foundation strips, the vertical load-bearing structures are made of full-burnt bricks, the horizontal load-bearing structures above the 1.PP are formed by a monolithic beam ceiling and a reinforced concrete slab supplemented with a steel beam. The extension will have one above-ground floor and one underground floor. The extension will be based on a base plate supplemented with foundation belts around the perimeter of the base plate, which, however, will not have a load-bearing function. The vertical supporting structures will be completely covered with the POROTHERM system, the ceiling above the 1st PP extension will be ŽB monolithic. The work contains a technical report with a focus on the selected technological stage, the situation of the building with wider traffic relations of the transport routes, a list of measures, a technological regulation for the implementation of foundation structures, a drawing and report of the construction site equipment, a time schedule, a design of the machine assembly, an inspection and test plan for the implementation of the foundation construction, safety and health protection at work.
Spielberk Office Centre Brno – rough substructure of Towers buildings
Roba, Adam ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The content of my bachelor's thesis "Spielberg Office Center Brno - Rough substructure of the Towers buildings" is a general construction-technological solution of the substructure. This work includes a technical report, technological regulation, budget, off-site transport, construction site equipment, time planning, design of machine assembly control and test plan, work safety and environmental protection.
Apartment house Kurim - rough substructure
Šíma, Martin ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
This bachelor´s thesis is focused on technological and constructional project of apartment house in the Kurim c.p. 1741. Content of thesis includes engineering report of technological project, construction site equipment, used machinery, situational concept of transport routes and technological regulations for white bathtub. This thesis also contains construction time schledule, itemized budget and details of white bathtub.
Technological stage of the rough superstructure of an apartment building
Křičenský, Jan ; Strádalová, Aneta (referee) ; Kantová, Radka (advisor)
The aim of this bachelor's thesis was to develop selected parts of a construction technology project focused on the rough superstructure stage of a residential building in the town of Jaroměř. Specifically, the project addresses the execution of all load-bearing structures, which consist of both masonry and monolithic walls and monolithic ceilings. Additionally, it covers the installation of balconies and staircases, which are made as concrete prefabricates. More detailed plans were created for the construction work, including the design and verification of supply routes, a control and testing plan, ensuring work safety, and proposing the necessary machinery for their implementation. The procedure for carrying out the work and the corresponding schedule for the entire construction are also elaborated. The rough construction of the building is addressed from a financial perspective as well, within the framework of an itemized budget for this construction stage. The thesis includes a proposal for the construction site facilities, including the calculation of electricity and water consumption. Finally, the work focuses on the verification of the proposed crane and selected construction technology details.
Technological stage of the rough superstructure of an apartment building
Čečotka, Daniele ; Řihák, Pavel (referee) ; Kantová, Radka (advisor)
The subject of my bachelor's thesis was the development of selected parts of the technological project for building the Community Center in Třanovice. I specifically focused on the stage of the rough upper construction. The building's structure consists of load-bearing perimeter walls made of ceramic blocks and a semi-prefabricated ceiling structure. This thesis includes the design of transport routes, technological procedures, inspection and testing plans, the timeline for the selected part, an itemized budget for the selected part, and the proposal for machinery for this stage. The work also includes the site layout concept, including a technical report, a detailed bill of quantities for the masonry, and a list of materials for the described technological procedures. In the final part of the thesis, an alternative design for the ceiling structure is presented, along with a proposal for revising the project documentation according to modular coordination and selected construction details.
Roof Construction implementation of Planetarium in Prostějov
Stancheva, Karina ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the bachelor this is the realization of the roofing stage of the new planetarium in Prostějov. In this work, technological processes related to the implementation of the truss, covering works, carpentry, plumbing, welding and finishing works in the form of roof insulation and installation of the supporting structure are solved. The design of the truss is specific to the different slopes of the roof plane, including the connection of the flat roof to the cupola. The content of this work is the Technical Report, transportation of materials and transport relations next to the construction site, technological regulations for the implementation of work, Technical Report of the construction site equipment, design of the machine assembly, inspection and test plans, work safety solutions, timetable, itemized budget, and thermal technical assessment of the structure, scheme of the construction site equipment.
Technological stage of the rough superstructure of the Horova Brno apartment building
Kadlec, Josef ; Kantová, Radka (referee) ; Doubek, Rostislav (advisor)
The bachelor's thesis deals with the construction-technological preparation of the rough superstructure of the Horova apartment building, which is located in Brno. The apartment building is planned in a gap and consists of three parts, the highest of which has 5 above-ground floors. The building has masonry made of brick blocks and the ceiling structures are monolithic. The construction-technological preparation of the building consists of a technical report for the Horova apartment building, the situation of the building with wider relations of transport routes, a list of dimensions, a technological regulation for the realization of monolithic ceiling and monolithic vertical structures, a solution to the construction organization, a time schedule, a design of a machine assembly, quality requirements and their provision for resolved processes, work safety for the implementation of monolithic constructions, itemized budget, contract for work between the main contractor and subcontractor and contract for renting a room for the construction manager.
Technological stage of the rough superstructure of the apartment building Hálkova Brno
Jedlička, Petr ; Nečasová, Barbora (referee) ; Doubek, Rostislav (advisor)
This bachelor's thesis focuses on the rough top construction of an apartment building on Hálkova Street in Brno. The thesis includes a technical report, a situation with broader traffic relations, site facilities, a bill of quantities for the technological stage, technological regulations, inspection and test plans. In addition, occupational health and safety for rough top construction is addressed. The last two chapters include a developed itemized budget for the rough top construction and a comparison of different materials for the vertical structures.

National Repository of Grey Literature : 1,252 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?