National Repository of Grey Literature 23 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
The Extension of the Business Incubator - South, Rough Superstructure
Sankot, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of thic bachelor thesis is processing of a technological solution of the rough top construction of the Business Incubator in Brno. It is a new four-storey, non-cellular building for administrative and office activities. The subject of this thesis is processing of a technological regulation for the prefabricated reinforced concrete skeleton. The next parts of the thesis, focused on the phase of the rough top construction, are: technical report, situation with wider relations of the transport routes, plan of the construction organization with the drawing of the building site facilities (equipment), itemized budget with the statement of acreages, schedule of work, inspection and test schedule, design of the mechanical (machine) assembly and the safety of work of the (solved) technological phase.
Solution of construction-technological phase of substructure of the hotel building in Brno
Staněk, Martin ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The construction of the carcass substructure of the recreation center in Brno-Kníničky is addressed in this bachelor's thesis. It is a three-storey building in which the foundations are made of waterproof concrete structure. The text part of the thesis contains a technological regulation, quality control inspection and test plan, machinery set, technical report of construction site equipment, technical report for the technological project and occupational health and safety plan. The appendix part deals with the construction site plan, the schemes of construction machines tracking, budget as well as gantt's schedule.
Petrol station at D5, technological phase substructure
Čeňková, Lydie ; Krejčí, Vlastimil (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the construction of buildings lower highway service areas, primarily pumping station and its accessories. Basis of the work are technological regulations for the implementation earthworks, installation of underground steel tanks fuel, the work of the foundation and system design site. The work also includes an itemized budget, time schedule, schedule, safety and quality inspection work performed and draft mechanical assembly for the stage.
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.
Construction-technological stage of the roofing of the production building in Rohovládová Bělá
Marek, Jiří ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
This bachelor thesis deals with the technological part of the roofing of the assembly center Top Centrum in Rohovládová Bělá. The aim of this thesis is the development of the technological prescription, the solution for transportation routes, the site equipment, the time schedule, the proposal of the machinery set, and the development of the inspection and test plan. The aim of the thesis also includes the development of the itemized budget including the measurement report and the report on safety and health protection at work.
Construction Technology implementation stage of finishing an apartment building in Oslavany
Pelc, Miloš ; Bravenec, Roman (referee) ; Diaz, Yvetta (advisor)
Bachelor’s thesis deals with building technology of finishing works of the apartment house in Oslavany u Brna. The main part of the thesis addresses technological regulations. The regulations solve the technological process of bearing layer, wear layer and, also, inner plastering. The thesis also concerns itself with the block plan, the principles of organization of construction, proposition of mechanical composition, control and test plans, occupational health and safety (OHS/OH&S) and itemized budget with time schedule.
Implementation of the gross substructure of a residential building in Jihlava
Mironiuková, Iveta ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The object of the bachelor thesis is a coarse substructure of the apartment building. This building is eight-storey building. Three floors are garages and five floors are flats. The building is in the courtyard of a former factory TESLA at Jihlava. The bachelor thesis mainly deals with the stages in which there are processed technical regulations: earthwork and foundation of the building. The bachelor thesis also addresses building equipment, scheduling, itemized budget, proposal of mechanical assembly, inspection and test plan and safety and health protection during the work.
Financial Plan of Bulding Order
Kašová, Michaela ; Hroníková, Marta (referee) ; Hejduková, Amálie (advisor)
The theme of bachelor´s thesis is financial plan of building order. This thesis is dividend into two parts - theoretical and practical. In the theoretical section explains the concepts of construction contract, own sources of funding, foreign sources of funding, grants, preparation of construction contracts, financial planning and implementing the project. The practical part describes the construction contract, investor and main contractor. There is also time schedule, monthly costs, sources of funding and financing plan is to work .
Construction technology project of polyfunctional building in Rosice
Pelc, Miloš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The thesis deals with construction technology project of polyfunctional building in Rosice. The parts of the thesis are the construction technology study, the assessment of transport realations, the proposition of mechanical composition and occupational health and safety (OHS/OH&S). The thesis also contains technological regulations for flat roof and white tank and control and test plans for them. There is also itemized budget with time schedule of structural work. Thesis also deals with comparison of damp proof membrane and waterproof concrete.
Private clinic Slavkov - building and technological project
Hartenberger, Lukáš ; Štěrba, Martin (referee) ; Vlčková, Jitka Laura (advisor)
The subject of my thesis is the construction and technological project of the new private clinics in Slavkov near Brno in South Moravia. The main goal of my work is a study of implementation of major technological stages of building. These technological steps will cover the main building. This study will be established timetable. Furthermore, the project will be processed construction site, the design of the main building machines and mechanisms, with the budget bill of quantities for the main building structure. Technological specification and control plan is prepared for the realization of construction scaffolding, flat roofs and implementation envelope. Re-entering the occupational health and safety plan for the aforementioned works.

National Repository of Grey Literature : 23 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.