National Repository of Grey Literature 245 records found  beginprevious223 - 232nextend  jump to record: Search took 0.01 seconds. 
Preparation and realization of apartment house in Třebíč
Krejčí, Michal ; Štola, Miroslav (referee) ; Vlčková, Jitka Laura (advisor)
This Master’s thesis deals with the technological project and realization of apartment house in Třebíč. This work includes technical reports ZS and STP, site equipment, wider transport relations, budget calculation, time planning, inspection and test plan, design mechanisms and job security for this building.
Construction of school Rajhrad – construction and technological preparation
Kijonka, Jakub ; Navrátil, Karel (referee) ; Biely, Boris (advisor)
Subject of this master thesis is the structural and technological background for the construction of high school in Rajhrad. This consists of time and finanical plans, technological instructions for the reinforced concrete monolithic skeleton, time schedule, item budget, construction site layout, machinery configuration , audit and evaluation plans, work place safety protocols, environmental plan of the construction site.
Sales and service center Prague - the building technological project
Trhlík, Lukáš ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
In this diploma thesis deals with execution of ground works, foundation constructions, steel and armored concrete monolithic framework of the sales and service center in Prague. Establishment of the building will be done on armored concrete basement feet, strips and basement plate. The building is desinged in part as a steel framework and in part as a armored concrete framework. The building technological project contains for the phases primarily time and financial plan of object, technology prescription, time schedule, budget, model of the building site accessories, model of the machines, check and test plan, safety plan.
Futurama Business Park - object C, technological preparation of construction
Okrouhlý, Petr ; Navrátil, Karel (referee) ; Biely, Boris (advisor)
The subject of the thesis is the solution of technological preparation of new building construction Futurama Business Park - the object C. In this thesis, is solved by the implementation of earthwork, foundation structures and reinforced concrete monolithic skeleton. Establishment of the building will be made on the concrete foundation slab. The building is designed as a reinforced concrete frame with perimeter steel columns and glass façade. The work also includes a timetable and financial plan (budget) building, technological regulations, technical report of building equipment, mechanical design assembly, inspection and test plan, design of site facilities, safety plan, impact of technological stage on the environment.
Conversion of Grain Silo in Zlin
Mikócziová, Martina ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The subject of this bachelor´s thesis is a conversion of the grain silo in Zlín, which is situated at the western outskirts of the Bata´s area, behind the City heritage zone. Along the southern side of the property there is a railway no. 331 Otrokovice – Vizovice and a four-lane road which is the main traffic connection going through the entire city of Zlín. The main new function of the building is the adventure centre. It offers various activities such as trampoline gym, laser game, mirror maze, karaoke, indoor jungle gym for kids and adventure activities for adults. Apart from these, additional features can be found in the building, including a shopping mall, restaurant, offices, accommodation facilities and a café with a beautiful view of the city. The new function of the object brings an interesting feature to this part of the city and therefore makes the area more beautiful and attractive to people. Regarding the construction, the building has a rectangular ground plan, a flat roof and in the past it was functionally divided into 2 parts. The lower part with 6 floors was previously used as a fruit and vegetable warehouse. The second part with 10 floors is where the grain silos were situated. The load bearing skeleton is made of reinforced concrete round columns with a diameter of 650mm, in a ground plan grid of 6,15 x 6,15m which is typical for Baťa architecture. The floor slabs are made of reinforced concrete supported by stiffening secondary beams. The concrete frame structure is filled with brick masonry on the outer perimeter. The new functional use of the building keeps current state of the load bearing structures. A significant intervention is the demolition of walls between the silos, leaving only the load-bearing structure of columns and a modification the eastern and northern façade.
Manufacturing of Ladies Dresses
Kuba, Jonáš ; Suchánek,, Petr (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The project is dedicated to an industrial hall designated for manufacturing of ladies clothing for a brand Manifesto. The building is located in one of brownfields in Brno, which offers breathtaking city views. This building lies beside the main road Rokytova where a bus stop is situated and is separated from this busy street by trees. The aim is to place the hall on the brownfield estate in a suitable way and this purpose can be fullfilled by using a wooden fasade. Warehouse and production are situated on the second floor. Offices, a canteen, a buffet, a cloakroom, a showroom, etc can be found in the basement.
Implementation of production hall gross superstructure
Kvapil, Michal ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
Writing of this bachelor thesis was stimulated by the construction of a new production hall in my hometown. It had been a long time since a similar project was dealt with in this town, and therefore it aroused my interest. The bachelor thesis includes the description and technical documentation for the construction of the reinforced concrete building frame of the production hall of the M&T company in Dobruška. The aim of this thesis is to solve the method and potential problems of the construction. I focused on the ceiling of the administrative part of the building. Contrary to the original technical documentation, I suggested cheaper and more time-saving solution of the ceiling: using the prestressed hollow core slab SPIROLL instead of the reinforced concrete composite floor slab FILIGRAN and concreting of the ceiling. I suggested this solution on the basis of my personal experience with the implementation of various types of the ceiling, and the subsequent analysis of their advantages and disadvantages. My suggested solution of the ceiling caused the reduction of this stage’s costs by 13% and the time reduction by 71% of working time. The other aim of this thesis was to solve the problems with the excessive and oversize transportation of the reinforced concrete roof trusses. In the end, these transportation problems together with the financial aspects resulted in the revision of the original technical documentation. The investor decided for the less demanding solution of the construction and for the shorter span of the hall. As for the concreting machinery, I suggested to use the machines (mixer truck and mobile concrete pump) from the nearby concrete plant to reduce the total transportation costs. The main contribution of the bachelor thesis is acquaintance with the construction of the reinforced concrete building frame and with practical verification and comparison of two different solutions of one construction with respect to the financial and time investments
Selected structural detail of the reinforced concrete frame
Teplý, Jakub ; Matušíková, Anna (referee) ; Girgle, František (advisor)
The bachelor thesis solves and compares between them three methods (ČSN EN 1992-1-1, ČSN 73 1201, MC 2010) of punching shear slabs. In this thesis are the methods analyzed and compared with each other. In other part of thesis is solved and compares dependence of the required shear reinforcement areas on the various parameters, for example thickness of slabs or percentage of reinforcement. Conclusion provide an evaluation of the results and compared in charts course of dependence of the required shear reinforcement under the same conditions state.
Conversion of Grain Silo in Zlin
Klímová, Radka ; Svoboda, Jiří (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The subject of the Bachelor thesis is conversion of grain silo in Zlín-Prštné. Building plot is between avenue of Tomáš Baťa, Přímá and Jateční. Close to the building is situated railway station Zlín-Prštné. The aim is to design creative centre for artists, designers, architects and others. They will be allowed to rent here a space for the realization of their ideas. Part of the proposal was to create a square on the investigated area.
The implementation phase of gross upper structure of a residential building in Olomouc
Hanyášová, Hana ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The subject of this thesis is the technology of gross upper structure of residential building in Olomouc with eight floors. The construction is designed as monolithic from reinforced concrete. In this work it is mainly processed technological specification for reinforced concrete frame, design of mechanical assembly, schedule and itemized budget. There are also deal with quality requirements, occupational safety, site equipment and transport routes of materials for the phase.

National Repository of Grey Literature : 245 records found   beginprevious223 - 232nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.