National Repository of Grey Literature 186 records found  beginprevious21 - 30nextend  jump to record: Search took 0.00 seconds. 
Price calculation of revolving material
Černý, Lukáš ; Výskala, Miloš (referee) ; Aigel, Petr (advisor)
The subjekt of bachelor thesis Calculation of station basis material is to analyze the cost of the material station basis. This thesis deals with variants of whether the material station basis, specifically scaffolding, better to own or rent it. There is evaluated, how many rotations are needed to make the investment back. The thesis analyzes and shows who belongs profit of calculation.
Preparation of realization apartment building in Dvůr Králové nad Labem
Možíš, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
Realization of rough superstructure of residential house in Brno
Vojtek, Ondřej ; Řihák, Pavel (referee) ; Novotný, Michal (advisor)
Bachelor’s thesis deals with technological solution of rough superstructure of apartment building „Rezidence Erasmus“ in Brno, Hrnčířská street. Within this thesis was compiled technical report, technological specification for monolithic reinforced concrete construction, site equipment, mechanical assembly. Thesis deals with quality of making constructions and occupational safety. For chosen technological phase was made item budget, which was foundation for completing time schedule.
Technological stage of implementation of the gross superstructure of the building of family villa in Kroměříž
Osina, Lukáš ; Ing.David Čech (referee) ; Henková, Svatava (advisor)
The article of this bachelor’s thesis is the upper gross production technology of the villa in Kroměříž. Content of this article technological specification, technical reports, site equipment, mechanical assembly design, scheduling, budgeting, monitoring and test plans, safety and environmental protection.
Construction technological project of polyfunktion house in Brno
Kapoun, Pavel ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The diploma thesis deals with the construction technological project of a polyfunctional building in Brno. The project contains schedule, cost estimate, the plan of building site equipment and the proposal for machinery. To be more specific, the work concerns the main building SO01 focusing on the stage of Berlin shoring construction and vertical load-bearing structure. The risk assessment, specialization concerning the sprinkler system and the technology maintenance using reconstruction are also included.
Garage Hroznová, Brno - implementation of slope stabilization and foundation structure
Všetečka, Jan ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
This bachelor’s thesis is focused on the technological implementation phase of realization sheeting structure with the subsequent establishment of the garage building in Brno. The work includes the implementation of technology, design of mechanical assemblies, a solution building site, budget, schedule, checking and test plan, safety and environmental protection during execution relevant construction.
Preparation and realization of the railway viaduct in Ostrov nad Oslavou
Šťastný, Jiří ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This Diploma thesis deals with the preparation of the realization of the railway viaduct in Ostrov nad Oslavou. Realization of major technological stages is addressed in building technological study. Technological processes of each sub-job phases are supplemented by technical regulations, the design of the main building machines and mechanisms, inspection and test plan, schedule of occupational health and safety, time and financial plan construction, construction budget, a plan for securing material resources. I also worked out the technical report of the building sites facilities including drawings needed. I also worked out design rehabilitation of the substructure of the railway viaduct, which is consist of technical regulations for remediation work and drawings.
Realization of rough construction on hall in Brno
Příkazský, Michal ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
The subject of this bachelor’s thesis is the realization of rough construction of hall in Brno. The aim of the construction technological project is the processing of machinery itemized budget, a time plan, a proposal of machine set, inspection and test plan, a proposal of workflow, transport links and site equipment.
Constructional and Technological Project of Laboratoty Pavilion for Technology of AS in Brno
Cihelka, Karel ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The topic of this master thesis is dealing with selected parts of the constructional and technological project of laboratoty pavilion for technology of AS in Brno. Thesis is mainly focused for technological instructions of ground works, support of next building and solving of city center problems. Components of this thesis are evaluation plans and work place safety protocols. Next content of thesis are study of main technological phases, time and finanical plans, items budget, selected details, construction site equipment and design and verification of tower crain.
Construction technological project of sports hall construction
Tkáč, Jiří ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The thesis deals with Komenského Street sports hall construction in Lysá nad Labem. Although partially dealing with construction of all parts, in detail it studies gym construction, focusing on time management, technology and resources of implementation. The thesis is divided into the drawing and text parts. The former includes site facilities design and building situation. The latter consists of the main part construction project implementation study, itemized budget, time schedule, technological regulations, inspection and testing plan for the implementation of the main construction part 1st floor reinforced concrete columns and walls, construction machines and mechanisms design as well as time and financial schedule.

National Repository of Grey Literature : 186 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.