National Repository of Grey Literature 156 records found  beginprevious117 - 126nextend  jump to record: Search took 0.02 seconds. 
Increased production efficiency of hydraulic aggregate unit at Bosch Rexroth company
Fešar, Tomáš ; Kalivoda, Milan (referee) ; Kubík, Roman (advisor)
The target of this masters thesis is perform the analysis of current state of production hydraulic power units and proposion of changes in production, which are able to increasing production.
Identification and assessment of errors in the production line and their prevention
Langer, David ; Vintr, Michal (referee) ; Kotek, Luboš (advisor)
The manufacturing companies are faced to the strong pressure to decrease the production costs. They are therefore forced to optimize the manufacturing processes and to increase their efficiency. The ideal way to increase the productivity is to optimize the manufacture by increasing the efficacy of the equipment, material, working hours and other sources of finding out causes of wasting in production, it means to abolish the causes of making mistakes.
Project of bonnet hinges assembly shop
Chadim, Jakub ; Horák, Jaroslav (referee) ; Rumíšek, Pavel (advisor)
This thesis deals with the technological project of rear bonnet hinges assembly shop, specifically with desing the layout the of assembly shop in the Edscha Automotive Kamenice s.r.o. company. The thesis shows the basic theory to understanding the problems of assembly workshops. The thesis analyses the present state of the assembly workshop and with reference to the requirements of the company and fundamentals technological projection features three possible solutions. The selected solution becomes the shape of rationalization project. In the end is the variant technical-economic reviewed.
Assembly workplace optimizationwith emphasis on ergonomy and loss minimization
Sobotka, Lubomír ; Štangler, Jiří (referee) ; Simeonov, Simeon (advisor)
This diploma thesis describes optimization of assembly working place of cylinder locks brand FAB company ASSA ABLOY Rychnov, s.r.o. Theoretical part deals with universal process for designing manufacturing systems and for description of selected analytical and engineered methods and ergonomics .The practical part shows evaluation of current situation and create new time standards. in accordance with are designed 3 variants of the solution for lay out working place. For each variant is created simulation model, which is explore especially working load and automatic filling machine. The various options are compared by weight valuation and the most optimal is determined by maximal work in process and optimal warehouse supply of input components.
Design of Forming Tool and Machinery for Couting out of Pad
Kolář, Milan ; Štroner, Marek (referee) ; Dvořák, Milan (advisor)
The Diploma Thesis presents a draft of designated automatic apparatus for cutting out and assembling pads for pressure control valve (DRV2). The theoretical chapter of the Thesis contains selected findings from theory and technology for material cutting. The next chapter contains design solutions for a designated apparatus for cutting and assembling pressure control valves. The pads are etched from 0,08 mm steel plates X2CrNi Mol7-12-2. The shape of the pads is etched on a 35mm-wide belt that is wound up onto a drum. The draft of this new technological facility has been elaborated in accordance with the most suitable technological variant. The cutting tool is made of steel 19 437 that is thermally processed at HRC 62-4. Estimated annual volume of production series is 2 mil. pcs. The cutting and assembly processes are executed with the aid of this designated automatic apparatus.
Assemblying effect on cable lines quality
Dočkal, Martin ; Křepelka, Václav (referee) ; Filka, Miloslav (advisor)
In the first part is explained what actually a structured cabling is. Its beginning, from what and why it was created. Its history when at the beginning were applied unbalanced coaxial cables, those were later replaced by balanced cables. In cabling for TVs are still used coaxial cables. Balanced cables are according to type named UTP, STP, FTP, and so on. Whit growing popularity of this type of cabling and its wide spread application was necessary to set some rules, standards, specifications and demands, how to build up the cabling from project to realization. According to these rules is the system built so there are strict rules for length of subsystems and interfaces and the whole appearance of the structure cabling. Next important point is projecting of cabling that is related to the previous points and when it’s finished, we should strictly follow it. With the project is closely connected characteristic of this cabling as attenuations, cross-talks and other transmission parameters which are measured in the practical part. In the second part is spoken about all the parts of which the structured cabling consists - metallic and optical connecting elements and cables. There are also mentioned their mechanical, electrical and transmission features. In the third part is described influence of man on the quality of structured cabling and the most common causes of lower quality and the ways how to prevent this from happening and how to manipulate with cabling not to destroy it. The final (fourth) part considers the measurement. There are measured qualities of metallic wires as the attenuations, delay, cross-talks on the near- and far-end, impedance and resistance. To all the features are mentioned schemes of the measurement on the twisted pairs. The measurement is divided into two parts. In the first part are measured five types of balanced cables of different length, category and damage influencing quality of these cables. In the second part is measured one balanced cable if it’s corresponding with category 5 for that t was made and if it would be possible to use it also for higher category 6. Values are tabularly sorted in tables.
Production of veterinary drugs Tekro - New Dědina - construction and technological project
Karel, Jaroslav ; Čech, David (referee) ; Henková, Svatava (advisor)
The content of this thesis is the construction technology project construction hall for the production of veterinary drugs Tekro in the village Nová Dedina. In this work addresses the project site equipment, scheduling, technical regulations, inspection and test plan, a study of the main technological stages of the building.
Military museum Kraliky - planning of implementation and management of construction
Kucsera, Adam ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
This thesis is aimed at the Military Museum in Kraliky. This construction made on the basis of the initial design of the designer. For this reason, it was necessary to deal with during the processing work some technical problems, transport of materials to the construction site or purely site layout itself. The whole area of the museum consists of several buildings. The largest and main building of the exposition hall with steel supporting structures, then there is the Administration building, which in turn is a brick workshop that has as Exp hall steel structure. There is also a replica of the First Republic Military cottage, which has a wooden frame and demonstration area, where there will be live demonstrations of military equipment.
CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING
Dvořák, Jan ; Bravenec, Roman (referee) ; Mohapl, Martin (advisor)
Master thesis and building technology solutions transshipment point in Prostejov covers technological studies throughout the construction, distribution structures on buildings, machinery equipment, time and financial plan. Furthermore, the thesis further focuses on one main structures of the whole building, object transshipment point. On this construction project is further developed such documentation and other documents that complement and prescribe requirements for faster, easier, safer, better and more technologically correct implementation of this phase.
Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc
Garláthy, Michal ; Novotný, Michal (referee) ; Mohapl, Martin (advisor)
The theme of this diploma thesis are the Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc. The content of this diploma thesis is the technological process of assembly of the building bearing construction of prefabricated concrete elements, the budget, the inspection and the test plan, the issue of safety and health at the construction site, the project concerning the construction site installation, the mechanical assembly, assessment of tower crane, object time and financial plan, construction technology study and the construction timetable.

National Repository of Grey Literature : 156 records found   beginprevious117 - 126nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.