National Repository of Grey Literature 193 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Preparation of the implementation of the gross substructure of the multifunctional building SW - TRADE
Mikeštík, Lukáš ; Vlčková, Jitka Laura (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the planning of the implementation of the rough substructure of the SW-TRADE multifunctional building. The work focuses on the technological regulation for the entire rough substructure, for which an inspection and test plan, a time schedule, and an itemized budget will be created. It also contains the coordination situation of the construction in the context of wider transport relations, the design of machine assemblies, the organizational principles of construction with a drawing of the construction site equipment, and an emphasis on safety and health protection at work. For this phase, details regarding the construction of the white tub and gabion perimeter wall, and the balance of resources, specifically workers, are also worked out.
Building technology study of the revitalization of the Governor's Palace in Brno
Osladil, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The content of the bachelor's thesis is a construction-technology study of the revitalization of the Governor's Palace in Brno. It focuses on the main stage processes of the implementation of the repair of plasters, floors and paved area in the historically protected zone of the city of Brno. In this thesis, the traffic situation is addressed in detail with the design of routes from individual collection points and landfills to construction sites. There is also a technological study of the implementation of the main technological stages. Repairs of plasters in the exterior and interior of the building and all newly designed compositions of floor structures and reinforced surfaces with cutting works as well as making new constellations are dealt with. Based on the design documentation, I have produced a detailed statement of the acreage for all areas and the annex where the areas concerned are indicated. For both stage processes, a time and financial plan is developed using software that is an annex to the work, accompanied by a comment ary in the text section. The basic cockpit of construction traffic is also addressed with a proposal for the distribution of areas and resources for construction. For stage processes, there are 2 technological regulations in which there is a detailed procedure for all compositions and types of processes. In the chapter "Design of machinery assemblies" there is an assessment of the possible deployment of machinery with a focus on both economic and technological advantage. The work also deals in detail with safety measures at the construction site, with an emphasis on possible risks and the design of measures in the implementation of the main stage processes and behaviour at the construction site. In addition, details of the structures, continuities and protection of the monument-worthy structures are processed. This object is very special due to the preserved elements of Baroque architecture, and therefore the design of the solution is directed towards the highest level of preservation and preservation of the monument.
Technological stage of the rough superstructure of an apartment building
Křičenský, Jan ; Strádalová, Aneta (referee) ; Kantová, Radka (advisor)
The aim of this bachelor's thesis was to develop selected parts of a construction technology project focused on the rough superstructure stage of a residential building in the town of Jaroměř. Specifically, the project addresses the execution of all load-bearing structures, which consist of both masonry and monolithic walls and monolithic ceilings. Additionally, it covers the installation of balconies and staircases, which are made as concrete prefabricates. More detailed plans were created for the construction work, including the design and verification of supply routes, a control and testing plan, ensuring work safety, and proposing the necessary machinery for their implementation. The procedure for carrying out the work and the corresponding schedule for the entire construction are also elaborated. The rough construction of the building is addressed from a financial perspective as well, within the framework of an itemized budget for this construction stage. The thesis includes a proposal for the construction site facilities, including the calculation of electricity and water consumption. Finally, the work focuses on the verification of the proposed crane and selected construction technology details.
Technological stage of the rough superstructure of the apartment building Hálkova Brno
Jedlička, Petr ; Nečasová, Barbora (referee) ; Doubek, Rostislav (advisor)
This bachelor's thesis focuses on the rough top construction of an apartment building on Hálkova Street in Brno. The thesis includes a technical report, a situation with broader traffic relations, site facilities, a bill of quantities for the technological stage, technological regulations, inspection and test plans. In addition, occupational health and safety for rough top construction is addressed. The last two chapters include a developed itemized budget for the rough top construction and a comparison of different materials for the vertical structures.
Prevention and risk management of OSH risks
Štěpánková, Barbora ; Balgová, Zuzana (referee) ; Hrabová, Kristýna (advisor)
This diploma thesis primary focus is on the analysis and management of workplace safety and health hazards. Current situation is examined through the perspective od Czech and EU legislation. The standards augmenting legal obligations provide a structured framework for the implementation and maintenance of an effective OHS management system. This research employs particular techniques since it is vital to identify and assess workplace risks and hazards in relation to OHS. The practical section of the thesis puts these methods to use by identifying a variety of work-related hazards using a methodical approach for risk identification and evaluation. For the most critical hazards, measures are proposed to either eliminate or mitigate them.
Plakáty kampaně CHCETE-LI UŠETŘIT, VSAĎTE NA SPRÁVNÉ PŘIDĚLENÍ OOPP
Výzkumný ústav bezpečnosti práce
Někteří zaměstnavatelé však stále kladou ekonomickou stránku firmy na první místo a BOZP berou spíše jako ekonomické břemeno. Často argumentují, že pravděpodobnost vzniku pracovního úrazu nebo poškození zdraví zaměstnance je malá, takže investovat čas a peníze do této oblasti se jim nevyplatí. Přitom však statistiky uvádějí, že měsíčně vznikne jeden smrtelný pracovní úraz pro chybějící, nedostatečné nebo nevhodné OOPP.
Fulltext: Download fulltextPDF; Download fulltextPDF; Download fulltextPDF; Download fulltextPDF; Download fulltextPDF; Download fulltextPDF; Download fulltextPDF; Download fulltextPDF
Technological stage of roofing the winter stadium in Vyškov
Novotná, Nicolette ; Jílek, Jan (referee) ; Diaz, Yvetta (advisor)
The bachelor's thesis deals with the technological process of roofing the ice surface at the winter stadium building in Vyškov. It is a system arch construction. The work contains a technical report focusing on the given stage, budget, technological regulation, construction site equipment, machine design, time schedule and other technical documentation according to the assignment.
Digitální platformy a BOZP
Jana, Ranglová ; Lenka, Scheu
Tato příručka se zaměřuje zejména na vztah platformové práce a zajištění bezpečnosti a ochrany zdraví při práci, popisuje psychosociální zátěž pracovníků a specifická rizika, která jsou s platformovou prací spojena, a to zejména s ohledem na algoritmický způsob řízení práce. Při zpracování autorky vycházely zejména z odborné literatury, dostupných studií a průzkumů na toto téma, právních předpisů, soudních rozhodnutí a koncepčních materiálů evropských a mezinárodních institucí. Na závěr jsou uvedeny jako příklady správné praxe možné preventivní přístupy k řešení problematiky platformové práce, a to ze strany digitálních platforem, státních orgánů a institucí v podobě legislativních a nelegislativních opatření, i samotných platformových pracovníků a jejich zástupců.
Fulltext: Download fulltextPDF
CONSTRUCTION TECHNOLOGY STUDY OF NEW FAMILY HOUSE LEŠTINA.
Drábek, Martin ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The aim of bachelor´s thesis is the construction and technological studies and selected technical prescriptionts for a new house multigenerational family house in Leština at Herálec. Bachelor´s thesis contains technical prescriptionts, and their corresponding control test plans, also includes time and financial plan for stage of coarse substructure, the resolution of wider transport relations, project construction site equipment, catalogue of used machinery, balance the deployment of workers, drawings movements mechanical assemblies, health and safety plan, and the seminar work for the design of wastewater treatment plant.
Assessment of Risk Related to Violations of Labour Safety Regulations in Selected High-Risk Professions and its Prevention
Hoferková, Tereza ; Koláček, Petr (referee) ; Popelová, Barbora (advisor)
This diploma thesis deals with the field of safety and health at work. Based on the Czech Republic, the EU, and Finland´s current state analysis, a questionnaire survey is conducted, followed by methods such as Brainstorming, What if and FMEA to eliminate and manage risks. The thesis aims to propose measures minimizing the risks associated with violation or non-compliance with safety principles in a selected risky profession of stonecutting. At the same time, the thesis provides a financial evaluation of the proposed measures.

National Repository of Grey Literature : 193 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.