National Repository of Grey Literature 104 records found  beginprevious29 - 38nextend  jump to record: Search took 0.01 seconds. 
Implementation of the Shell Superstructure of an Appartment Building "Na Rozálce" Žamberk
Volf, Miroslav ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this bachelor’s thesis is the implemantation of the shell superstructure of an apartment building. Technological projects for vertical structures from Porotherm system and for half-prefabricated clay-concrete floor structures have been designed. The inspection and test plans deal with the quality of these processes. A budget and a time schedule have been drawn up as well, there is also a plan for a set of necessary machines. In addition, the thesis includes a project of site equipment and a review of broader transport relations.
Extension of the building for physical and tactical training in Brno – construction technological project
Štípa, David ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The aim of the master thesis is a technological solution of structure for Police of Czech republic. The main aim of the thesis is the support construction and the ceiling contruction. The thesis also includes a site layout with broader relations to traffic routes, budget for the technological procedure, technical report, technical report for site equipment, technological directive for the construction of ceiling and ground works, Inspection and check plan, time schedule, concept of machinery setup and safety and protection of health during work
Residence Austerlitz, selected parts of construction technology project
Helán, Tomáš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
Purpose of this master’s thesis is to compile structurally – technological aspects of the project of new housing building in Brno. Thesis concentrates on technological phase of upper rough construction, which involves prescriptions for masonry of walls and constructions from reinforced concrete. Thesis is also includes suggestions of constellation of machines, time plan, supplying of construction site, rules of workplace safety, quality requirements, solutions for organization of construction and maintenance of the building. Conclusion of this master’s thesis is comparison of different systematical variations of constructing peripheral wall based on many structurally – technological factors.
Construction and technological project of apartment building in Brno - Slatina
Vojtek, Ondřej ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with construction and technological project of apartment building in Brno – Slatina, Kigginsova street. Thesis focus on technological phase of monolithic rough superstructure and masonry work. For this phases were processed technogical specifications and controlling ad testing schedules. Within this thesis was also compiled technical report, solution of transport roads, technical report and drawings of site equipmet. For main object was compiled itemized budget, which was foundation for completing time schedule. In diploma thesis are further processed safety requirements and chosen construction details.
Preparation for rough superstructure recreational facility in Zlin
Prágr, Michal ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The subject of my bachelor thesis is construction technological solution of the rough upper construction realization of the recreational resort. Bachelor thesis includes technological regulation for masonry and layout of ceiling Spiroll panels, next is the project of the machine set, the inspecting and testing plans, BOZP, the budget and the time table of the whole phase. I also worked out the technical report of the building site facilities including drawings needed.
Preparation and organization of the construction of residential houses in Chrudim Lookout
Kohout, Jiří ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The content of the diploma thesis is a building-technological project of the new building of residential buildings Rozhledna in Chrudim. The thesis contains technological regulations for a rough bottom structure and a rough top structure. Technological regulations are complemented by design of machine assembly, site facilities and control and test plans. Work safety, construction risk assessment, time schedule of main objects, object time and financial plan and budget of main buildings are also solved. An important part is the comparison of the parallel, gradual, current construction and the design of the thermal insulation system of the curtain wall.
Special basic school and Practical school with orphanage in Zlin - structural technological project
Hrdlička, Michal ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
This diploma thesis deals selected parts of a structural technological project for new building Basic school and Practical school with orphanage in Zlín. It contains studies of main technological steps, chronological plan, calculation, project of site equipment, technological prescription for concrete roof, suggestion construction machinery and another selected parts. This new brick building includes 3 floors with basement and is located in a separate educational area. Basic monolithic concrete constructions with steels are realizated as a surface structures.
Technological stage of the rough superstructure of a residential building in Pohořelice
Hanzl, Martin ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The aim of this bachelor‘s thesis is to process the technological stages of the execution of masonry and floor structures of the rough superstructure of a residential building in Pohořelice. It’s a newly-built four-storey building labelled B3 and it’s one of the ten residential buildings in the complex Rezidence Malý Vinohrad, located in the western part of Pohořelice town. This thesis includes a technical report of the building that focuses on the technological stage of the rough superstructure, drawing up of the construction methods used for the execution of masonry and floor structures, the time schedule and the quality control and test plans. The thesis also contains the design of construction machinery including the selection of the lifting machinery and the technical report of the building site equipment. The report includes technical drawings and item budget with a bill of quantities. It also deals with the occupational safety and health regulations and thermal bridges of the balcony constructions.
TITANIUM - Technology coarse upper stage of construction
Ševčík, Jan ; Mesiarkin, Jan (referee) ; Henková, Svatava (advisor)
The subject of this thesis is the solution of reinforced concrete upper portion of gross building a particular proposal technological process for the realization of the supporting structure of the building. In the technological regulations will be prepared draft reports formwork, describes the individual work procedures and construction. The work also includes a proposal building equipment, machinery, develop a timetable, location, building relationships with the wider transport routes, quality requirements and ensuring safety and the proposed measure. Like other entry will be processed technological specification for masonry rough upper structure solved object.
Mixed-use Building in Beroun - Execution of Superstructure
Kurková, Dita ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The bachelor thesis deals with the processing of three technological stages of the headquarters of the polyfunctional building in Beroun. The building is designed for housing and civic amenities. There is a café and two business units. It is a partly basement building with one underground and three above-ground floors. The main supporting construction of the building is a monolithic skeleton reinforced with wall and core reinforcement.The perimeter casing is made of brick blocks Porotherm. The subject of the processed technological stages is the solution of monolithic reinforced concrete vertical supporting structures in 1st floor, monolithic reinforced concrete ceiling over 1st floor and perimeter filler masonry in 1st floor. In the framework of other assignments are processed formwork drawings for solved monolithic reinforced concrete structures.

National Repository of Grey Literature : 104 records found   beginprevious29 - 38nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.