Project
Malý, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
|
| |
| |
|
Campus MU Brno (green stage) - construction technological project
Honzík, Roman ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
|
|
Preparation for the construction of an apartment building in Brno - Slatina
Těžký, Filip ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the building - technological project of the apartment house in Brno - Slatina, Lučiny. The purpose will be an optimal design of construction progress with regard to finance and time. For this phase were processed the site equipment with the design of the lifting strap, the transport routes and the machine assembly. In addition, an item budget, which was followed by a detailed schedule. Based on these documents was created a balance of machines and workers. For monolithic constructions were developed a technological regulation and a control and test plan. Furthermore, the calculation of the decanting time and the design of the formwork turnover, supplemented by its drawing. In the diploma thesis is elaborated a plan for safety and health protection in the workplace and selected design details.
|
|
Sports complex - construction and technological preparation
Petruška, Tomáš ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The diploma thesis solves the construction technology project of sports complex. The aim of the thesis is rational proposal of construction and resources. The thesis contains plant building site, technological instruction, budget, time schedule, control and trial plan, design and assessment of lifting mechanism and machinery used over construction, contract for work and safety report. Part of the thesis is specialization in sports surfaces.
|
|
Project planning and management of construction of the bridge on the road II / 377
Soukup, Ondřej ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The subject of this thesis the construction and technological preparation for the construction of the bridge ev.č. 377-007 across the Býkovka river in the municipality Rájec - Jestřebí, which is part of the reconstruction of a main road II / 377 Bořitov - Rájec. The thesis is elaborated a technical report on the structural and technological project, coordinating construction situation, the situation with wider relationships routes following the stages, time and financial plan – by objects, study the implementation of major technological stages of the building SO203 project site equipment, design of the main construction machines and mechanisms, the timetable of the main building structure, workers deployment plan, plan of machines usage, a plan for securing material resources for SO 203, technological regulation for the implementation of bored piles of, inspection and test plan for pilots, budget SO 203, sequence diagram construction, control and monitoring plan and calculation of bearing capacity of the bridge foundation piles.
|
|
Construction technological project of administration building Gaceta in Prague
Jekielek, Marek ; Pražáková, Jana (referee) ; Diaz, Yvetta (advisor)
The objective of this thesis is the technological project of the structural construction of administrative building. It includes technological standards for reinforced concrete ceiling and for face layer of ventilated facade, the project of site construction, detailed structural, financial and time schedules of building object, controlling plans and test plans of the reinforced concrete skeleton and for face layer of ventilated facade from face brick, plan of main mechanical assemblies and costing of budget for structural.
|
| |
|
Realization of rough upper construction of a residential building in the Tatranská Lomnice
Šifrová, Sláva ; Štěrba, Martin (referee) ; Novotný, Michal (advisor)
The object of this work is to address the technological stages gross surface works focusing on vertical structures masonry apartment building in the Tatranska Lomnica. The work is handled by the technical design of the building management, technological prescription bricklaying, compare several variants of material, design of machine assembly, situation constructions, technical management equipment, inspection and test plan, job security, time and financial plans.
|