National Repository of Grey Literature 10 records found  Search took 0.01 seconds. 
Preparation realization multipurpose building Brno - Klíčova
Sviták, Roman ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
The bridge construction in Droužkovice - project planning and management
Stloukal, Radim ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The subject of this thesis is technological projet of a bridge construction over R7 in the municipality Droužkovice. The presstressed superstructure is 63,20m long. As a part of this thesis is enclosed the technological report, site equipment, financial and time schedule of the main construction object, technological prescription of superstructure, the control and test plan, technological regulations.
Constructive-technological project of building polyfunktion house locality Nova Nitra
Malý, Filip ; Ing.Lumír Kliš (referee) ; Diaz, Yvetta (advisor)
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construction of all buildings. The second category can include no specific calculation and optimization outputs such as itemized budget polyfunctional house SO-07.03, drawing of the site including all buildings proposed site and their economic evaluation, sizing of utilities for supplying water and electricity construction site, design of building machines and mechanisms including determining the time of deployment, technological regulation for the implementation of monolithic roof structure, including financial balance sheets prepared by the deployment of slab formwork. The last category included in the thesis are legislative requirements that must be observed and kept in the course of the construction plan is constructed as a safety and health at work, including security risks drawn up, inspection and testing schedule for monolithic construction and a list of environmental risks that may arise during implementation.
Construction technology project of construction boarding house for seniors
Karafiátová, Hana ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The purpose of the final thesis is to elaborate selected parts of a technology building project of the Pension for the elderly. The complex includes eleven building objects and the main one is developed in detail. The final thesis includes a technical report about the technology building project, a building schedule, suggestion for realization of the main stages of its construction, a design of mechanical assembly. The final thesis also includes the project of site equipment, technological regulations , an inspection and test plan, an occupational safety and health plan.
The Havlíčkova Terraces Apartment Building - Selected Parts of the Construction and Technological Project
Krejčí, Vlastimil ; Horňák, Michal (referee) ; Vlčková, Jitka Laura (advisor)
Architectural and technological project of building the housing Terraces Havlickova contains technical report on construction technology project,coordination situation, building relationships with the wider transport routes, time and financial plan of the building object, study the implementation of major technological stages of a residential building,Project construction site, design of the main building machines,schedule of the main building construction object SO-01,plan for securing material resources for the construction of residential house,technological regulation for the implementation of excavations and roofs,inspection and test plan for the implementation of the excavations and roofs. The other award was prepared itemized budget apartment house SO-01, calculation of construction according to THU, health and safety plan and Listing of security risks and security measures on site
The bridge construction in Droužkovice - project planning and management
Stloukal, Radim ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The subject of this thesis is technological projet of a bridge construction over R7 in the municipality Droužkovice. The presstressed superstructure is 63,20m long. As a part of this thesis is enclosed the technological report, site equipment, financial and time schedule of the main construction object, technological prescription of superstructure, the control and test plan, technological regulations.
Preparation realization multipurpose building Brno - Klíčova
Sviták, Roman ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
Construction technology project of construction boarding house for seniors
Karafiátová, Hana ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The purpose of the final thesis is to elaborate selected parts of a technology building project of the Pension for the elderly. The complex includes eleven building objects and the main one is developed in detail. The final thesis includes a technical report about the technology building project, a building schedule, suggestion for realization of the main stages of its construction, a design of mechanical assembly. The final thesis also includes the project of site equipment, technological regulations , an inspection and test plan, an occupational safety and health plan.
The Havlíčkova Terraces Apartment Building - Selected Parts of the Construction and Technological Project
Krejčí, Vlastimil ; Horňák, Michal (referee) ; Vlčková, Jitka Laura (advisor)
Architectural and technological project of building the housing Terraces Havlickova contains technical report on construction technology project,coordination situation, building relationships with the wider transport routes, time and financial plan of the building object, study the implementation of major technological stages of a residential building,Project construction site, design of the main building machines,schedule of the main building construction object SO-01,plan for securing material resources for the construction of residential house,technological regulation for the implementation of excavations and roofs,inspection and test plan for the implementation of the excavations and roofs. The other award was prepared itemized budget apartment house SO-01, calculation of construction according to THU, health and safety plan and Listing of security risks and security measures on site
Constructive-technological project of building polyfunktion house locality Nova Nitra
Malý, Filip ; Ing.Lumír Kliš (referee) ; Diaz, Yvetta (advisor)
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construction of all buildings. The second category can include no specific calculation and optimization outputs such as itemized budget polyfunctional house SO-07.03, drawing of the site including all buildings proposed site and their economic evaluation, sizing of utilities for supplying water and electricity construction site, design of building machines and mechanisms including determining the time of deployment, technological regulation for the implementation of monolithic roof structure, including financial balance sheets prepared by the deployment of slab formwork. The last category included in the thesis are legislative requirements that must be observed and kept in the course of the construction plan is constructed as a safety and health at work, including security risks drawn up, inspection and testing schedule for monolithic construction and a list of environmental risks that may arise during implementation.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.