Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
Selected parts of the Construction-technology Project of a Factory Building with an Administration Building in Hustopeče
Zálešák, Vít ; Klempa, Lukáš (referee) ; Motyčka, Vít (advisor)
The diploma thesis is engaged of selected parts of the construction-technology project of a factory building with an administration building in Hustopeče. The construction-technology project contains technical account construction of technological solutions, project of temporary works designed to perform construction, time and financial plan and detailed time plan for rough construction, includes inspection and test plan and technological standard for solution of lower structures of solutions object. In another input is made technological study of the chief technological stage and budget for rough lower structures. As specialization is solution fire safety of buildings.
Preparation for Building Realisation and Building Management
Hlinšťák, Filip ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The master’s thesis is planning selected parts of preparation and realization of the extension of production hall with warehouses in Petrovice u Karviné. The thesis contains technical reports, solution of wider traffic relations, study of main technological stages, design of building site, design of construction machinery, the technology solutions for installation of roofing including HSF and CTP, design of anchors for roofing, time and financial planning of construction.
Set of residential buildings in SM6, Staré Město - Project planning implementation of construction
Běťák, Rostislav ; Novotný, Michal (referee) ; Šlanhof, Jiří (advisor)
The master thesis with the name Set of residential buildings in SM6, Staré Město - Project planning implementation of construction solves preparation and realization of building. The aim of master thesis is to design of time, financial, material and human resources. The thesis contains calculation, time schedule, building-site, technologicals standards, controls and trials plans, design of mechanism, study of realization of the main stages. The thesis is prepared on the basis of project documents provided by the investor with the approval of the design office.
Preparation and Organization of Selected Construction
Poledníková, Hana ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The subject of the thesis is the development of a construction technology project for the new construction of the Dukelská administrative building in the city of Brno. It is a four storey, non-basement building covered with a single-skinned surface. The content of this work is a technical report, the coordination situation of the building with wider relations of transport routes, a time and financial plan - object plan, a study of the building construction object and its main technological stages, project equipment of the workplace for three stages of construction together with the calculation of costs for construction site equipment, the proposal of the main construction machines, time schedule, plan to ensure material resources for rough construction, technological prescription for monolithic ceiling constructions together with ceiling formwork drawing, quality control and testing plan and health and safety plan. The work also includes construction calculations according to THU, the budget of the closed construction SO 01 and the economic evaluation of the use of the crane.
Kindergarten Kuřim - construction technology project
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
Preparation for Building Realisation and Building Management
Hlinšťák, Filip ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The master’s thesis is planning selected parts of preparation and realization of the extension of production hall with warehouses in Petrovice u Karviné. The thesis contains technical reports, solution of wider traffic relations, study of main technological stages, design of building site, design of construction machinery, the technology solutions for installation of roofing including HSF and CTP, design of anchors for roofing, time and financial planning of construction.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.
Koláček, Ivo ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.