National Repository of Grey Literature 174 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Pipe materials
Pecl, Tomáš ; Helcelet, Marek (referee) ; Molliková, Eva (advisor)
Objective of the bachelor thesis is to introduce the important aspects of the material for the manufacture, installation and operation of pipeline systems. The thesis mentions the suitability of individual groups of pipe materials for various technological and natural conditions with respect to the material properties. The work deals with the pipe installation, implementation of control tests with a focus on of technology pipe installation before commissioning, finding defects and the possibility of repair. Finally, in the work are placed practical information that helping solve problems
Price of pipeline on various parameters of construction work
Sofka, Filip ; Pobuda, Štefan (referee) ; Aigel, Petr (advisor)
Bachelor’s thesis deals with price of utilities in dependency on characteristics of carried work flows. Theoretical part is based on price calculation, budget ,utilities and water supply problematics. In practical part is defined alternative option of watter supply construction, with realistic example.
Strength design of pipe
Jahodová, Miroslava ; Buzík, Jiří (referee) ; Horsák, Libor (advisor)
The subject of this thesis is strength design of pipe connecting furnace of continuous catalytic reforming with reactor. First is realize analytical design of individual parts according to ASME VIII, ČSN EN 12952-3 a ČSN EN 13480-3. It is also design and optimize supporting pipe using Caesar II. At the end of work is creating isometric documentation.
Heating of the kindergarten
Dužík, Vojtěch ; Horák, Petr (referee) ; Počinková, Marcela (advisor)
This thesis concerns the heating of the kindergarten. The heating system is designed as low-temperature with the main source of heat which is heat pump of a special type air-water in inner design. Heat pump is completed with parallel bivalent source, which is an electric heating element. There are designed panel radiators in whole edifice. Hot water is being prepared by DHW cylinder. The heating of hot water is being provided by thermal pump in combination with electric DHW cylinder. The exchange of air in the whole of edifice is provided by a system of forced ventilation with heat recovery. In theoretical part I focus on heat pumps.
Heating and hot water preparation of recreation center
Hakl, Jaroslav ; Horká, Lucie (referee) ; Počinková, Marcela (advisor)
Content of this bachelor thesis is heating and hot water preparation of recreation centre in the village Ostužná, district Jeseník. Object have 2 above-ground floors. Ground floor is mainly used to meet people in play room or in common room. First floor is situated six accommodation units with private bathroom and toilet. Technical facilities are situated in ground floor and is consists of boiler room and the adjacent fuel storage. For heating is primary used grasifying boiler. Secondary source for hot water preparation is solar systém, that is supplemented by an electric heater in the absence of sunshine. Heating systém is in horizontal double-pipe version with distributor and collector in each floor. The Individual branches on the distributor and collector connected are sections of a single accommodation unit, that can be individually regulated. Radiators are designed as boards in the VK design.
Dedusting of cooling conveyor for agglomaration( Conveyor output 130t/h)
Hanzlík, Václav ; Fiedler, Jan (referee) ; Skála, Zdeněk (advisor)
The main aim of this thesis is to propose a suitable dusting cooling conveyor technology for agglomeration South in Ostrava. The first part deals with the actual sinter production and its influence on air. It further describes the most commonly used separation device in agglomerations. In the second part of this thesis there is designed a scheme of piping line for suction air and there is also described the choice of abatement equipment and associated equipment. The work includes also drawing plans of the proposed solution.
The Design of the Plumbing Systems in the Hotel
Klučáková, Tereza ; Vendlová, Lucie (referee) ; Wierzbická, Helena (advisor)
The bachelor thesis`s topic is The design of the plumbing systems in the hotel. The theoretical part deals with grease separators and separators of light liquid, their functions and their designs. Calculation of proposal solves sewerage system and water system. Project contains technical drawings and technical report.
Boiler-room apartment house
Lampa, Jan ; Vrána, Jakub (referee) ; Vališ, Ivan (advisor)
The introduction of the theoretical part of the thesis deals with condensing boilers. There is a description of the parts of boilers, gas combustion methods, the amount of combustion air and the overall running of condensing gas boilers. Other parts of the paper describe radiators, thermostatic valves, safety relief systems, piping and circulating pumps. The design section provides an illustrative example of the design of the heating system for a residential building with 12 apartments.
Heating of housing complex
Molnár, Lukáš ; Počinková, Marcela (referee) ; Topič, Jan (advisor)
The aim of the diploma thesis is to design heating and hot water preparation in a complex of buildings consisting of retail space and two residential buildings. Retail space is heated using VRF system and apartment blocks are heated by gas boilers located in the mechanical room in the basement. Gas boilers are connected to heating system and storage water he-ater. The heating surface is created by tabular and tubular heating units. Heat consumption in apartments is measured by calorimeters with remote data collection system. The temperatu-re in each flat is controlled by an electrically powered zone valve.
The efficiency of heat distribution
Vích, Pavel ; Horák, Petr (referee) ; Počinková, Marcela (advisor)
This diploma thesis focuses on the analysis of heat loss of heating distribution in the industrial area. The aim of this labor is to determine heat loss heat distribution kept in non manholed canal and evaluate economic return to build a local source of heat for the office building. For this building is in two variants resolve the reconstruction of the existing heating system. For the first variant is designed the local gas condensing boiler and for second variant existing central heat source. The experimental part of this labor compares the measured and calculated values of boundary conditions of hot-water pipes kept in non manholed canal.

National Repository of Grey Literature : 174 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.