National Repository of Grey Literature 11 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Pedestrian Footbridge across River
Sotáková, Miroslava ; Balázs, Ivan (referee) ; Brosch, Petr (advisor)
The purpose of this thesis is the design of a load-bearing steel structure of a pedestrian footbridge across the river Opava. Two variants were taken into consideration - steel tied-arc footbridge and truss footbridge. Tied-arc variant with orthotropic deck was found the most suitable for detailed proposal. The span of the footbridge is 65,00 m and height of the structure is 7 m.
Influence Selecting the Type of the Bridge Structure at km 332,420 of Railway Dětmarovice-Český Těšín by the Effects of Undermining
Chaloupka, Martin ; Puchner,, Josef (referee) ; Kmošek, David (advisor)
The aim of the master’s thesis was t odevelop alternative solutions supporting steel structure of the railway bridge on the undermined area. The range of single fields were chosen based on the location of existing substructures. Reducing the width of bridge openings were not allowed. Based on the geodetic survey plans were drawn up clear of the current state. On the basis of specifications for developing a detailed process was chosen variant Gerber’s beam reinforced with an arch in mean field. For this variant was performed structural analysis of the main parts of the main structure of the bridge, which was calculated with the effects of undermining. For variant Gerber’s beam were made clear drawings and drawing details of the selected steel bridge construction (new state). Further, detailed analysis of selected structural detail was made. Specifically, connecting rod to the main beam, which was designed optimal shape and thickness of the joints plate with a suitable radius of the firing to avoid plastification of the material in this area. Variant of the continuous beam without joints was prepared to. It has been observed, what is the effect of undermining on the stress in the construction of the bridge - was confronted with the effects on Gerber’s beam. To reduce stress in the construction of the bridge and compliance of ultimate state of applicability of the main beam has been designed bearing adjustment and after considering several options its implementation too. The economic comparison between the two variants was conducted. The assembling procedure was designed for both types of bridge structures. In the technical report we can read about due to the intention of building a new bridge and further we can find there other important technical information. In conclusion of the master’s thesis there has been recommended for the construction specific variant – from the perspective of an investor, and from the static aspect-view of the designer.
Road bridge on road III/0462 over highway D46
Vystavěl, Vojtěch ; Balázs, Ivan (referee) ; Pešek, Ondřej (advisor)
This thesis deals with design of III/0462 road overpass over D46 highway near Brodek u Prostějova. There are 2 preliminary variants. First variant is a right bridge, whose main beams are tied archs. Second variant is a skew bridge with truss superstructure. In case of second variant there are three subvariants differing with truss design. Design and calculation is done according to valid standarts and other regulations for designing bridges.
The footbridge for pedestrians and cyclists
Pupík, Antonín ; Sýkora, Karel (referee) ; Puchner, Josef (advisor)
This thesis deals with the design and assessment of footbridge for pedestrians and cyclists in the city of Hranice, Rybare district. The footbridge will serve as a crossing point over the river Bečva and will conect cycling trail with the street Rybarska. The content of this paper is to propose two different variants of structures. One of these options is selected based on their economic evaluation and further processed. Length of the bridge is 50m.
Footbridge in Nova Karolina in Ostrava
Havelka, Jiří ; Nečesal, Petr (referee) ; Marván, David (advisor)
The topic of the master’s thesis is a design of steel structure of footbridge. Footbridge goes across the roadways and railway. It is a design of a new structure in Nová Karolina in Ostrava. Span of footbridge is 200m. The footbridge’s superstructure is two steel arches angled toward each other and fixed to the foundation blocks. The supporting beam of the bridge deck is connected to the arch by tie-rods. The deck beam is a welded box section. The tie-rods are arranged to the V-shaped system. Deck of footpath is semi through type and orthotropic. The arches are connected at the top by lateral bracing. Lateral bracing is Saint Andrew's Cross type system.
Road bridge on road III/0462 over highway D46
Vystavěl, Vojtěch ; Balázs, Ivan (referee) ; Pešek, Ondřej (advisor)
This thesis deals with design of III/0462 road overpass over D46 highway near Brodek u Prostějova. There are 2 preliminary variants. First variant is a right bridge, whose main beams are tied archs. Second variant is a skew bridge with truss superstructure. In case of second variant there are three subvariants differing with truss design. Design and calculation is done according to valid standarts and other regulations for designing bridges.
Pedestrian Footbridge across River
Sotáková, Miroslava ; Balázs, Ivan (referee) ; Brosch, Petr (advisor)
The purpose of this thesis is the design of a load-bearing steel structure of a pedestrian footbridge across the river Opava. Two variants were taken into consideration - steel tied-arc footbridge and truss footbridge. Tied-arc variant with orthotropic deck was found the most suitable for detailed proposal. The span of the footbridge is 65,00 m and height of the structure is 7 m.
The footbridge for pedestrians and cyclists
Pupík, Antonín ; Sýkora, Karel (referee) ; Puchner, Josef (advisor)
This thesis deals with the design and assessment of footbridge for pedestrians and cyclists in the city of Hranice, Rybare district. The footbridge will serve as a crossing point over the river Bečva and will conect cycling trail with the street Rybarska. The content of this paper is to propose two different variants of structures. One of these options is selected based on their economic evaluation and further processed. Length of the bridge is 50m.
Influence Selecting the Type of the Bridge Structure at km 332,420 of Railway Dětmarovice-Český Těšín by the Effects of Undermining
Chaloupka, Martin ; Puchner,, Josef (referee) ; Kmošek, David (advisor)
The aim of the master’s thesis was t odevelop alternative solutions supporting steel structure of the railway bridge on the undermined area. The range of single fields were chosen based on the location of existing substructures. Reducing the width of bridge openings were not allowed. Based on the geodetic survey plans were drawn up clear of the current state. On the basis of specifications for developing a detailed process was chosen variant Gerber’s beam reinforced with an arch in mean field. For this variant was performed structural analysis of the main parts of the main structure of the bridge, which was calculated with the effects of undermining. For variant Gerber’s beam were made clear drawings and drawing details of the selected steel bridge construction (new state). Further, detailed analysis of selected structural detail was made. Specifically, connecting rod to the main beam, which was designed optimal shape and thickness of the joints plate with a suitable radius of the firing to avoid plastification of the material in this area. Variant of the continuous beam without joints was prepared to. It has been observed, what is the effect of undermining on the stress in the construction of the bridge - was confronted with the effects on Gerber’s beam. To reduce stress in the construction of the bridge and compliance of ultimate state of applicability of the main beam has been designed bearing adjustment and after considering several options its implementation too. The economic comparison between the two variants was conducted. The assembling procedure was designed for both types of bridge structures. In the technical report we can read about due to the intention of building a new bridge and further we can find there other important technical information. In conclusion of the master’s thesis there has been recommended for the construction specific variant – from the perspective of an investor, and from the static aspect-view of the designer.
Footbridge in Nova Karolina in Ostrava
Havelka, Jiří ; Nečesal, Petr (referee) ; Marván, David (advisor)
The topic of the master’s thesis is a design of steel structure of footbridge. Footbridge goes across the roadways and railway. It is a design of a new structure in Nová Karolina in Ostrava. Span of footbridge is 200m. The footbridge’s superstructure is two steel arches angled toward each other and fixed to the foundation blocks. The supporting beam of the bridge deck is connected to the arch by tie-rods. The deck beam is a welded box section. The tie-rods are arranged to the V-shaped system. Deck of footpath is semi through type and orthotropic. The arches are connected at the top by lateral bracing. Lateral bracing is Saint Andrew's Cross type system.

National Repository of Grey Literature : 11 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.