National Repository of Grey Literature 34 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Digitization of the order process in the company
Kadlčíková, Daniela ; Straková, Kateřina (referee) ; Juřica, Pavel (advisor)
The diploma thesis focuses on the description and mapping of the processes of the selected company with the goal of digitizing the order process in the selected company. Based on the findings from the analytical part and after defining the requirements, a system is proposed in the design part, which should help to increase the clarity and effective evaluation of orders and eliminate emerging errors in the process.
Material management of order production
Jílková, Lenka ; Kruželák,, Lukáš (referee) ; Juřica, Pavel (advisor)
The thesis is focused on the mapping and subsequent improvement of processes within the Procurement and Logistics department for the monitored company division. Based on the findings from the analytical part and the identification of problematical areas, there are proposed steps that should lead to improvement of performance not only within the Procurement and Logistics department, but also within the division as a whole. The emphasis was put on eliminating of processes that were bringing no value as well as on material flow management.
Value stream analysis and improvement
Malec, Tomáš ; Hégr, Ondřej (referee) ; Novotný, Radovan (advisor)
This thesis deals with the general analysis and value stream improvement. The theoretical part describes the difference between functional and procedural model of company management, mutual benefits and disadvantages of these systems. The thesis deals with the mapping process, subdivision maps and methodology of process maps creation. The work also includes software analysis for process mapping. Next section contains search of selected optimization tools and methods to improve production flow and description of the principles of controlled documentation. In the practical part is realized mapping process of bachelor studies at FEKT and map of production process at ABB switchgear.
Implementation of the Quality Management System for Project Metro London in OTIS a.s.
Bernát, Michal ; Ing. et Ing. Radek Dryšl, MSc., MBA (referee) ; Doskočil, Radek (advisor)
This thesis deals with the implementation of quality management system in the project of Metro of London, implemented by Otis a.s. The theoretical part describes quality management tools. In the analytical part, there are mapped processes of project of Metro of London and identified problems and opportunities for improvement of processes of this project. Based on this analysis of outputs, there are designed corrective moves and their evaluation for defined problems.
Optimizing Processes in the Assembly Shop
Bernát, Michal ; Kadlček, Ludvík (referee) ; Videcká, Zdeňka (advisor)
This thesis deals with the analysis and optimizing processes in the assembly shop in the company Alcaplast s.r.o. The theoretical part describes the methods of process analysis, modeling of processes and methods of their optimization. In the analytical part of the business processes are mapped on the example of the company and model contracts are defined by the bottleneck process. Based on detailed analysis of the outputs are designed to address bottlenecks and process evaluation.
Production process optimization
Pappová, Barbora ; Koška, Petr (referee) ; Fiala, Alois (advisor)
This master’s thesis deals with the current condition of management quality system analyses in the organization of "Brněnská Drutěva", industrial cooperative in a box-making plant. Certification according to the norm ČSN EN ISO 9001:2009 has just been extended into this plant. For these purposes it was required to do an input analyses, as well as to identify and survey processes in the plant. Upon the ascertainment some recommendations for processes and management quality system optimization have been specified. These recommendations should function as instructions for the management quality system and production optimization to be improved and the efficiency to be increased.
QMS for industrial company
Kopecký, Lukáš ; Kotek, Luboš (referee) ; Fiala, Alois (advisor)
The subject of this master´s thesis is the improvement of a quality management system in selected industrial company using the DMAIC methodology. For this purpose, current status of quality management system was analysed and compared with requirements of the ČSN EN ISO 9001 standard. Based on determined shortcomings, corrective measures were proposed. The measures related to process management and risk analysis were performed within the pactical part of this thesis.
Termoplast injection process analysis
Stehlíček, Marian ; Koška, Petr (referee) ; Fiala, Alois (advisor)
This thesis analyses the termoplast injection process. The goal is to map the manufacturing process of thermoplastic injection used products for the building industry. All this starting on the input material up to the shipment. The further task is to identify critical points of the manufacturing process and propose steps leading to its´ stabilization. This analysis was accomplished in the Nevoga corporation Znojmo.
QMS in small organization
Filla, Michal ; Krásová, Anna (referee) ; Fiala, Alois (advisor)
This Diploma thesis is engaged in implementation of quality management system in a small organization. In this thesis is closely described quality management system, its advantages and rules. There was made an entry analysis and documentation was checked and completed.
Quality management system for small organization
Urban, Jan ; Krásová, Anna (referee) ; Fiala, Alois (advisor)
This diploma thesis deals with a quality management system of a small construction company. The aim is to analyse the existing baseline system and propose specific measures leading to compliance with the ČSN EN ISO 9001:2009 standard specification. The first three chapters focus on general description and concepts of quality management systems. The next chapter identifies and maps the main processes in the studied construction company and proposes a new quality management system. The last chapter presents general guidelines for creation of management documentation.

National Repository of Grey Literature : 34 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.