National Repository of Grey Literature 116 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
The implementation phase of gross upper structure of a department store
Jahodová, Martina ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
This bachelor’s thesis comprises realization of a technical construction phase of the upper department store in Valašské Meziříčí. Thesis contents of a technological procedure of installing a load-bearing construction and roofing of the building, a construction site technical report, a concept of mechanical assemblies, an inspection and test plan, a statement of measures, a bill of quantities, a timetable, an occupational safety and environmental protection.
The gross superstructure of the apartment building
Hoferek, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
This bachelor’s work deals with the realization of the rough upper construction of the appartment block. The aim was to elaborate the technological regulations, to specify the mechanization for the set technological phase, the occupational safety, the quality of the implementation and the total duration of the phase of the rough upper construction with respect to the economic point of view. The basis for the development of the project was the partial implementing documentation of the building.
CONSTRUCTION OF A DEPARTMENT STORE IN MLADÁ BOLESAV - SOLUTION OF GROSS SUBSTRUCTURE
Škopík, Michal ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This bachelor's thesis deals with solution of gross substructure a department store in Mladá Boleslav. In this thesis is solved a technological specification for implementation of earthworks and implementation of foundations and vertical supporting constructions of gross substructure. More specifically deals with traffic situation around building, time schedule of works, proposal of machine assemblies, ensuring qualitative requirements, safety at work and budget. This thesis is very interesting about solution of construction organization, because this construction is in the middle of housing estate. The basis for this thesis was a drawing documentation for realization of this construction.
Preparation for rough superstructure of residential building Jižní svahy
Gajdoš, Nikola ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The main construction work is subject to technological solution vertical and horizontal constructions of residential building Jižní svahy. Bachelor´s thesis solves construction progress itself, used technologies and ensuring required conditions for safe and stepless constructing. The basis for the development of the project was the partial implementing documentation of the building.
Production Hall in Otrokovice - Execution of Superstructure
Ševela, Ondřej ; Novotný, Michal (referee) ; Nečasová, Barbora (advisor)
The bachelor thesis deals with the solution of the technological stage of the rough superstructure of a production hall in Otrokovice. The work includes accompanying and summary technical reports, construction situation with wider transport route relationships, technical report of the closer transport relations and the coordination of the oversized transport, bill of quantities for the tackled technological phase, technological regulation for the assembly of the prefabricated skeleton, design of the mechanical assembly, control and testing plan for the tackled technological phase, work safety of the tackled technological phase, prefabricated skeleton assembly budget, and building schematics of the details, assembly and storage of prefabricated elements.
Multifunctional building in Staré Ransko, interiour and finishing works
Kudiovský, Filip ; Dvořák, Miloslav (referee) ; Šlanhof, Jiří (advisor)
The subject of the Bachelor thesis is the solution of technological phase of interior and finishing works in the multifunctional object in Staré Ransko. The thesis is concentrated on the implementation of the floor structures. At first from the implementing hydro insulation to the stepping plies, which are created by vinyl and pavement. The building will serve for accommodation (four flats 2+1) and for training of company employees. The thesis deals with the technical report of selected building, the situation of transport links, the item budget with a bill of quantities, the technological specification for floor construction, the solution of organization of construction, the construction site, the time schedule, the proposal of the mechanical assembly, the quality solution, the occupation safety and the comparison of the two sort of flooring.
Determined and Specification of Auxiliary Work in Construction Supplies and Work
Levstek (Bradáčová), Šárka ; Kosová, Jaroslava (referee) ; Šmahel, Milan (advisor)
The thesis deals with extra work and unrealized work that originate at construction projects and further on during realizing the construction, both at new constructions, and at reconstructions and other construction activities. It mainly focuses on their origination and optimizing their amount in individual construction phases, from preparing the project through entering into an agreement with the supplier, to carrying out the project itself. The theoretical part outlines used basic concepts according to valid laws and regulations, and introduces individual construction phases including defining extra work and unrealized work. The practical part shows a real-world example of the negative influence of such work on the investor-supplier relationships and the analysis of failures by individual participants. The result of the thesis is processing a suggestion for reducing the frequent failures caused by the extra work and unrealized work, and a consistent evidence for better argumentation and invoicing between the investor and the supplier. The main aim is to prevent conflicts between the parties that arise because of admitting the extra work and unrealized work.
Implementation of the roofing phase of a residential building in Nové Sady
Balko, Dávid ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The bachelor thesis deals with realization of a roofing construction of a apartment block in Nové Sady. This thesis deals with the version of a warm flat roof. For the given version is handled the consideration of transportation itinerary, itemized budget with bill of quantities, technological prescription, technological documentation of building site equipment, time schedule, machine assembly, control and test plan, safety and health precautions, the cost comparison of flat roof area, drawing of flat roof.
Production hall MONTGAS - realization of the gross substructure
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the gross substructure of the new production hall of the company MONTGAS a.s. in Hodonín on the street U Kyjovky. Part of this technological phase is the realization of earthworks, driven gravel FRANKI piles, driven reinforced concrete FRANKI piles, cast-in-place reinforced concrete foundation pads, sills and strip foundations, soil slab, base layers and reinforced concrete floors of the building including steel fibre reinforced concrete slab and cast-in-place reinforced concrete structure of the paint shop inside the production hall. It also includes damp proof layer and insulation of foundation structures. The content of this work is the technology of earthworks and all piles in the form of technological regulation. Construction costs are calculated in an itemized budget from student version of the BUILDpowerS software with a bill of quantities. The schedule is drawn up in the form of a schedule from student version of the CONTEC software. Plans are in place to ensure both quality and safety during construction.
Construction Technology study of building a house of the eko panels
Habarta, Tomáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is the description of the construction and technological study of building a family house from Ekopanel. It is an ecological diffusion free material in the form of panels, which are pressed at high temperature and pressure. Part of this technology study is time and financial plan of construction, basic concept of building operation, bill of quantities specified objects, technological regulation for the implementation anhydrite monolithic floors, precautionary measures of the construction site, listing of machinery and tools which are used, inspection and test plan and comparison of wooden buildings with brick building.

National Repository of Grey Literature : 116 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.