National Repository of Grey Literature 168 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Optimizer for Exam Scheduling at the FIT
Paulík, Miroslav ; Burget, Radek (referee) ; Kolář, Dušan (advisor)
This paper describes automated examination scheduling for the Faculty of Information Technology of Brno University of Technology. It specifies a list of restrictions that must by satisfied. Furthermore, this limitations are classified due to their influence on a quality of the final version of the examination schedule. There are two types of restrictions; soft and hard. The task is to find such a solution that satisfies all hard constraints and breaks the minimum of soft constraints using techniques described in this paper.
New building of apartment building in Brno - project planning and management of construction
Kratochvílová, Erika ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
Subject of this master´s thesis is project planning and management of construction of Apartment building in Brno. This thesis involves engineering report, block plan and block plan drawing, time schedulings, project of site equipment, design of machine formation, technological regulation of eartworks and nailig wall, test plan of eartworks and nailig wall, work safety for rough structure and budget of rough structure.
Optimization of Run Configurations of k-Wave Jobs
Sasák, Tomáš ; Jaroš, Marta (referee) ; Jaroš, Jiří (advisor)
This thesis focuses on scheduling, i.e. correct approximation of configurations used to run k-Wave simulations on supercomputers from the IT4Innovations infrastructure. Especially, for clusters Salomon and Anselm. A single work is composed of a set which contains many simulations. Every simulation is executed by some code from the k-Wave toolbox. To calculate the simulation, it is necesarry to select a suitable configuration, which means the amount of supercomputer resources (number of nodes, i.e. cores), and the duration of the rental. Creation of an ideal configuration is complicated and is even harder for an inexperienced user. The approximation is made based on the empiric data, obtained from multiple executions of different sets of simulations on given clusters. This data is stored and used by a set of approximators, which performs the actual approximation by methods of interpolation and regression. The text describes the implementation of the final scheduler. By experimenting, the most efficient methods for this problem has found out to be Akima spline, PCHIP interpolation and cubic spline. The main contribution of this work is creation of a tool which can find suitable configuration for k-Wave simulation without knowing the code or having lots of experience with its usage.
The warehouse in Polna - rough upper construction
Chroustovský, David ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
This work includes a step of rough upper construction of warehouse in Polná. Part of this work is the construction and technology report, technical report of site facilities, design of mechanical assemblies, technological prescription for ferroconcrete skeleton, technological prescription for sandwich panel cladding, a report on the wider transport relations, a report on the protection of health and safety on site. Attachments include drawings of building equipment, layout scheme cargo trailers, assembly diagrams, calculation of weight trailers, routes wider transport relations, budget and schedule.
Automated Planning and Scheduling in Manufacturing
Bucher, Michal ; Kočí, Radek (referee) ; Hrubý, Martin (advisor)
Thesis deals with a problem of automated planning and scheduling in manufacturing. Problem is formally defined by mathematical model Resource Constrained Project Scheduling Problem. Based on this model scheduling system was developed, which is using the optimizer based on Genetic algoritms. Developed system was then tested in real manufacturing. System can also visualize schedules in form of Gantt chart.
Algorithms for advance production planning and scheduling
Kršák, Pavol ; Kaczmarczyk, Václav (referee) ; Pásek, Jan (advisor)
Bachelor‘s thesis analyzes solution of operational problems of production planning. Pur- pose of the thesis is presentation of operational problems of production planning and following proposal and implementation of planning algorithms in language C# on specific planning problem. By the presentation of the problematic is listed company „COMPAS automatizace s.r.o.”, which enabled implementation of the project. The thesis analyzes planning methods and process of their implementation. More specifically the thesis ana- lyzes evolutionary algorithms, expert systems in planning and deterministic planning via linear programming. In third chapter is described in more details planning program of production of coffee blends, which was provided by COMPAS company. Like a next, the thesis describes specifically proposal of solving based on evolutionary principle. The solving consists of the model of technology designed to production of coffee blends and ActionList. ActionList represents a set of rules that are governed by model. Then ru- les are defined undergone an evolutionary process in an effort to find better solution the existing. Applied features implemented in the system COMES to repurpose by the imple- mentation of module COMES Modeller are developed together with detailed description in the fourth chapter.
Roofing of the New Apartment Building in Rajhrad
Houha, Jan ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
Content of this bachelor’s thesis is solving of technological stage of roofing of the new apartment building in Rajhrad. Roof is designed as a cold mono-pitched roof consists of metal plate-connected timber truss. Detailed procedure of assembly of the bearing timber structure and the roof sheathing is provided in specifications. Control and test plans, budget and schedule are elaborated for stage of the building roofing. The bachelor’s thesis contains technical report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for the given stage, further it solves wider relations of transport lines to construction site and occupational safety and health.
Application for Generating of School Schedules
Fiala, Jan ; Horáček, Jan (referee) ; Rozman, Jaroslav (advisor)
This work deals with problem of generating school schedules. The solution is based on three heuristic algorithms (hill-climbing, simulated annealing, genetic algorithm) and is fully implemented in JAVA. It provides a comparison of implemented heuristic algorithms including description of their pros and cons.
Construction and technological project of the telescopic covers hall - HESTEGO a.s.
Sigmund, Martin ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The content of this thesis titled "Construction and technological project of the telescopic covers hall" is building - technological solution of building together with technical, time, financial, safety, qualitative, fire and legislative solutions of selected building.
Marketing systems of construction SMEs
Muškát, Petr ; Vejtasa, Jan (referee) ; Dohnal, Radek (advisor)
The main objective of this thesis is to create an effective database system, which also serves as a source of information. The proposed system aims to facilitate and simplify the clarity of internal company information, about customers but also their employees. Then there is also the possibility to control workforce planning for individual contracts and globally but also meeting their the deadlines. We can notforget the marketing approach of the company and its public promotion.

National Repository of Grey Literature : 168 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.