National Repository of Grey Literature 39 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Building technology study of the revitalization of the Governor's Palace in Brno
Osladil, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The content of the bachelor's thesis is a construction-technology study of the revitalization of the Governor's Palace in Brno. It focuses on the main stage processes of the implementation of the repair of plasters, floors and paved area in the historically protected zone of the city of Brno. In this thesis, the traffic situation is addressed in detail with the design of routes from individual collection points and landfills to construction sites. There is also a technological study of the implementation of the main technological stages. Repairs of plasters in the exterior and interior of the building and all newly designed compositions of floor structures and reinforced surfaces with cutting works as well as making new constellations are dealt with. Based on the design documentation, I have produced a detailed statement of the acreage for all areas and the annex where the areas concerned are indicated. For both stage processes, a time and financial plan is developed using software that is an annex to the work, accompanied by a comment ary in the text section. The basic cockpit of construction traffic is also addressed with a proposal for the distribution of areas and resources for construction. For stage processes, there are 2 technological regulations in which there is a detailed procedure for all compositions and types of processes. In the chapter "Design of machinery assemblies" there is an assessment of the possible deployment of machinery with a focus on both economic and technological advantage. The work also deals in detail with safety measures at the construction site, with an emphasis on possible risks and the design of measures in the implementation of the main stage processes and behaviour at the construction site. In addition, details of the structures, continuities and protection of the monument-worthy structures are processed. This object is very special due to the preserved elements of Baroque architecture, and therefore the design of the solution is directed towards the highest level of preservation and preservation of the monument.
Assessment of Risk Related to Violations of Labour Safety Regulations in Selected High-Risk Professions and its Prevention
Hoferková, Tereza ; Koláček, Petr (referee) ; Popelová, Barbora (advisor)
This diploma thesis deals with the field of safety and health at work. Based on the Czech Republic, the EU, and Finland´s current state analysis, a questionnaire survey is conducted, followed by methods such as Brainstorming, What if and FMEA to eliminate and manage risks. The thesis aims to propose measures minimizing the risks associated with violation or non-compliance with safety principles in a selected risky profession of stonecutting. At the same time, the thesis provides a financial evaluation of the proposed measures.
Realization of the gross under-construction of the housing complex in Trenčín
Gunár, Juraj ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
The bachelor thesis deals with construction technological project of the gross under-construction of the SO 203 objects of the housing complex Olbrachtova. The object is the realisation of drilled pille and foundation structures. The project includes the technical report, transport routes, technological instruction for drilled piles and foundation structures, technical report for construction-organisation principles and equipment of building yard, budget time-planing, machine configuration, controlling and examining plan of the phase, safety and risk plan on the construction site and all drawing concerning the problem.
Preparation of Construction and OSH
Vaculík, Jakub ; Šopík, Josef (referee) ; Nováková, Jana (advisor)
This study investigates the management of a construction project from the building contractor’s point of view. The main aim is to describe the construction readiness process, including the technical drawings, risk assessment and OSH solutions. The literature review provides an overview of the key terminology used in the management of a construction site, contractor readiness and OSH. The practical section of this study then describes order preparation, construction readiness, risk assessment, OSH solutions and fire risk assessment for the I/43 Milonice intersection turn lane.
Construction of the Lavimont production hall - building technology project
Máčal, Filip ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is a construction-technological project of the Lavimont production hall in Brno Tuřany. The thesis deals with solution of off-road transport, supply, design of main building machines and mechanisms, ensuring safety and protection of health at work, ecology and environmental protection. The thesis also deals with the optimal construction of site equipment, pumping of resources during construction and solves the total time demands of the construction of this hall. Part of the diploma thesis is also solving the problems related to construction procedures, including the elaboration of a technological regulation and examples of the use of BIM technology in the construction process.
Project planning and management of construction of the regional branch of VZP in Jihlava
Pevný, Ondřej ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
Abstract The aim of this thesis is the preparation of the building and technological project of the regional department of the company VZP CR in Jihlava. The content of this thesis is the elaboration of technological regulations for reinforced concrete and prefabricated skeleton and for monolithic external walls. The quality and characteristics of these constructions are solved in the controlled and test plans. Site facilities including occupational safety and health,transport routes for transporting of materials and traffic around the site are addressed in detail in the next section of this thesis. Optimally designed set of machines for realization of this construction is included as well. The diploma thesis determines work procedures so as to take into account the economic aspect and time demands of construction.
Outbuilding School - building and technological project
Cimflová, Lucie ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
Diploma thesis deals with construction technological project for extension of school. Contents of construction technological project are project engineering report, study of realization of main technological stages, engineering report of site equipment, proposal of construction machines, etc. In detail thesis deals with load-bearing structure of cross laminated timber and the technological note, inspection and testing plan.
Comparison of components produced by turning technology
Palátová, Zuzana ; Chladil, Josef (referee) ; Kalivoda, Milan (advisor)
The Bachelor's work includes the suggestion of non-functioning components and subsequent production with differing parameters, which are then processed and evaluated. The theoretical part of my work includes an analysis of individual factors, concretely job security, operator qualifications, kind of universal machine, splinter analysis and technological procedure. The practical part of my work consists of making components and dealing with the work of individual turners. The challenges of the whole work and suggestions for improvement are discussed in the discussion.
Implementation of gross superstructure administrative buildings Multifen
Pevný, Ondřej ; Pokutová, Tereza (referee) ; Kantová, Radka (advisor)
This bachelor thesis focuses on a description of a constructive technological stage of the gross superstructure of MULTIFEN s.r.o. company building. The thesis contains technical reports for masonry and monolithic constructions. The quality of these constructions is solved in the control and test planes. The site equipment including occupational safety and health, routes for transport of material, and the traffic situation around the construction site is solved in detail. A mechanical set for the building construction is optimally designed. The thesis sets the work procedures in order to consider economical and time demands of the building schedule.
The Suggestion of the Work Conditions in the Company
Foltýn, Jiří ; Najvirt, Jiří (referee) ; Lajtkepová, Eva (advisor)
Master's thesis is focused on work conditions area in selected company, especially on occupational health and safety. The purpose of this thesis is to analyze work conditions, which are in the company nowadays, and to create suggestion, which should lead to the correction of eventual gaps. This correction should lead to the improvement of the work conditions in the company, and should be also acceptable for the company.

National Repository of Grey Literature : 39 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.