National Repository of Grey Literature 314 records found  beginprevious305 - 314  jump to record: Search took 0.01 seconds. 
Proposal of the Manufacturing Resource Planning System Implementation
Rzepka, Jakub ; Orlík, Antotnín (referee) ; Videcká, Zdeňka (advisor)
Master thesis inquires into proposal of the manufacturing resource planning system implementation into a small manufacturing company. Proposal is based on the information strategy of current processes status analysis and actual software & hardware equipment. Solution also contains the selection of information system implementation supplier and evaluate benefits of proposed information system implementation.
WPKS System Implementation in Precheza, a.s.
Dýčková, Petra ; Vosáhlo, Zdeněk (referee) ; Videcká, Zdeňka (advisor)
Intention of this thesis is the Workcenter PKS system implementation project in Precheza a.s., Přerov, implementation outputs and assessment of implementation advantages for the company and its employees. Currently the WPKS system has been purchased and comes over from the analytic phase to the implementation phase. In the designing section I will concentrate on implementation detailed planning, i.e. on detailed elaboration of production process maps, on process sequence designing, project team members and on drawing the total WPKS system implementation schedule. Also, financial contribution of the project will be assessed from the cost and effectiveness point of view.
Optimization of Material Flow in the Moulding Shop
Čermák, Jaroslav ; Štěpánek, Kvido (referee) ; Videcká, Zdeňka (advisor)
Subject of the graduation theses is to propose improvement of the current terms and make a proposal for an amendment. Changes leading to the transportation retrenchment and to reduction of the material and moulding usage. Teoretical part contains characteristics of processes, methodology and philoshophy for improving of company processes.In the practical part is analysed problem, made propositions of process improvement and estimation of contributions solutions.
Information System Design in the Machine Company
Niedoba, Daniel ; Šunka,, Josef (referee) ; Videcká, Zdeňka (advisor)
This diploma work analyses order to cash process in the company which core business lies within steel construction zinc dipping, preparation of technical proposals and providing of services in transportation and manual works. This thesis includes proposals for process optimization with aim to select new IT system which leads to cost reduction and eventually to the enhancement of company’s effectiveness.
Software support of the enterprise processes
Straka, Michal ; Jelínek, Petr (referee) ; Videcká, Zdeňka (advisor)
Master’s thesis solves the problem of design and implementation of the management information system directed on monitoring productivity of labour in the company. It’s main goal is to – based on the analysis of the actual state - create new, automated, identification and registration software system, which will serve to production leaders as a support for operative management. Project solves the problem of automation of data processing, automation of creation of continuous analyses and monitoring the productivity of labour in the key process of the company – the process of assembling of packages – with the ability to determine instant working performance and productivity of an individual worker.
Application of Quality Tools according to ČSN ISO 9000 Standards
Gálik, Petr ; Šišková, Věra (referee) ; Videcká, Zdeňka (advisor)
Subject of the project is a concept of utilization of the basic quality devices during monitoring of critical parameters of silicon monocrystals’ production.
Optimization of the process of corrective and preventive actions management
Novák, Pavel ; Ing. et Ing. Radek Dryšl, MSc., MBA (referee) ; Videcká, Zdeňka (advisor)
This master’s thesis deals with the optimization of the process of corrective and preventive actions management in OTIS Escalators s.r.o. under ISO 9001:2000, ISO 14001:2005 and OHSAS 18001:1999 standards. Standards mentioned above are used to describe analyse of the process, which leads to several steps for successful optimization of the process.
Process Optimization of the Production Line
Prokop, Aleš ; Hradecká, Lenka (referee) ; Videcká, Zdeňka (advisor)
This thesis presents simulation method and simulation software Witness as a decision management instrument of a company, applied in STEKO spol. s r.o. The goal of this thesis is to create a model of real business process in the simulation program and following optimalization.
Concept of Business Intelligence Using for SME's
Stryka, Lukáš ; Soukup, Lukáš (referee) ; Videcká, Zdeňka (advisor)
This Diploma Thesis deals with analysis of the current processes in small software company. On the basis of the weakness evaluation, the new extensions of the information system are designed. The first extension is new module for on-line sale and cashless on-line payment. The second one is integration of Business Intelligence tools to help streamline marketing strategies of this company.
Optimization of Business Processes
Květoňová, Šárka ; Šimek, Václav (referee) ; Videcká, Zdeňka (advisor)
This Master Thesis deals with the theory of business processes and with the possibilities of their organization and optimization. Each business process describes a flow of documents, finance, pieces of information and tasks from one member of the process to the other. Appropriate structure and coordination of the business processes and understanding of their mutual relations, too, can be seen as same of the most important features of successful modern business. Workflow is a very similar term to business process. Workflow allows its automating and computer processing. On the basis of the thorough business processes analysis of a selected business is the main goal of my work to optimize selected business processes with project management support. In concrete, the project management theory and MS Project 2000 will be used to planning and realization of the intended changes. The minor goal is to propose a partial reengineering of selected business processes by way of ERP system implementation. The new management structure planning of business processes was also proposed and realized by MS Project. The outputs of the MS Project contain partly the total budget of the planned processes reengineering, partly the time sheets with detailed roles and other resources mapping. In conclusion, the total savings are described.

National Repository of Grey Literature : 314 records found   beginprevious305 - 314  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.