National Repository of Grey Literature 29 records found  previous8 - 17nextend  jump to record: Search took 0.00 seconds. 
Construction-technological project for the construction of a central charging station in Púchov
Stopka, Peter ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
This diploma thesis focuses on the construction of a construction technological project for the construction of the Central Charging Station in Púchov. The building is located in the industrial area of Púchov and in the area of Continental Matador Rubber. In the thesis is elaborated technical report for building technological project, co-ordination situation of construction with wider transport routes, time and financial object plan, study of the realization of the main technological stages, construction site design, design of main building machines and mechanisms, time schedule of main building, securing material resources for the monolithic part of the building. In the thesis are made, technological rules for drilled pilots and ceiling structure above the first overground floor. Technological regulations follow control and test plans. Other assignments that have been made in this work, such as the occupational safety and health plan, the design and comparison of cranes and the item budget.
Center for leisure activities
Kovaříková, Kristýna ; Utíkal, Aleš (referee) ; Utíkalová, Ivana (advisor)
The aim of the diploma thesis is to design and develop project documentation for the new construction of the leisure activity center. The building is located on a plot of land with plot numbers 84/4, 84/6 and 120/4 in Olšany u Prostějova. The plots are flat and undeveloped. The building is designed as a detached, two-story building with a partial basement. The basement contains the building's technical facilities, a cleaning room and a warehouse. On the ground floor there is a small cafe with a terrace, a relaxation area, a classroom, sanitary facilities, a reception, a hall intended for holding cultural events and the facilities of the hall. On the 2nd floor there are classrooms, sanitary facilities and the management office. The object is designed as barrier-free. The vertical structures are made of silica sand-based blocks of the Porfix system. The perimeter and internal load-bearing masonry in the basement is monolithic reinforced concrete. The construction is based on foundation belts made of plain concrete C20/25 and a 150 mm thick underlying concrete screed reinforced with KARI mesh. The building is insulated with 200 mm thick mineral wool. Part of the building is insulated with the ETICS contact insulation system with a surface treatment of thin-layer plaster, and part of it has a ventilated facade with laminate facade cladding. The windows and doors are plastic with triple insulating glass.
Reinforced concrete structure of a multifunction building
Marková, Anna ; Buřič, Pavel (referee) ; Šulák, Pavel (advisor)
The aim of this qualification thesis is to design a reinforced concrete monolithic ceiling construction of typical floor. It concerns locally supported panel that is 250 mm thick and of irregular shape. The spread of the span is 6 x 6 m with the overshoot of 1,2 m. Inside the building there is a staircase with a lift and a plumbing stack that is surrounded by the monolithic reinforced concrete wall that is 300 mm thick. The structural height of the floor is 3500 mm. The pillars` cross-sections are 450/450 mm. An analysis using the end-element method, a static design and a drawing documentation of the ceiling panel were conducted within this thesis.
Nursery school in Tišnov
Kerberová, Lenka ; Rozehnal, Miroslav (referee) ; Štěpánek, Ladislav (advisor)
The new building Nursery school is situated in Tisnov. Under the two storey building partialy runs basement. On the ground floor is located two departments nursery school with economic part. On the second floor is the classrooms and socialrooms. In the basement are mainly storerooms and utility rooms. The building is made of ceramic bricks and insulation contact system. The first storey is partly roofed with a flat roof and the second storey is sloped roof roofed. The building is constructed on footing foundations.
Construction technology study stage of execution upper rough construction of a residential building
Kubíček, Lukáš ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The aim of my thesis is the construction technology study stage of execution upper rougr construction of a residentail in Medlanky. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Health Centre Vizovice - rough construction
Chamrádová, Klára ; Bravenec, Roman (referee) ; Biely, Boris (advisor)
The aim of my thesis is the construction and technological solutions to new building construction site health center in Vizovice. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
Implementation of the gross overhead construction of the Jemnice residential building
Pozler, Tomáš ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The bachelor thesis deals with the implementation of the gross overhead construction of the Jemnice residential building. The content of the thesis is the technological regulations for masonry and monolithic construction. It is complemented by a layout of used machinery, all material transport, a measurement report, a detailed timetable and a budget. The chapters dealing with the great demands on the quality of the building project and the safety during its construction are included in the thesis. There is technical report of the construction site equipment, including its drawing. An alternative design of the outline shell with thermal insulation is in a separate chapter. It compares the differences between price and time, complemented with a measurement report. The proposal is supported by relevant details.
Apartment building
Zítko, Ondřej ; Svoboda, David (referee) ; Čuprová, Danuše (advisor)
The subject of this bachelor's thesis is the design of a new apartment building. The apartment building is located in the peripheral, partially built-up part of the city. The proposed building contains a total of 7 residential units spread over a total of three above-ground floors. The basement of the building is treated as partial and there is a cellar cubicle for each housing unit, a room for photovoltaic equipment, a drying room, storage rooms and a common room. The house has a simple rectangular floor plan and its main highlight is undoubtedly the spacious terrace for the apartments located on the third floor. The building is based on foundations to a frost-free depth. The vertical support system of the above-ground floors is made of ceramic blocks, the underground floor is made from the shapes of lost formwork. Horizontal load-bearing ceiling structures formed as reinforced concrete monolithic supplemented with reinforced concrete crowns. The building is covered with a single-pitch flat roof with extensive vegetation.
Preparation for the implementation of apartment buildings Uničov, Pod Šibeníkem
Hanzlíček, Ondřej ; Průcha, Aleš (referee) ; Kantová, Radka (advisor)
The subject of this master´s thesis is the preparation for the implementation of apartment buildings Uničov, Pod Šibeníkem. The entire thesis is primarily focused on the construction technology project of apartment building "A". Its content is a technical report on the construction technology project, a solution to transport relations for transporting machines to the construction site, a construction technology study, a technical report on construction site equipment, technological regulations for foundation structures, masonry and ceiling construction, a design of a machine assembly, a safety and health protection plan during work, inspection and test plans for foundation structures, masonry and execution of ceiling construction. In the attachment part, you can find the workflow of selected constructions, the rough construction budget, the rough construction schedule and details.

National Repository of Grey Literature : 29 records found   previous8 - 17nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.