National Repository of Grey Literature 56 records found  beginprevious47 - 56  jump to record: Search took 0.01 seconds. 
Construction technology study stage of execution upper rough construction of a residential building
Kubíček, Lukáš ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The aim of my thesis is the construction technology study stage of execution upper rougr construction of a residentail in Medlanky. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
BIKEZONE.cz - Bikeshop with flats
Barták, Martin ; Šuhajdová, Eva (referee) ; Šuhajda, Karel (advisor)
The aim of the diploma thesis „BIKEZONE.CZ – bikeshop with flats“ is development of detailed documentation to build the bikeshop with flats for permanent living for sixty person on the land number 337/4, in the city named Hradec Králové – Kukleny. The building is designed with the master plan and the surrounding construction and appropriately mounted on the adjacent intersection. The building is designed as a four-floors, partial basement with two-floors bikeshop with own service and the flat part with seventeen flats of the size two or three bedrooms with kitchen. Next to building are designed two car parkings with capacity for 25 cars. The main entrance to the shop is from the street Pražská třída where is a parking for customers a the main entrace to the flat house is from the street Pálenecká. The supporting part will consist of a combination of sand-lime bricks KM BETA and monolithic ceiling and column. The non-supporting part will of sand-lime bricks KM BETA. The roof is flat with a waterproofing membrane of flexible PVC surcharge laundered gravel. Insulation of the building envelope will contact system ETICS terminated blending facade of dark and light gray colors. Doors and windows are wooden with golden oak color shade.
Sheltered housing Rajhrad - construction technology project
Kubišová, Jana ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The aim of thesis is construction-technology project of sheltered housing in Rajhrad. Parts of the thesis are technical report of site facilities, technological prescription for monolithic ceiling construction, inspection and test plan for monolithic ceiling construction, proposal of mechanical assemblies and transport relations, occupational safety and health, environmental plan, compared of monolithic and prefabricated staircases, the draft contract for work and binding rules for use of the building, financing construction cost, schedule.
The community center in the Czech Budejovice - Construction Technology Project
Vondrák, Tomáš ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.
Nursery school in Tišnov
Kerberová, Lenka ; Rozehnal, Miroslav (referee) ; Štěpánek, Ladislav (advisor)
The new building Nursery school is situated in Tisnov. Under the two storey building partialy runs basement. On the ground floor is located two departments nursery school with economic part. On the second floor is the classrooms and socialrooms. In the basement are mainly storerooms and utility rooms. The building is made of ceramic bricks and insulation contact system. The first storey is partly roofed with a flat roof and the second storey is sloped roof roofed. The building is constructed on footing foundations.
Wellness Sports-center with Accomodation
Brtníčková, Jitka ; Rychnovský, Václav (referee) ; Králová, Zuzana (advisor)
The new building of Sport and Relaxation Centre with the possibility of accommodation is situated on the vacant site in Blansko. Under the three storey building partialy runs basement. On the ground floor is located a restaurant with facilities, also rooms for sport and relaxation. On the second and the third floor is the centre’s accommodation with a total capacity of 38 persons. In the basement are mainly storerooms and utility rooms. The building is made of ceramic bricks. The ceiling construction is monolithic and the building has a flat roof. The building is constructed on footing foundations and strip foundations.
Health Centre Vizovice - rough construction
Chamrádová, Klára ; Bravenec, Roman (referee) ; Biely, Boris (advisor)
The aim of my thesis is the construction and technological solutions to new building construction site health center in Vizovice. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
Building-Technological study of ENVI Centre
Doruška, Jan ; Valenta, Michal (referee) ; Diaz, Yvetta (advisor)
Bachelor thesis contains selected parts of the building and technological studies for building an educational center in ENVI Vysoke Pole. That the processing of documentation is primarily a technological study of the implementation of the main technological stages for the specified object, time and financial plan construction, the basic concept of building operation, itemized budget with bills of quantities, technological regulation for the implementation of the double-skinned walls, security measures for the implementation of monolithic reinforced concrete ceiling and control test plan.
Reinforced concrete structure of a multifunction building
Marková, Anna ; Buřič, Pavel (referee) ; Šulák, Pavel (advisor)
The aim of this qualification thesis is to design a reinforced concrete monolithic ceiling construction of typical floor. It concerns locally supported panel that is 250 mm thick and of irregular shape. The spread of the span is 6 x 6 m with the overshoot of 1,2 m. Inside the building there is a staircase with a lift and a plumbing stack that is surrounded by the monolithic reinforced concrete wall that is 300 mm thick. The structural height of the floor is 3500 mm. The pillars` cross-sections are 450/450 mm. An analysis using the end-element method, a static design and a drawing documentation of the ceiling panel were conducted within this thesis.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.

National Repository of Grey Literature : 56 records found   beginprevious47 - 56  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.